|
| 1 | Handling and Transportation of filled Barrels 200/210 Ltrs Capacity from west side Jetty near Amin Kachery /Sea shore to Oil storage yard near Power house including stacking of barrels in vertical position in correct level with proper counting and correcting supplied quantity 100 Mtr area within during unloading new consignment and compieted 48 Hrs or vice versa |
| 2 | Transportation of Empty Barrels 200/210Ltrs Capacity with bungs from Oil storage yard Power house to West side Jetty or Sea shore Near Aminkachery avalible within 100 Mtrs as inculuding proper stacking and counting for loading Barrel and vice versa |
| 3 | Handling and Transportation of filled Barrels 200/210 Ltrs Capacity from Eastern side Jetty near Palliyarchal /Sea shore to Oil storage yard near Power house including stacking of barrels in vertical position in correct level with proper counting and correcting supplied quantity 100 Mtr area within during unloading new consignment and compieted 48 Hrs or vice versa |
| 4 | Transportation of Empty Barrels 200/210Ltrs Capacity with bungs from Oil storage yard Power house to Eastern side Jetty near Palliyarchal avalible within 100 Mtrs as inculuding proper stacking and counting for loading Barrel and vice versa |
| 5 | Removal Bung/Seals Opening and closing of Bungs of each Barrels and making all arrangenets or measurement of HSD Oil Barrels after Transportation of Filled Barrels |
| 6 | Filling, Replenishing of HSD Oil filled Barrels to Oil storage tank from entire stock of HSD Oil barrels and proper stacking of Empty Barrels in the free avalible place at Oil storage yard/Power house within 100Mtrs. |
| 7 | Restacking of Empty Barrels 200/210Ltrs Capacity sea Shore,Power Housefree area within 100Mtrs or Vice versa as and when required by the department identified and corrected only. |
| 8 | Restacking of HSD Oil filled Barrels 200/210Ltrs Capacity sea Shore,Power Housefree area within 100Mtrs or Vice versa as and when required by the department identified and corrected only. |
| 9 | Changing Oil from leaking/damaged Oil filled Barrels to good Barrel of 200/210Ltrs Capacity at West side Jetty,Palliyarchal /Sea shore and Power house another required by the department. |
| 10 | Cleaning of 15KLCapacity tank at Power house yard as and when required normally once in Year. |
| 11 | Cleaning and removal of sediments and mud inside and HSD Oil filling pit as and when required. |
| 12 | Cleaning of Cement plat form of Oil Storage yard and Power house premises 100Mtr including removal, Transportation and disposal of dirty sediments,mud, wastes etc as and when requored by the department |
| 13 | Handling and over stacking 1 layer over HSD Filled barrels 200/210Ltrs Capacity on the entie stack of Hsd Oil filled Barrels at Power house/Sea shore etc |
| 14 | Scraping,Cleaing and Painting of Outer of 15KL Capacity storage tank with one coat red oxide,metal primer and Two coat Aluminum Paint normallyOnce in Year.(Full cost) |
| 15 | 24 Hrs Watch and ward duty for oil filled barrels / Empty Barrels at Warf / Jetty / Sea Shore. |
| 16 | Running and Maintance of Forklift |