|
| 1 | 1.0) Running, maintenance and operation of clear water booster P/Set, submersible pump set DG Set ,IEI and compound lighting at 201 SFS Flats Gazipur as per the inventory, terms & condition anddeploying the following manpower :a).OperatorGrade-II - 2 Nos. ( 6 AM to 2 PM & 2 PM to 10 PM, one in each shift)b).Khallasi - 1No. ( 10 PM to 6 AM ) |
| 2 | 2.0) Running, maintenance and operation of submersible pump set and clear water booster pump set at PSP Mandwali fazalpur (Extended area).as per inventory, terms & condition attached.a).OperatorGrade-II - 2 Nos. ( 6 AM to 2 PM & 2 PM to 10 PM, one in each shift)b).Khallasi - 1No. ( 10 PM to 6 AM ) |
| 3 | 3.0)Providing watch & ward for submersible pump set and clear water booster pump set at LSC automobile training centre at Gazipuras per inventory, terms & condition attached.a). Khallasi 3 Nos. one in each shift or as required by Engineer-in-charge.) |
| 4 | 4.0)Providing watch & ward for clear water pump set and DG set at Command Tank CBD Shahdara as per the inventory, terms & condition and deploying the following manpower. a). Khallasi 3 Nos. one in each shift or as required by Engineer-in-charge. |
| 5 | 5.0)Replacement of defective/ faulty of following parts in existing electrical panel board i/c testing etc. as ifrequired. |
| 6 | 5.1) DOL Starter suitable for 7.5 HP. (make- L&T or similar superior ) |
| 7 | 5.2) ML- 1.5 Starter (L&T make ML- 1.5 FASD)(make- L&T or similar superior) |
| 8 | 5.3) 3 Pole 32 Amp. Contactor(make- L&T or similar superior) |
| 9 | 5.4) 63 Amp.TP&N Switch SFU Type (make- L&T or similar superior) |
| 10 | 5.5) Digital A. Meter, V. Meter of suitable range(make- AE or similar superior) |
| 11 | 5.6) Single phase preventer (make- AE or similar superior) |
| 12 | 6.0)Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel,making connections, Ics=100% Icu and Operational Voltage 690V etc. as required. |
| 13 | 6.1) 200 A, 25 KA,TPMCCB |
| 14 | 6.2) 200 A,36KA,FPMCCB |
| 15 | 7.0) Repairing & rewinding of 3 HP monoblock clear/dewatering pump set (make- Kirloskar)i/cdismentling, re-assembling and testingetc.complete as if reqd. |
| 16 | 7.1) S/R of Ball bearing |
| 17 | 7.2) S/R Rewinding of motor |
| 18 | 7.3) S/R Connection Plate |
| 19 | 7.4)S/R of Gland Sleeve |
| 20 | 8.0) Repairing & rewinding of 5 HP monoblock dewatering pump set (make- Kirloskar)i/cdismentling ,re-assembling and testingetc.complete as if reqd. |
| 21 | 8.1) S/R of Ball bearing |
| 22 | 8.2)S/R Rewinding of motor |
| 23 | 8.3)S/R Connection Plate |
| 24 | 8.4)S/R of Gland Sleeve |
| 25 | 9.0) Repairing & rewinding of7.5 H.P. monoblock water pump set(make Kirloskar)i/c dismentaling,reassembly,cartage,testing etc. complete as if reqd. |
| 26 | 9.1)S/R of Ball bearing |
| 27 | 9.2)S/R Rewinding of Motor |
| 28 | 9.3)S/R Connection Plate |
| 29 | 9.4)S/R of gland sleeve |