|
| 1 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m ,as directed by engg-in-charge:2.1.1 All kinds of soil. |
| 2 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 200 mm nominal size |
| 3 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15\" landing, bolconies, shelves, chajjas, lintels , bands, plain, window sills, stair cases and spiral stair cases above plinth up to floor five, level excluding the cost of centering, shuttering, finishing and reinforcemen, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded). |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level. Thermo mechanically treated bars of grade Fe-500D or more. |
| 5 | Brick work with common burnt clay (non modular) bricks of class-150 in super structure above plinth level up to floor V level in all shapes and sizes cement mortar 1:4 (1 cement : 4 coarse sand) |
| 6 | Providng & fixing 18mm thick granite (gang saw cut), mirror polished premoulded and prepolished, machine cut for kitchen platforms, |
| 7 | Providing and fixing by stainless steel hand railing etc all com. |
| 8 | S/I aerylie latter (With LED) |
| 9 | S/I 3 to 6 LED stock/spike etc all com. |
| 10 | S/F Artificial green grass etc all complete. |
| 11 | S/F of flower pot filled with soil and fertilizer etc all complete. |
| 12 | S/F of flood light etc all completed work. |
| 13 | S/F of stainless steel bench with back rest etc all com. |
| 14 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |