Name of Work:- Tuin Xksrecq)Uxj Esa Forrh; Okz 2025&26 Nqtkuk Lknqyykiqj [Ksmh Nknjh Ckbzikl ¼Nqtkuk Vkcknh½ Vu; Ftyk Ekxz Ij Foksk Ejeer Dk Dk;Za
Sl. No.
Item Description
1
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. (With carted Earth)
2
Providing, laying, spreading and compacting stone aggregates of 22.4 to 53mm. (Grading-3) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. As per technical Specification clause 404. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
3
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.(Without Dowel Bar) Technical Specification Clause 1501. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.