Supply Of Supply, Installation, Testing, Commissioning And Proving Out Of Rotary Screw Electric Driven Air Compressor, Capacity -300 Cfm As Per Cofmow Spec. No.- Cofmow/Ir/Edac/2019(Rev.-01) Schedule-Ib
Tender Overview
Project Description
Supply Of Supply, Installation, Testing, Commissioning And Proving Out Of Rotary Screw Electric Driven Air Compressor, Capacity -300 Cfm As Per Cofmow Spec. No.- Cofmow/Ir/Edac/2019(Rev.-01) Schedule-Ibsupply, Installation, Testing, Commissioning And Proving Out Of Rotary Screw Electric Driven Air Compressor, Capacity -300 Cfm As Per Cofmow Spec. No.- Cofmow/Ir/Edac/2019(Rev.-01) Schedule-Ib,The Cost Of The Basic Rotary Screw Electric Driven Air Compressor,Capacity -300 Cfm Meetin G The Requirement Of Technical Specification Cofmow Spec. No.- Cofmow/Ir/ Edac/2019(Rev.-01) Sched Ule-Ib Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Cost Of Comprehensive Amc For Five Years After The Expiry Of Warranty Period (30 Months) As Per Clause 17 Of Section V Of Specification Attached [ Warranty Period: 2 Years, Amc Period: 5 Years, R Ate Of Discounting: 10 % ] ] At (Location) Sse/30/Carr/Kgpws, Ser West Bengal 2.00 Numbers 3 6505X001 Essential Non Stock --- Yes Tpi Agency Inr Spares (Y) The Cost Of Concomitant Accessories Specified In Clause 4.2 Of Section Iv Of Specification Atta Ched. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Consignee Sse/30/Carr/Kgpws, Ser West Bengal 2.00 Set Product Inspection:Stage 1: Raw Material Inspection (100% Of Po Qty ), Stage 2: In Inspection Details Process Inspection (100% Of Po Qty ) 4 6505X002 Essential Non Stock --- Yes Tpi Agency Inr Spares (Y) Cost Of Any Other Accessory Which In The Opinion Of Supplier Is Essentially Required For Making The Machine Fully Functional. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Consignee Sse/30/Carr/Kgpws, Ser West Bengal 2.00 Set Page 1 Of 7 Run Date/Time: 06/01/2026 16:14:45Wcs/Kgp/South Eastern Rly Tender Document Tender No Ad255724 Closing Date/Time 05/02/2026 14:00 Product Inspection:Stage 1: Raw Material Inspection (100% Of Po Qty ), Stage 2: In Inspection Details Process Inspection (100% Of Po Qty ) 5 6505X003 Essential Non Stock --- Yes Cons
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender