| 1 | (Park)Earth work in Filling with Hard Soil |
| 2 | Carrige of Earth Lead 03Km |
| 3 | Laying of Lawan including ploughing leveling breaking of clods manuring and removal of stone etc (Cost of manure of extra good earth to be paid seperatley) Maintenance of lawns for 30 Days of more till the grass forms a thick lawns free from weeds and fit for mowing in the duration of planting if lawn die some where the contractor will replant it at his.... In Rows 15cms apart in etiher Direction |
| 4 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. In hard soil. |
| 5 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 6 | S and F Glazed Tiles on Walls |
| 7 | S and F Gate and Grill |
| 8 | Enamal Painting on Shutters |
| 9 | finishing wall with acrylic smooth exterior paint of required shade including all scaffolding new work (Two or more coat including base coat of water proofing cement paint) PWD BSR-2022 -Less 10% |
| 10 | Providing and laying cement Interlocking Bricks M-30 Grade 60mm Thick |
| 11 | Plants |
| 12 | Drip System |
| 13 | (Pyau Nirman)Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. In hard soil. |
| 14 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 15 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 16 | Brick work in super structure using bricks of class designation-75 in CM 1:6 |
| 17 | S & F Stone lintels |
| 18 | P & L First class stone slab roof in CM 1:4 |
| 19 | P & L brick bats on roof in CM 1:4 |
| 20 | S & F Glaze tiles on roof |
| 21 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. (PWD BSR-2022 Less-10%) jhunjhnu/Jalore Red, Black, Choklate 1501 Cm2 to 3600cm2 Tiles |
| 22 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 23 | Providing and Applying white cement based putty over plastered surface to prepare the surface even and smooth complete (PWD BSR-2022- Less 10%) |
| 24 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -PWD BSR -2022 - Less 10%) |
| 25 | Wall painting with plastic emulsion paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -PWD BSR-2022- Less 10%) |
| 26 | S and F Iron door |
| 27 | Cement Concrete in ffloor with stone ballast size 40mm including curing and compaction etc 1:6:12 mix |
| 28 | S and F Polished Kota Stone |
| 29 | S and F Water Cooler - 200Ltr |
| 30 | Aquaguard Auro 2 Life 7 L RO+IV+Copper water fitting |
| 31 | Wiring for fan/light point in PVC condut pipe as per specification |
| 32 | Wiring for circuit/submain as per specification- 2x1.5Sqmm |
| 33 | S & F PVC water storage tank |
| 34 | P and L GI/UPVC pipe 15mm |
| 35 | S amd F Bib Cock |
| 36 | S & F Full way valve-20mm |
| 37 | Yojna board & Contingency charges Please Enable Macros to View BoQ information |