| 1 | Drilling of perfectly vertical bore hole of a diameter suitable to receive 150 mm nominal diameter casing pipe upto desired depth below ground level inclusive of the labour charges for transporting, lowering and fixing of 150 mm nominal diameter M.S./G.I./ U.P.V.C. casing pipe inside the bore hole including all works pertaining to drilling such as transportation, installation and removal of drilling machine etc. complete. |
| 2 | (a) in all types of collapsible strata consisting of soils, clays, sand, moorum, gravel, boulders etc. |
| 3 | (b) in all types of rocks. |
| 4 | Drilling of perfectly vertical bore hole of 150 m.m.diameter up to desired depth below ground level in all typesof rock including all works pertaining to drilling such astransportation, installation and removal of drilling machineetc. complete. |
| 5 | Drilling of perfectly vertical bore hole of 125mm diameterup to desired depth below ground level un all types of strataincluding all works pertaining to drilling such astransportation installation and removal of drilling machineetc. complete in intertrappean formations (collapsible stratabetween rocks) including charges for transportation andmaking all necessary arrangements’ etc, including loweringand fixing of 125 mm nominal diameter (G.I. or U.P.V.C.casing pipe . |
| 6 | In all type of collapsible strata consisting of soils, clays,sand , moorum, gravel, boulders etc. |
| 7 | in all types of rocks. |
| 8 | Drilling of perfectly vertical bore hole of 115mmdiameter upto desired depth below ground level in alltypes of rock including all works pertaining to drillingsuch as transportation, installation and removal ofdrilling machine etc. complete |
| 9 | Measurement of yield of tube well by operating hand pump continuously for four hours manually. |
| 10 | Disinfection of tube well using bleaching powder solution as per the direction of the Engineer-in- Charge including the cost of bleaching power and labour etc. complete |
| 11 | Labour charges for installation of India Mark II Hand Pump with 30 meter long 32mm dia riser pipe assembly and all other accessories including transportation of Hand Pump from specified departmental stores to site. |
| 12 | Add to item No. 1 above for fixing the extra length of riser pipe assembly beyond 30 meters U.S.O.R. page no. 321 Item No. 23.2) . |
| 13 | Construction of 76 cm x 76 cm x 40 cm foundationblock in 1:2:4 cement concrete for fixing the pedestalof Hand Pump including excavation , cost of materialand labours etc. complete. |
| 14 | Construction of cement concrete platform as per design around the hand pump in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labours and curing etc.complete. |
| 15 | Construction of cement concrete drain as per designin 1:2:4 cement concrete including excavation,centering, shuttering, cost of all the materials and labour and curing etc. complete. |
| 16 | Construction of 1.20 cm x 1.20 cm x 0.20 m cement concrete washing platform in cement concrete 1:2:4 including excavation, centering, shuttering, cost of all the materials and labour and curing etc. complete. |
| 17 | Construction of sokage pit of 70 cm dia. And 1.0 m deep including excavation, brick lining at top in 1:4 cement mortar, filling broken bricks etc. and cost of all the materials and labour and curing etc. complete. |
| 18 | Providing and fixing of well cap on top of the tube well for protection M.S.Caps( c) 150 mm dia |
| 19 | Construction of concete block over dry tube wells for protection of size 0.45 m x 0.45m x 0.45 m in M-15 cement concete mix. Please Enable Macros to View BoQ information |