| 1 | Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete |
| 2 | Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete |
| 3 | Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum. |
| 4 | Earth work in excavation of foundation including all lead, lift and manual compaction. |
| 5 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. |
| 6 | Centering and shuttering for R.C.C. work including placing in position. |
| 7 | Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge. |
| 8 | Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. |
| 9 | C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. |
| 11 | Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. long with all cost of material, T&P and labour complete. |
| 12 | S/Fixing M.S. Steel wheel guard size of 100x150x80 mm with cost of material including T&P labour etc complete. |
| 13 | Painting letters up to 8cm with approved brand Enamel paint of super quality i/c cost of material T&P Labour etc. As per directed by Engineer in charge. |
| 14 | Supply & Fixing Sine Board of size (0.91x1.22cm) of M.S. Steel including painting & writing letters with approved synthetic enemel paint i/c cost of material T&P labour etc as per directed by engineer-in-charge. |
| 15 | Earth work in Back filling including lead upto 200m and lift 1.50m also I/c lavelling ,ramming ,dressing , labour T &P etc complete . |
| 16 | Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete. |
| 17 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. |
| 18 | Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition. |
| 19 | Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect |
| 20 | Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work. |
| 21 | Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work. |
| 22 | Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |