| 1 | Item Description |
| 2 | Providing and fixing powder coated aluminium partitions with frames of 101.6x44.45mm as per direction of the Engineer-in-charge using 16 gauge sections with plain glass,powder coatingof approved colour/shade/design, includingtransportation, scaffolding and handling,labour,materials, etc. complete |
| 3 | Providing and fixing powder coated aluminium sliding windows withapproved manufacturer to suit three track sliding using best quality standard extruded colour anodised aluminium sections made out of16 SWG sectionof Jindal or any other approved equivalent make without horizontal glazing bars, glazed with 5mm thick sheet glass (Modi or equivalent) fixing to the RCC column / masonry including necessary bolting devices, handles,approvedlocking arrangement, concealed lock,fixing clips, metal putty, PVC / rubber beading etc.All labour and materials etc complete. |
| 4 | Providing and fixing powder coated aluminium shutters with frames as per direction of the Engineer-in-charge for single or double leaf door shutters using 16 gauge sections with Plain glass,particle board,powder coating with pure polyester powder of shade of approvedcolour on the aluminium section, handles, lock, tower bolts, latch, door stoper etc.including all taxes, transportation, scaffolding and handling,labour,materials, etc. complete |
| 5 | P/F Hydraulic Door Closer all complete |
| 6 | Providing and laying Privacy Filming/Sun control film1 mm thick over glass all labour and materials etc complete |
| 7 | Dismantling Railing and tile paltformand taking away the dismantled materials outside GSL as instructed by OIC |
| 8 | Constructing masonry in superstructure at all levels using precast cement concrete solid blocks having a crushing strength of not less than 70kg/cm2(28days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners,curing etc.all labour and materials etc. complete. |
| 9 | 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement: 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge ,curing,scaffoldings, all labour and materials etc. complete. |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.with approved colour, shade aall labour & Scaffolding and materials complete,etc. |
| 11 | Applying primer coat for wheather shield/ ultima cement primer of approved brand and manufacture on wall surface: water thinnable cement primerwith approved colour, shade all labour & Scaffolding and materials complete,etc. |
| 12 | Providing and applying external paintof Dulux/ultima/Asian/berger/Nerolac or any other approved equivalent make for external surfaces, overhead water tanks, etc. including preparing the surface, cleaning, coir brushing, scaffolding, all labour and materials complete in Two coat . |
| 13 | Wall painting with plastic emulsion paint of Dulux/ultima/Asian/berger/Nerolac approved brand and manufacture to give an even shade in double coat with approved colour, shade all labour & Scaffolding and all labour and materials complete |
| 14 | Applying paint using two coat enamel paint over a coat of Red oxide primer (paint and primer will be supplied by GSL free of cost at GSL store) including preparing surfaces etc with approved colour, shade all labour & Scaffolding and materials complete,etc. |