| 1 | PART-I |
| 2 | Excavation over areas, n.exc 1.5 m in depth and getting out in soft/loose soil complete as specified and directed. |
| 3 | Removing excavated soil to a distance exceeding 250m but n.exe 500 m and depositing where directed at a level n exc 1.5 m above the starting point complete as specified and directed.. |
| 4 | M&L for preparing the soil base for planting grass by levelling the base to required slopes and levels, supplying and spreading 02 parts of sand, 01 Part of bio fertiliser and one part of red loamy virgin soil for growth of grass to an average thickness of 200mm including mixing vermin compost etc., to improve the fertility of the soil in the required proportion and finally preparing the soil base suitable for planting carpet grass etc. including removal surplus debris outside MoD land, complete all as specified and as directed. |
| 5 | M & L for planting ever green grass of natural Korean/mexican feather carpet grass of approved pattern over the prepared base lawn/carpet area with good earth including watering, removing the weeds or any other vegetation, mixing the manure from time to time and pesticides as required for healthy growth as per standard gardening practice complete all as specified and directed. |
| 6 | M & L for planting of approved species of crotons (height of plant not less than 75 cm above ground level) of approved spacies at a spacing not exceeding 150 mm C/C including excavation of pit of min dimension 15cm x1 5cm x 20cm and removal of excavated earth to outside the MD land, preparation of ground upto 30cm deep and filling with good earth, cow dung, vermi composit and watering etc complete all as specified and directed. |
| 7 | All as per item no 05 but approved species of Hedge plants |
| 8 | All as per item no 05 but approved species of Sapling Nandivardhini |
| 9 | All as per item no 05 but approved species of Acalypha variegated |
| 10 | All as per item no 05 but approved species of Rednitequeen |
| 11 | All as per item no 05 but approved species of Ticama Orange |
| 12 | All as per item no 05 but approved species of Gulphamiya |
| 13 | All as per item no 05 but approved species of Songs of India |
| 14 | All as per item no 05 but approved species of Variegated leaves |
| 15 | All as per item no 05 but approved species of Duranto |
| 16 | All as per item no 05 but approved species of Boxwood |
| 17 | Supply and planting Flower plant (Plant height 2-3 ft) with pots of approved species of Lantama varities including necessary earth work and providing cow dung manure etc obtained from nurseries complete all as specified and directed. |
| 18 | All as per item no 16 but approved species of Plumeria Pudica |
| 19 | All as per item no 16 but approved species of Alamanda mini |
| 20 | All as per item no 16 but approved species of Ixoras white |
| 21 | All as per item no 16 but approved species of Singapore Ixora |
| 22 | All as per item no 16 but approved species ofButton rose |
| 23 | Supply and plantingOrnamental plants Cycas Revoluta Gymnosprem spices in pit of size 800mmx800mmx800mm height (Plant height not less than 8.00 ft) including necessary earth work andproviding cow dung manure, brick edging around the plant complete. |
| 24 | Supply and plantingMirchi Mari Gold Plant spices in pit of size 1000mm x 1000mm x 1000mm height (Plant height not less than 10.00 ft) including necessary earth work andproviding cow dung manure, brick edging around the plant complete. |
| 25 | Supply and planting Ornamental crotons palm likeRoyal Palmincluding necessary earth work in pit of size 800mmx800mmx800mm height (Plant height not less than 8.00 ft) andproviding cow dung manure, brick edging around the plant complete. |
| 26 | All as per item no 24 but approved species of Fishtail Palms |
| 27 | All as per item no 24 but approved species of Foxtail Palm |
| 28 | All as per item no 24 but approved species of Viechiemowcry |
| 29 | NOTE for Item no 5 to 27 :- (a)Tree/plants will be obtain from nursery of AP Govt or as approved by GE. Paymentshall be made only for the plants found alive. (b) All plants,Hedge, Grass provided under Sch A Part-Ishall be maintained by watering, taking out weeds, manuring the organic manure at regular intervals, using chemical fertilizers, spraying pesticides etc. for healty growth including trimming branches/grass to maintain proper shape etc. all as per standard gardening practice up to certified date of completion of entire workby employing 01 No Mali (unskilled) per day of 08 hrs duration except on Sundays and holidays. Water shall be supplied by MES for maintaining the grass and plants. Contractor shall be responsible for all necessary arrangements for collection and conveyance of water from MES water supply points/ source up to 5 km from the site. Necessary water tanker with tractor,water browser ,PVC pipe,sprinkler etc required for watering purpose is the responsibility of the contractor.Manure and pesticide required for maintenance of the plant under the above mentioned itemsup to certified date of completion of entire work shall be the resposibility of the contractor. Quoted Rates shall deemed to include for all these aspect. |
| 30 | Supply , laying and testing 15 mm bore High density poly ethylene pipes (HDPE) of pressure rating 6 kgf/cm2 fixed complete towalls, ceilings or in floors etc complete all as specified and directed |
| 31 | All as per item no 29 here-in-before but 20 mm bore |
| 32 | All as per item no 29 here-in-before but 50 mm bore |
| 33 | S & F 15 mm bore, PTMT pop up sprinkler,maxm throw radius 12 m, discharge rate 12.5 lit/min,adjustable 360 degree full circle or adjustable from 20 degree to 360 degree and suitable with maxm pressure 4.8 barsscrewed down, screwed for iron pipe or for brass ferrule complete all as specified and directed. |
| 34 | S & F15 mm bore, gun metal Gate valves, with iron wheel head, Class-I, Pressure Tested of 1.5 Mpa, screwed both ends for iron pipe complete all as specified and directed. |
| 35 | All as per item no 33here-in-before but 20 mm bore |
| 36 | All as per item no 33here-in-before but 50 mm bore |
| 37 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. |
| 38 | M & L for Plain cement concrete 1:3:6, type C-2 (using 40 mm graded stone aggregate) as in foundation, filling and mass concrete, etc complete all as specified and directed. |
| 39 | M&L for Pre-cast cement concrete block masonry with solidblocks made out of PCC 1:3:6 type C1 (using 20 mm graded stone aggregate) ,Grade \"C\" masonry with compressive strength of 5N/sqmm, exc. 10 cm in width and setting in cemet mortar 1:6 complete complete all as specified and directed. |
| 40 | M & L for rendering 10 mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:4 and finished the surfaces even and fair without using extra cement complete all as specified and directed. |
| 41 | M & L for factory made medium duty steel fibre reinforced concrete (SFRC) covers including frames of Grade M-20 and thickness not less than 75mm for manholes, drains etc complete all as specified and directed. |
| 42 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil commplete all as specified and directed. |
| 43 | Removing excavated materialexc.1.00 km but n exc. 1.50km and depositing where directed outside Md land complete all as specified and directed. |
| 44 | PART-II |
| 45 | Outsourcing services for day to day maintenance of all plants,Hedge, Grassprovided under Sch A Part-Iby watering, taking out weeds, manuring the organic manure at regular intervals, using chemical fertilizers, spraying pesticides etc. for healty growth including trimming branches/grass to maintain proper shape etc. all as per standard gardening practice for a period of two year from the certified date of completion of entire workby employing 01 No Mali (unskilled) per day of 08 hrs duration except on Sundays and holidays complete as specified and directed.Note :Water shall be supplied by MES free of cost for maintaining the grass and plants. Contractor shall be responsible for all necessary arrangements for collection and conveyance of water from MES water supply points/ source up to 5 km from the site. Necessary water tanker with tractor,water browser ,PVC pipe,sprinkler etc required for watering purpose is the responsibility of the contractor.Manure and pesticide required for maintenance of the plantfor two years shall be the resposibility of the contractor. Quoted Rates shall deemed to include for all these aspect. |