| 1 | Cooling Towers -having 2cells with each cell capacity 1050 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Chlorine dioxide ,Chemical dosing & other requireddosing as per scope for cooling watertreatment,Thirdparty Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, ErectionandInstallationofTower,Mechanicalequipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor\"s scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning, Supply of chemicals and consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days, performance guarantee test run and six months consumption of plant operation after completion of 30 days of trial run post commissioning, and fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning |