| 1 | Earth work in foundation excavation up to 1.5 m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50 m |
| 2 | PCC 1:4:8 in foundation |
| 3 | Stone work in foundation and plinth using CM 1:6 |
| 4 | Brick work in super structure using in CM 1:6 |
| 5 | 20 mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 6 | Pointing (teep) on stone messonary work including curing and racking of joints in CM 1:3 |
| 7 | P & A white cement based putty over plastered surface to prepare the surface even and smooth complete |
| 8 | Finishing wall with acrylic smooth exterior paint of required shade including all scafoldding. (two or more coat including base coat of water proofing cement paint) (pwd 2018) |
| 9 | S & F iron gate and grill |
| 10 | Enamal paint, painting, contigendcy and others on door & relling |
| 11 | Earth work in filling in with lead of 50 m for disposal of sand and lift up to 1.5 m |
| 12 | carrige of sand including loading and unloading from quary with lead of 2 km |
| 13 | Providing and laying CC 1:4:8 as base of block road |
| 14 | Providing and fixing 80 mm thick m-30 cement cone block as per BS 6717:2001 (coloured block) |
| 15 | Meterial testing & Yojna board and otherss |
| 16 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 17 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 18 | Brick work in super structure using bricks of class designation-75 in CM 1:6 |
| 19 | S & F Stone Lintels |
| 20 | P & L First class patti roofing as per specifiation |
| 21 | P & L Roofing brick bats |
| 22 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 23 | Providing and applying white cement based putty |
| 24 | Wall painting with plastic emulsion paint of required shade including all scaffolding. New work (two or more coat including base coat of water proofing cement paint)- PWD BSR-2022 |
| 25 | S & F Iron door |
| 26 | Enamel painting on door |
| 27 | Cement concrete in floor with stone ballast size 40mm including curing and compaction etc in 1:6:12 mix |
| 28 | S & F Glaze tiles on walls |
| 29 | Add electric+water+sanitory fitting etc |
| 30 | Add for contigency, Yojna board and others |
| 31 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 32 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 33 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 34 | S & F Stone Lintels |
| 35 | P & L First class stone slab roof in CM 1:4 |
| 36 | P & L Bhanwaria on roof CM 1:4 |
| 37 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 38 | Providing and fixing hand pump with complete fitting |
| 39 | Providing and fixing plastic cover (dhakkan) |
| 40 | Providing and fixing yojna/ work name plate + Painting slogan and waters fitting Please Enable Macros to View BoQ information |