| 1 | Dismantling old interlocking tiles including stacking of servicable materials and disposale of unservicable materials within a lead of 50 meters as per dircticon of EI/C. |
| 2 | Dismantiling cement concrete pavement by mechanical means using pneumatic tools. Breakingg to pieces not exceeding 0.02 Cum in volume and stcok piiling at designated locations and disposal of dismantied materials up to a lead of 1000 meters, stacking servicable and unservicable materials separately. (PWD SOR 2025-26, Chepter-10, Item No.6) |
| 3 | Deduction for old dismantled interlockiing tiles……………………all complete. |
| 4 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 6 | Class-150 Brick work in 1:4 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) |
| 7 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.(PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1) |
| 8 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side fromwork (steel channel laying and fixing of 125 micron thick polythene film, wedges,,.......... Complete.) Chapter -20 (New Item). |
| 9 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1.3) |
| 10 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No. 8 spec. No. 5.1) |
| 11 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 12 | Supply and fixing Manak board …………………….. All Complete. |
| 13 | Construction of Inauguration /Silla patta board using brick work and granite stone …………. All complete. Please Enable Macros to View BoQ information |