Name of Work:- Eks0 Dchjuxj Esas Okmz La0&16 Esa Efltn Ls Iwoz Fufezr Iqfy;K Rd Vkj0lh0lh0 Ukys Dk Fuekz.Ka
Sl. No.
Item Description
1
Dismantling cement concrete or brick or granolithic floors/interlocking including base concrete and including stacking of dismatled materials as directed by the Engineer-in- charge with in a distance of 60 meter (200 feet). S.I. No. 697. (Interlocking Road)
2
Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the Space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal or surplus earth as directed by the engineer-in charge upto a distance of 30 M from the foundation trenches
3
Cement Concrete with 4cm gauge approved stone coarse sand and cement in proportion of 8:4:1 including supply of all material labour & T&P etc. required for proper completion of the work.
4
R.C.C raft foundation work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost.
5
R.C.C. work in colum Proporation of 1:11/2:3 with cement and 20mm gauge size stone grit all material, labour T&P etc. requried for proper compaction of work, Binding wire of Supplied by the contractor free of cost.
6
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.50:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost. as per S.I. No. 284 of Ch. 5.
7
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications complete as per MORTH IInd Revision 2019 Specification 1600.
8
Deduct cost of old rain for cement 10.50X3000
9
Add CGST+SGST @18% of Estimate cost Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.