| 1 | Dismentaling of B.O.E. soiling/interlocking tile including stacking of servicable material and disposal of unservicable within a lead 50m as per etc all complete. |
| 2 | Sale of material to contractor Old interlocking tiles etc all complete |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as per directed by engineer-in-charge:2.1.1 all kind soil |
| 4 | class 150 brick work in 1:4 cement mortar in foundation & plingth including supply of all materials labour etc all complete.... |
| 5 | 12 mm cement plaster of mix 1:4 etc all complete... |
| 6 | providing Laying spreading and compacting graded stone aggregates to Wet mix macadam(W.M.M) specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site. laying in uniform layers with paver in sub-base course on well prepared surface and compacting with vibratory roller to achieve the desire density as per MORT & H-406 |
| 7 | Prov./applying tack coat with bitumen using at the rate of 0.30 kg per sqm as phalt beforeD.G.B.M.& B.C.layer including etc.all complete. |
| 8 | Dense Graded Bituminous macadam (DGBM) (average) bituminour macadam with 60-90 TPH batch type HMP type hot mix plant producing an average output of 75 tonnes per hour crushed aggregates of specified grading permixed with bitumenour binder @ 4.5 per cent of mix and filler transporting the mix with paver finisher etc.all complete work. |
| 9 | Prov./laying bitumious concrete (BC) (average) with computrised HMP type hot mix plant producing an average output of 75 tonnes per hour crushed aggregates of specified grading permixed with bitumenour binder (CRMB) @ 5.4 per cent of mix and filler transporting the mix with paver finisher etc.all complete work. |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15* landings, balconles, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth kg level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | Construction of granular sub base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavaton at OMC and compacting with vibratory roller to achieve the desired density, Complete as per MORT & H clause 402 |
| 13 | Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500. |
| 14 | Laying old cement concrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc all complete. (Old cc paver block shall be supplied by the department free of cost) |
| 15 | Cartage of earth upto 3.00 km including loading & unloading but excluding stacking on pucca road etc all.complete. Ch-3 (231 a) |
| 16 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work in plinth level: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). |
| 17 | S/F of sign board with padestal including material all complete. |
| 18 | TAX18% Please Enable Macros to View BoQ information |