|
| 1 | H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-13 mtr. Long = 482.3 kg |
| 2 | 140 Kg.,8.0 Mtrs. long PCC pole |
| 3 | AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) |
| 4 | M S Angle 65X65X6 mm |
| 5 | G.I. Wire 3.15 mm. (10 SWG) |
| 6 | 11 KV Pin Insulator Polymer Composit (5 KN) |
| 7 | 11 KV Strain hardware (T&C type) fittings |
| 8 | 11 KV(45KN) Composite Polymer Disc Insulators |
| 9 | M S Channel 100X50x6 mm |
| 10 | Danger Boards Enamelled 11 KV |
| 11 | Aluminium paint |
| 12 | Red oxide paint |
| 13 | Aluminium Binding wire and tape |
| 14 | M S FLAT 65X8 mm |
| 15 | M.S.Angle 50x50x6 mm |
| 16 | M.S.Flat 50x6 mm |
| 17 | M.S.Nuts with Bolts |
| 18 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm |
| 19 | Back filling of poles with boulders. |
| 20 | Carpet guarding |
| 21 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 22 | Concreting of stay (20 mm / 25 mm) @ 0.3 cmt. per stay |
| 23 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 24 | STAY GI WIRE 7/4.00 MM.(7/8 SWG) |
| 25 | Stay set 20 mm. complete without Stay wire (Painted) |
| 26 | Stay set complete without Stay wire 16 mm. (Painted) |
| 27 | Concreting of structures & foundation (1:3:6). |
| 28 | Stay Insulators 90X65mm |
| 29 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire |
| 30 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole |
| 31 | Jointing Sleeves suitable for Dog (100Sq.mm.Al. Eq. ) AAAC conductor |
| 32 | Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor |
| 33 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 34 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 35 | Labour Charges & all Fabrication Charges (STC Sub Division will provide the raw material like M.S. angle, M.S. Channel, M.S. flat, etc. to the contractor and the contractor will fabricate the items like V-cross arm, Top clamp, D.C. Channel, clamp, etc. as per site condition. Those fabrication charges are included in the Labour charges.) no extra amount will be paid. |
| 36 | Transportation Charges for All Equipments & Materials from area store to site & Site to Area store Bhopal |
| 37 | GST on Transportation @5% |
| 38 | GST on (Contractor side Material + Labour) @18% Please Enable Macros to View BoQ information |