Tender For Earth Work In Excavation Of Foundation Trenches Or Drains, In All Sorts Of Soil (Including Mixed Soil But Excluding Laterite Or Sandstone) Including Removing, Spreading Or Stacking The Spoils Within A Lead Of 75 M. As Directed. The Item In
Tender Overview
Project Description
Tender for Earth Work In Excavation Of Foundation Trenches Or Drains, In All Sorts Of Soil (Including Mixed Soil But Excluding Laterite Or Sandstone) Including Removing, Spreading Or Stacking The Spoils Within A Lead Of 75 M. As Directed. The Item Includes Necessary Trimming The Sides Of Trenches, Levelling, Dressing And Ramming The Bottom, Bailing Out Water As Required Complete. (A) Depth Of Excavation Not Exceeding 1,500 Mm. , Earth Work In Filling In Foundation Trenches Or Plinth With Good Earth, In Layers Not Exceeding 150 Mm. Including Watering And Ramming Etc. Layer By Layer Complete. (Payment To Be Made On The Basis Of Measurement Of Finished Quantity Of Work) (A) With Earth Obtained From Excavation Of Foundation. , Supplying And Laying Polythene Sheet (150Gm / Sq.M.) Overdamp Proof Course Or Below Flooring Or Roof Terracing Or In Foundation Or In Foundation Trenches , (A) Filling In Foundation Or Plinth By Silver Sand In Layers Not Exceeding 150 Mm As Directed And Consolidating The Same By Thorough Saturation With Water, Ramming Complete Including The Cost Of Supply Of Sand. (Payment To Be Made On Measurement Of Finished Quantity) , Single Brick Flat Soling Of Picked Jhama Bricks Including Ramming And Dressing Bed To Proper Level And Filling Joints With Local Sand. , (I) Cement Concrete With Graded Stone Ballast (30 Mm Size Excluding Shuttering) In Ground Floor (A) [Pakur Variety] (A) 1:2:4 Proportion , Hire And Labour Charges For Shuttering With Centreing And Necessary Staging Upto 4 M. Using Approved Stout Props And Thick Hard Wood Planks Of Approved Thickness With Required Bracing For Concrete Slabs, Beams, Columns, Lintels Curved Or Straight Including Fitting, Fixing And Striking Out After Completion Of Works. (Upto Roof Of Ground Floor). (F) 25 Mm. To 30 Mm. Thick Wooden Shuttering Without Stagging , Brick Work With 1St Class Bricks In Cement Mortar (1:6) (A) In Foundation And Plinth , Plaster (To Wall, Floor, Ceiling Etc.) With Sand And Cement Mortar I
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender