| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 with 15% boulders (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone. |
| 6 | Providing & making Gabion structure with Mechanically Woven DoubleTwisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter3.0mm, mechanically edged/selvedged with partitions at every 1m intervaland shall have minimum 10 numbers of openings per meter of meshperpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied@ 3% by weight of Gabion boxes, filled with boulders with leastdimension of 200 mm, as per drawing, all complete as per direction ofEngineer-in-charge.Providing and laying damp-proof Course/ coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 7 | Providing and laying damp-proof Course/ coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 8 | Back Filling behind R/wall Abutment Wing wall Retaining wall with available stone from earthwork completed as per drawing and techinical specification clause 1204.3.8 labour rate |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 10 | Carriage/consumption of material |
| 11 | Sand for an average distance of 125 km by MT |
| 12 | Aggregate 40 mm normal size for an average distance of 50 km by MT |
| 13 | Aggregate 20 mm normal size for an average distance of 50 km by MT |
| 14 | Stone for an average distance of 17 km by MT |