| 1 | Taking down and dismantling defective transformer 11/0.433 KV of capacity 63 KVA from foundation/ pole by usingcrane and transporting to workshop or factory (authrorised for such repair) for repair after disconnecting HV side HT cable or HT aluminium conductor and LV side LT cable , dismantling the same for repair & renewal of unserviceable parts and reassembling complete ,spray painting with two coats of synthetic enamelled grey paint after preparation of old surface writing MES No with white paint of suitable size letter and transporting to back from workshop to site, installation on plate form/pole, testing & commissioning to entire satisfaction of Engineer-in-Charge. |
| 2 | Taking down and dismantling defective transformer 11/0.433 KV of capacity 100 KVA to 250 KVA from foundation/ pole by usingcrane and transporting to workshop or factory (authrorised for such repair)for repair after disconnecting HV side HT cable or HT aluminium conductor and LV side LT cable , dismantling the same for repair & renewal of unserviceable parts and reassembling complete, spray painting with two coats of synthetic enamelled grey paint after preparation of old surface writing MES No with white paint of suitable size letter and transporting to back from workshop to site, installation on plate form/pole, testing & commissioning to entire satisfaction of Engineer-in-Charge. |
| 3 | Taking down and dismantling defective transformer 11/0.433 KV of capacity 315 KVA to 630 KVA from foundation/ pole by using crane and transporting to workshop or factory (authrorised for such repair)for repair after disconnecting HV side HT cable or HT aluminium conductor, LV side, LT cable dismantling the same for repair & renewal of unserviceable parts and reassembling complete, spray painting with two coats of synthetic enamelled grey paint after preparation of old surface writing MES NO with white paint of suitable size letter and transporting to back from workshop to site, installation on plate form/pole, testing & commissioning to entire satisfaction of Engineer-In-Charge.Note for ser item No 1 to 3 :- Spare parts i.e transformer oil, copper winding wire for rewinding will be measured and paid separately under relevant Items. |
| 4 | S&F in repairof synthetic rubberised gaskets 4mm thick for top cover and other joints for transformer capacity 63 KVA to 100 kva ,11/0.433 KV complete all as specified and directed by Engineer-in-Charge. |
| 5 | S&F in repairof synthetic rubberised gaskets 4mm thick for top cover and other joints for transformer capacity 160 KVA to 630 KVA ,11/0.433 KV complete all as specified and directed by Engineer-in-Charge. |
| 6 | M&L for taking out unserviceable core and limb and HV/LV winding of transformerand taking out burnt copper winding wire cleaning carefully an rewinding the same with new superior quality 99.99% pure copper enamelled wire as per existing gauge including insulating material for transformer 25 KVA to 630 KVA complete all as specified and directed by Engineer-in-Charge. |
| 7 | Dehydration of transformer oil (mounted on poles/platform etc) with the help of filtering and drying plant by mechanical machines of suitable capacity to achieve dielectric strength of 50 KV complete all as specified and directed by Engineer-in-Charge. Note : For any capacity of Transformer |
| 8 | Supply only transformer oil for topping up of transformers any capacity all as conforming to IS - 335 at different transformers & different locations complete all as specified and directed by Engineer-in-ChargeNote : The dielectric strength of the transformer oil must be 45 KV r.m.s (min).Make : Power oil / HP/ BP.Note : Test certificate in respect of the same to be submitted by the contractor duly signed by theEngineer-in-Charge. |
| 9 | S&F in repair of unserviceable HT brass stem with nuts, washers oftransformer 63 KVA to 630 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 10 | S&F in repair of unserviceable LT brass Stem with nuts, washers oftransformer 11/0.433 KV of capacity25KVA to 63 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 11 | S&F in repair of unserviceable LT brass Stem with nuts, washers oftransformer 11/0.433 KV of capacity100KVA to 250 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 12 | S&F in repair of unserviceable LT brass Stem with nuts, washers oftransformer 11/0.433 KV of capacity315KVA to 630 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 13 | S&F in repair of unserviceable breather assembly with new silica geloftransformer 11/0.433 KV of capacity25 KVA to 100 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 14 | S&F in repair of unserviceable breather assembly withsilica geloftransformer 11/0.433 KV of capacity160 KVA to 630 KVAcomplete all as specified and directed by Engineer-in-Charge |
| 15 | S&F in repair of porcelain transformerbushing 11 KV suitable for transformer 63 KVAto 100 KVA complete all as specified and directed by Engineer-in-Charge |
| 16 | S&F in repair of porcelain transformerbushing 11 KV suitable for transformer 160to 630 KVA complete all as specified and directed by Engineer-in-Charge |
| 17 | S&F in repair of porcelain transformerbushing 433 volts suitable for transformer up to 100 KVA complete all as specified and directed by Engineer-in-Charge |
| 18 | S&F in repair of porcelain transformerbushing 433 volts suitable for transformer 160 KVA upto 630 KVA complete all as specified and directed by Engineer-in-Charge |
| 19 | S&F in repair tap changer suitable for 11/440 KV transformerof capacity 63 to 630 KVA complete all as specified and directed by Engineer-in-Charge. |
| 20 | S&Fin repair dimmer suitable for voltage stablizer 50 kva complete all as specified and directed by Engineer-in-Charge. Make :- Digitec |
| 21 | S&Fin repair dimmer suitable for voltage stablizer 75 to 100 KVA complete all as specified and directed by Engineer-in-Charge. |
| 22 | S&Fin repair servo motor 10 Kg / Sqcm suitable for voltage stablizer 50/75 KVA (3x25) complete all as specified and directed by Engineer-in-Charge |
| 23 | S&F in repair PCB, including carben bush, limit swith, push button etc suitable for voltage stablizer 50/75 KVA (3x25) complete all as specified and directed by Engineer-in-Charge |
| 24 | Supply, Jointing and testing indoor type cable termination heat shrinkable joint kit 11 KV Unearthed grade suitable for size95 Sqmm 3 core 11 KV under ground XLPE cable complete and including taking down old unserviceable complete all as specified and directed by Engineer-in-Charge. |
| 25 | All as per item No. 24.00 here-in-before above but 120 Sqmm to 185 Sqmm 3 core |
| 26 | Supply, Jointing and testing outdoor type cable termination heat shrinkable joint kit 11 KV Unearthed grade suitable for size 95 Sqmm 3 core 11 KV under ground XLPE cable completeand including taking down old unserviceable complete all as specified and directed by Engineer-in-Charge |
| 27 | All as per item No. 26.00 here-in-before above but 120 Sqmm to 185 Sqmm 3 core. |
| 28 | Supply jointing and testing straight through heat shrinkablejoint kit 11 KV unearthed grade suitable for size95 Sqmm 3 core 11 KV under ground XLPE cable complete and including taking down old unserviceable complete all as specified and directed by Engineer-in-Charge |
| 29 | All as per item No. 28.00here-in-before above but 120 Sqmm to 185 Sqmm 3 core. |
| 30 | Re-stringing and re-connection of ACSR of any size duly binded with insulators, jumpers etc.(fixed on9/11mtr poles) complete all as specified and directed by Engineer-in-ChargeNote :- (i)The above work includes cleaning pruning of tree branches falling around the conductors(ii)One length shall be measured for complete span of 3/4/5/6 conductors & GI wire. |
| 31 | M&L for switch air break gang operated triple pole mechanically operated, mounted on HT insulators (12 Insulators Vertical type operated) andMS galvanized steel frame with operating mechanism worked from ground level including operating rod for current rating up to 200 Amps 11000 volts complete with locking arrangement MS clamps, bolts and nuts and washers etcalso including drop outexpulsion type of fuses with fuse barrels of required capacity to suit load at site including two coats of aluminum paint over a coat of red oxide primer on MS work and including taking down old unserviceable switch air break gang operated complete all as specified and directed by Engineer-in-Charge |
| 32 | M&L for switch air break gang operated triple pole mechanically operated, mounted on HT insulators (09 Insulators Vertical type operated) andMS galvanized steel frame with operating mechanism worked from ground level including operating rod for current rating up to 200 Amps 11000 volts complete with locking arrangement MS clamps, bolts and nuts and washers etcalso including drop outexpulsion type of fuses with fuse barrels of required capacity to suit load at site including two coats of aluminum paint over a coat of red oxide primer on MS work and including taking down old unserviceable switch air break gang operated complete all as specified and directed by Engineer-in-Charge. |
| 33 | M&L for switch air break gang operated triple pole mechanically operated, mounted on HT insulators (09 Insulators Horizental type operated) andMS galvanized steel frame with operating mechanism worked from ground level including operating rod for current rating up to 200 Amps 11000 volts complete with locking arrangement MS clamps, bolts and nuts and washers etcalso including drop outexpulsion type of fuses with fuse barrels of required capacity to suit load at site including two coats of aluminum paint over a coat of red oxide primer on MS work and including taking down old unserviceable switch air break gang operated complete all as specified and directed by Engineer-in-Charge.Note :- stack for fixing with poles shall be measure and paid separately |
| 34 | S&F in repair pin type, porcelain, vitreous,white, brown or green insulator including one galvanised mild steel spindle, two galvanised iron washers and one galvanised iron nut, 150mm height, 150mm dia for 11000 volts grade complete all as specified and directed by Engineer-in-Charge |
| 35 | S&F in repair disc type insulator, porcelain, vitreous with hardware,145mm high and 255mm dia ball and socket type, white, brown or green, single disc assembly for 11000 volts grade complete all as specified and directed by Engineer-in-Charge |
| 36 | Taking down old HT under ground cable any size and description complete all as specified and directed by Engineer-in-Charge |
| 37 | Supply, laying & testing XLPE insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) with stranded aluminum conductor, 11000 volts grade, of size 95 sqmm 3 core including taking down unserviceable cable complete all as specified and directed by Engineer-in-Charge. |
| 38 | Supply, laying & testing XLPE insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) with stranded aluminum conductor, 11000 volts grade, of size 120 sqmm 3 core including taking down unserviceable cable complete all as specified and directed by Engineer-in-Charge |
| 39 | Supply, laying & testing XLPE insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) with stranded aluminum conductor, 11000 volts grade, of size 185 sqmm 3 core including taking down unserviceable cable complete all as specified and directed by Engineer-in-Charge |
| 40 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for foundation, laying of cable/pipe etc not exceeding 10 sqm on plan and getting out in Soft/disintegrated rock complete all as specified and directed by Engineer-in-Charge |
| 41 | Returning, filling in, including, spreading, levelling, watering and well ramming excavated Soft/Disintegrated rock in layers complete all as specified and directed by Engineer-in-Charge |
| 42 | Removing excavated Soft/Disintegrated rock to distance not exceeding 50 m and depositingwhere directed at a level not exceeding 1.5 mabove the starting point complete all as specified and directed by Engineer-in-Charge |
| 43 | M&L for sand cushioning to underground PVC/XLPE cable with tibba sand and punning to provide required cover complete all as specified and directed by Engineer-in-ChargeNote :- For the purpose of payment only punned thickness will be measured. |
| 44 | Supply and laying Jodhpur stone quarry faced stone slab cover 25 to 30 cm in width, 50 to 60 cm long and 40 to 50 mm thick, laid dry and abutting each other with gap between adjacent slab not exceeding 10 mm over under ground cables for protection complete all as specified and directed by Engineer-in-Charge. |
| 45 | M&L for cutting the existing bituminous road / hard standing to size not exceeding 45cm wide and depth not less than 45cm for passing of UG cable through GI pipe and making good the disturbed surface filled with excavated material and top 200mm depth with plain cement concrete 1:3:6, type C1 using 20mm graded aggregate complete all as specified and directed by Engineer-in-Charge. |
| 46 | S&Fin repair GI pipe light grade of dia 80 mm laying in road and along with poles for cable protection complete all as specified and directed by Engineer-in-Charge. |
| 47 | M&L for painting tranformer complete by removing existing oil paint by scrapping and applying two coats of approved colour synthetic enamel paint (1st grade quality) over a coat of primer after preparation of surfaces including writing SM / MES numbers and date of oil tested etc. all as directed by Engr-In-Charge and applying one coat of cement base paint on transformer plinthfor the following capacity complete all as specified and directed by Engineer-in-Charge. :- |
| 48 | Transformer of capacity 63KVA, 11 KV/0.433 KV. |
| 49 | Transformer of capacity 100 KVA to 200 KVA, 11 KV/0.433 KV. |
| 50 | Transformer of capacity 250 to 630 KVA, 11 KV/0.433 KV. |
| 51 | Servicing the 11 KV GOD by cleaning the contact, disc/ pin insulator with CTC and applying the petroleum jelly at the contact point/ down rod links for smooth operation including replacing the rusted/ corroded bolts & nuts and defective insulator of GOD as required complete all as specified and directed by Engineer-in-Charge.Note :- Insulator shall be measured and paid under relevant items of this schedule. |
| 52 | S&F Male/ Moving contact (set of 3 Nos) complete all as specified and directed by Engineer-in-Charge. |
| 53 | S&F Female/ Fixed contact (set of 3 Nos) complete all as specified and directed by Engineer-in-Charge. |
| 54 | Dismantling, taking down and removing the old existing unserviceable non-functional/broken hinges of any description and in any postiion of existing feeder piller boxes/panel boards/feeder pillar boxes etc and supplying and fixing new cold rolled 100mm long medium weight mild steel but hines in position with necessary spot welding etc including external part of full panelshall be painted with two coat of synthetic enamled paint over a coat of red oxide primer complete all as specified and directed by Engineer-in-Charge.Note : All Hinges fixed in one panel will be considred under one job only. |
| 55 | Cuttting / trimming of tree branches in close proximity to over head lines to maintain a clearance of 1.5 meters from the over head line to nearby trees complete and removing/ throughing the cutting branches to distance not exceeding 50 m or as complete all as specified and directed by Engineer-in-Charge. Note :- Only effected area of over head conductor shall be measured as per running meter. |
| 56 | S&F feeder Piller Box outdoor type single door front openable in two half not less than 1.20mx1.20mx1.00m made out of 3.15 mm thick CRCA sheet podwer coatedpaint in heatprocess of sheet, supported on angle iron frame 50x50x6mm having legs 1.2,mtr long groutedin PCC upto 60cm, aluminium bus bar 03 Nos rated capacity 200A (HT) duly insulated 11000 Volt grade for phases supported on HT porcelain insulator , PCC foundation 1:2:4 (using 20mm graded stone aggregate) complete all as specified and directed by Engineer-in-Charge. |
| 57 | M&L for bore earthing not less than 250 mm dia 16 feet deep filled with black soil up to 7 feet from bottom complete with galvanized iron pipe40 mm bore medium grade 3 meter long tapers at bottom & provided 12 mm holes (staggered) at 75 mm centre to centre up to 2.5 meter of length from bottom , burried directly in ground filled with 45 cm alternate layer of chemical magnisium sulphate & salt up to ground level connected to galvanized iron strip 32 x 6 mm as earthing lead by means of bolt and nut, check nuts and washer of galvanized iron or steel including brazing workand 40mm dia light grade pipe for earth lead protection including all necessary earth work, excavation, earth chamber with PCC 1:3:6, type C1 and RCC chamber cover of PCC 1:2:4 (using 20mm graded stone aggregate) with handle and 20mm dia GI watering pipe with funnel and wire mesh etc and testing on complete all as specified and directed by Engineer-in-Charge. |
| 58 | Shifting of Existing Transformer of capacity 63 KVA to 315 KVAfrom one sub station to another sub station under E/M-II sub division by using crane after disconnection of LT & HT side connections complete all as specified and directed by Engineer-in-Charge. |
| 59 | S&F cable route indicators made out of hammer dressed stone slab of size30 cm (L) x x7.5 cm (B) x 75cm (H) and applying two coats ofwhite synthetic enamel paintand marking of voltage and size of cable in RED COLOUR including necessary eatth work, PCC required to fix complete all as specified and directed by Engineer-in-Charge.Note : Earth work, PCC deemed to be included in quoted rate. |
| 60 | M&L for finding cable fault with electronic fault detector in HT UG cable of any sizecomplete including earthwork and jointing cable complete all as specified and directed by Engineer-in-Charge. |
| 61 | Removing grass and bushes including its roots growing at Substation yard/around the platefarm of transformer/ two poe/4 pole structure and keep the sub station yard/ plate farm areaneat and clean cable complete all as specified and directed by Engineer-in-Charge. |