|
| 1 | Demolition of brick work or stone /boulder masonry built in cment mortar or cement lime mortar including removing demolished materials complete all as specified and directed upto 12 storied bldg |
| 2 | M&L brick work with sub class \"B\" bricks straight or curved on plan exc 6 m mean radius built in CM (1:6) complete all as specified and directed upto 12 storied bldg |
| 3 | M&L brick work with sub class \"B\" bricks, straight or curved on plan to any radius in half brick thick walls built in CM (1:4) complete all as specified and directed upto 12 storied bldg |
| 4 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbingdown with water etc. complete all as specified and directed upto 12 storied bldg. |
| 5 | Materials and labourfor 15 mm thick renderingon fair faces of brick work in cement mortar (1:6) andfinished the surfaceseven and smooth without using extra cement complete all as specified and as directed upto 12 storied bldg |
| 6 | Material and labour for rendering 15 mm thick on other than fair faces of brick work in cement morter (1:4) finished even and smooth (without using extra cement) complete all as specified and directed upto 12 storied bldg |
| 7 | Material and labour for5mm thick renderingin cement mortar (1:3) on concrete surface as in ceiling andfinished the surface even and smooth without using extra cement complete all as specified and as directed upto 12 storied bldg |
| 8 | Materials and labour forPreparation of new plastered surfaces of ceiling and applying three coats of white wash on ceiling surface etc complete all as specified and as directed upto 12 storied bldg |
| 9 | Material & labour for preparation of new plastered surfaces of walland applying two coats of oil bound distember over a coat ofprimer over 2 mm thick wall care putty (in two layers) upto 12 storey bldg complete all as specified and directed. |
| 10 | Material and labour for new plastered surfacesof wall and preparation of surfaces andone coat alkali resistant primer and 2mm thick cement base wall care putty , sanding the surfaces andMaterial & Labour for applying Two or more coatsof 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade Company Depot Tinted) with silicon additives1.43 litre/ 10 sqm over upto 12 storied building complete all as specified and as directed. |
| 11 | S & F framed work such as grills, gratings, etc. with ends of bars shouldered and /or riveted or forged into spikes, framed guard bars barred iron doors; ladders framed alusters; wald ways; railings; framework of water tanks and similar work confrming to Fe-290 Gde -E 165 complete all as specified and directed upto 12 storied bldg |
| 12 | Taking down steel window/ventilator including guard bar of any description and in any position and removing from site complete all as specified and directed upto 12 storied bldg. |
| 13 | S&F Powder coated aluminiumsliding windows for three track with rubber gasket, stopperpowder coated aluminium standard beads/glazing clips ,locking arrangement etc and aluminium frame of size (80mmX25mmX1.55mm) andshutter of section (20mm X20mm X1.55mm) incl ( two shutter of 4.8mm thick glass and one shutter of wiremesh 0.36 mm dia of wire and average width of aperture 1.40 mm) includingwith necessary all fittings complete all as per manufacturer\"s instructions and including fixing of double layer steel scaffolding as and when neededincluding sealing of joints with silicon gel or any other sealent complete all as specified and as directed upto 12 storied bldg |
| 14 | Material and labour for preparation of new steel surfaces of any description over 10cm width or girth and applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified and as directed upto 12 storied bldg |
| 15 | Supply and Fixin repair for curtain rods dicorative aluminium alloy with ABS plastic including knobs, brackets and all necessary arrangments to fixed with wall and taking down of old wooden pelmet if present at site complete all as specified and as directed upto 12 storied bldg |
| 16 | Dismantling Galvalume Iron corrugated sheet upto 12 storied bldgof any guage, thickness complete all as specified and directed |
| 17 | Supply & Fixingfor Pre painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of an colour having tensile strength of 550 Mpa as in roof covering/chadding to wall, fixed with self tapping screws complete all as specified and directed upto 12 storied bldg |
| 18 | Dismantling wrought iron or mild steel work of any description not otherwise provided for upto 12 storied bldg complete all as specified and directed. |
| 19 | Material and labour for Joist, channel, angle, or tee sections, fixed independently, without connecting plates, etc, (cut to ordinary lengths i.e, within 20 mm of the length indicated) Fe 410-W (Gde E-250) quality-A complete all as specified and as directed upto 12 storied bldgNOTE: Works against all items contained in the BOQ have to be carried out upto and including 12th floor of the Bldgs and quoted rates shall be deemed to be included to this factor |