| 1 | Providing Cement Concrete Pavement and Pipe Culvert at Muthapudaiyanpatti Vadakku kalam in Kannudaiyanpatti Panchayat Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc |
| 2 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. |
| 3 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. |
| 4 | Supplying and erecting , centering shuttering includung conveyance of all materials to worksite and all charges etc complete (Below GL) |
| 5 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. |
| 6 | Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 7 | Provision for Bitumen Pad charges |
| 8 | 90mm 6 KSC Pvc Pipe Including Cost and Conveynce of all Charges etc Complete |
| 9 | 90mm Dia PVC End Cap including Cost and Convynce of all Charges etc Cmplete |
| 10 | Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc |
| 11 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. |
| 12 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. |
| 13 | Supplying and erecting , centering shuttering includung conveyance of all materials to worksite and all charges etc complete (Below GL) |
| 14 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 15 | Supply and Laying of NP3 RCC 900mm Dia RCC Pipe Inlcuding cost and All labour Charges Etc Completed |
| 16 | Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc |
| 17 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. |
| 18 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. |
| 19 | Supplying and erecting , centering shuttering includung conveyance of all materials to worksite and all charges etc complete (Below GL) |
| 20 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 21 | Supply and Laying of NP3 RCC 900mm Dia RCC Pipe Inlcuding cost and All labour Charges Etc Completed |
| 22 | Provision for Name board Charges |
| 23 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |