|
| 1 | 1.0) Running, maintenance operation of sewage pump set along with diesel engine pump Set at Dallupuraas per the inventory, terms & condition and deploying the following manpower :Operator- Grade-II - 2 Nos. (6AM to 2PM & 2PM to 10PM)Khallasi - 1 No.(10.00 pm to 6.00 am) |
| 2 | 2.0) Providing watch & ward for submersible pump set and clear water booster pump set and DG set atDistt. Centre, Mayur Palace, Mayur ViharPhase-I as per the inventory, terms & condition and deploying the following manpower :a). Khallasi 3 Nos. one in each shift or as required by Engineer-in-charge. |
| 3 | 3.0) Running, maintenance and operation of clear water booster pump set, submersible pump set& DG Set i/c routine, preventive & breakdown maintenance of electrical installations at District Centre Jasola as per the inventory, terms & conditions and deploying the following manpower :a). Operator Grade-II - 2 Nos. ( 6 AM to 2 PM & 2 PM to 10 PM, one in each shift)b). Khallasi - 1No. ( 10 PM to 6 AM ) |
| 4 | 4.0) Replacement of defective/ faulty12 volt D.C Battery, 180 AH, fully charged for DG set of 3 phase, 440 volt i/c connection, testing, commissioning and cartage etc. complete as if required. |
| 5 | 5.0)Replacement of defective/ faulty of following parts in existing electrical panel board i/c testing etc. as ifrequired. |
| 6 | 5.1) (a) DOL Starter suitable for 7.5 HP. (make- L&T or similar superior ) |
| 7 | 5.2)ML- 1.5 Starter (L&T make ML- 1.5 FASD) (make- L&T or similar superior) |
| 8 | 5.3) 3 Pole 32 Amp. Contactor(make- L&T or similar superior) |
| 9 | 5.4)63 Amp.TP&N Switch SFU Type (make- L&T or similar superior) |
| 10 | 5.5)Digital A. Meter, V. Meter of suitable range(make- AE or similar superior) |
| 11 | 5.6) Single phase preventer (make- AE or similar superior) |
| 12 | 6.0)Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel,making connections, Ics=100% Icu and Operational Voltage 690V etc. as required. |
| 13 | 6.1) 200 A, 25 KA, TP MCCB |
| 14 | 6.2)200 A, 36KA, FP MCCB |
| 15 | 7.0)Repairing & rewinding of following rating Induction Motor (3 phase, 440 volt) i/c dismentling and re-assembling after rewinding and replacement of ball bearing, testing,commissioning etc.complete as if reqd.7.1) 12.5 HP |
| 16 | 8.0) Repairing & rewinding of 3 HP monoblock clear/dewatering pump set (make- Kirloskar)i/cdismentling, re-assembling and testingetc.complete as if reqd. |
| 17 | 8.1)S/R of Ball bearing |
| 18 | 8.2)S/R Rewinding of motor |
| 19 | 8.3) S/R Connection Plate |
| 20 | 8.4) S/R of Gland Sleeve |
| 21 | 9.0) Repairing & rewinding of 5 HP monoblock dewatering pump set (make- Kirloskar)i/cdismentling ,re-assembling and testingetc.complete as if reqd. |
| 22 | 9.1) S/R of Ball bearing |
| 23 | 9.2)S/R Rewinding of motor |
| 24 | 9.3)S/R Connection Plate |
| 25 | 9.4) S/R of Gland Sleeve |
| 26 | 10.0)Repairing & rewinding of7.5 H.P. monoblock water pump set (make Kirloskar)i/c dismentaling,reassembly,cartage,testing etc. complete as if reqd. |
| 27 | 10.1)S/R of Ball bearing |
| 28 | 10.2)S/R Rewinding of Motor |
| 29 | 10.3)S/R Connection Plate |
| 30 | 10.4) S/R of gland sleeve |
| 31 | 11.0)Lifting of existing submersible/ dewatering pump seti/cGI pipe and dismantling of GI pipe dismantling & re-assembling, connection, testing etc. complete as reqd. |
| 32 | 12.0) Lowering of existing submersible/dewateringpump seti/c GI pipe dismantling & re-assembling, connection, testing etc. complete as reqd. |