| 1 | Dismentling RCC including Stacking of Dismentaled Material with in 60 M Distance including all Cost of Material, Labour & T&P etc. All as specified and as directed by Engineer-in-incharge |
| 2 | Dismentling R.B.Work including stacking of material within 60 Metre including all Cost of Material, Labour & T&P etc. All as specified and as directed by Engineer-in-incharge |
| 3 | Earthwork in excavation foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 4 | Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 5 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 6 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc. All as specified and as directed by Engineer-in-incharge |
| 7 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P etc. But excluding cost of steel reinforcement. All as specified and as directed by Engineer-in-incharge |
| 8 | Providing and laying C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 9 | Centering and Shuttering for C.C. Work including all Cost of Material, Labour and T&P etc. for completion of work. All as specified and as directed by Engineer-in-incharge |
| 10 | Centering and Shuttering for RCC Work including all Cost of Material, Labour and T&P etc. for completion of work. All as specified and as directed by Engineer-in-incharge |
| 11 | Supplying Laying of one layer of Tar felt I.S.I marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 12 | Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&P etc. for Completion of Work. All as specified and as directed by Engineer-in-incharge |
| 13 | Earthwork in Making & Removal Bundh and disposal including all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 14 | Earth Work in Filling for Strengthning of Bank, Ramp & approaches i/c Llift upto 1.50m & Lead upto 200 M with all Cost of Material, Labour and T&P etc. All as specified and as directed by Engineer-in-incharge |
| 15 | S/F 75 mm dia P V C Pipe for weep holes. All as specified and as directed by Engineer-in-incharge |
| 16 | Finishing of walls with water proofing cement paint of approved make supreme quality of required shade on uncoated wall surface over one coat white cement primer to give even shades after thoroughly brushing the sarface to remove all dirt and remains of loose powdered materials including Curing & Cost of all material. All as specified and as directed by Engineer-in-incharge |
| 17 | providing & fixing Sign board at VRB. i/c earth work, excavation, carriage, painting, letter writting and errect with c.c. i/c all Cost of Material, Labour and T&P etc. complection of the work. All as specified and as directed by Engineer-in-incharge Please Enable Macros to View BoQ information |