Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Material and labour for surface preparation of existing concrete components including grinding/rubbing carefully by grinder without damaging the existing concrete including cleaning the surfaces by blower , removal of external plaster wherever exists. Cost inclusive of transportation, labour conveying debris away from the Defence land, tools and tacklers, lead and liftand clean water thoroughly complete all as specified and directed by Engr-in-Charge.Note- 1. Work is required to be carrried out to a height upto of 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 2 | Demolition of reinforced cement concrete in roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work (upto 7.5m height) including necessary scaffolding arrangement (reinforcement cut as required to facilitate demolition) and removing concrete debris and depositing outside MD land all as specified and as directed by Engineer-in-Charge. |
| 3 | Demolition of reinforced cement concrete in roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work (from 7.5m to 15m height) including necessary scaffolding arrangement (reinforcement cut as required to facilitate demolition) and removing concrete debris and depositing outside MD land all as specified and as directed by Engineer-in-Charge. |
| 4 | Supply and fix TMT bars, 10mm dia and over cut to length bent to shape required including cranking, bending spirally for hooping for columns hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed by Engineer-in-Charge.Note: 1. Cutting of rusted reinforcement & welding shall be inclusive in this item of work2. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.3. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 5 | Supply and fix TMTbars, 8 to 10mm diain stirrups, spacers and binder, cut to length bent to shape required includingcranking, bending spirally for hooping for columns hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed by Engineer-in-Charge.Note: 1. Cutting of rusted reinforcement & welding shall be inclusive in this item of work2. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.3. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 6 | Supply & fix MS/TS dowel pins/staple/shear pins including drilling holes in concrete and providing labour but excluding the materials for grouting the pins etc complete all as specified and as directed by Engineer-in-Charge. |
| 7 | Material & labour for repairing of damaged concrete portion by using superfluid dual shrinkage compensated structural grade M-40 micro concrete of at all levels with all leads and lift as directed including mixing, laying, levelling, finishing and curing complete all as specified and directed by Engineer-in-Charge.Make: Fosroc / SIKA / BASF / Krishna Conchem or equivalent approved . |
| 8 | Material and labour for reinforced cement concrete1:2:4, type B1 ( Nominal mix) using 20mm graded stone aggregates as infoundation, footing, bases of columns, raft and raft beams, plinth beams, mass concreteand similar work etc complete all as specified and as directed by Engineer-in-Charge. Note: Formwork and reinforcement shall be measured and paid separately |
| 9 | Material and labour for formwork using steel shutters or 12mm marine ply to have the smooth finish to pour the micro concrete/ concrete including de-shuttering etc complete all as specified and as directed by Engineer-in-Charge.Note: 1. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 10 | Material and labour for providing and applying rust cleaner of approved make over prepared reinforcement, including removing concrete all around reinforcement including from behind the reinforcing bars by manual methods such as hammering the rebar, using wire brushes, chiseling, etc. and applying rust removing solution of approved make with cotton waste swab to reinforcements etc complete as directed by Engineer-In-Charge.Make- Dr FIXIT/ FOSROC/ Krishna Conchem/BASF/SikaNote: 1. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 11 | Material and labour for providing and applying two coats of anticorrosive epoxy phenolic rebar protective system IPNet RB of Krishna Conchem or equivalent of approved make and quality comprises of resin and hardener mixed as per manufacturer\"s instructions with minimum 9-10 hours between the coats, sprinkling dry sand when 2nd coat is tacky so as to provide rough finish and ensuring air curing of minimum 10 hours after the top coat before any subsequent treatment etc. including scaffolding etc complete all as specified and as directed by Engineer-in-Charge.Make- Dr FIXIT/ FOSROC/ Krishna Conchem/BASF/Sika as approved by GENote:1. New Reinforcement shall be measured and paid separately under respective item.2. Cost of welding deemed to be inclusive in this item of work.3. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.4. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 12 | Material and labour for providing and applying a priming cum bonding coat of two component Epoxide Resin conforming to ASTM-C-882-91 of approved make and quality to clean and sound concrete area by brush or any other established method by mixing base and curing agent 2:1 proportion by weight for joining old and new concrete as per technical specifications of manufacturer complete all as specified and as directed by Engineer-in-Charge.Make- Dr FIXIT/ FOSROC/ Krishna Conchem/BASF/Sika as approved by GENote-1. Work shall be carried out as per the manufacturers specifications & certificate on this account shall be taken from consultant and as approved by Engineer-in-charge.2. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.3. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 13 | Material and labour for providing and laying 20 mm thick POLYMER MODIFIED MORTAR over identified R.C.C. members in One layer in proportion as per approved make, blended to a required consistency and applying and finishing by floating, curing after initial setting time, including providing and inserting 10 mm mild steel shear key bars (minimum 3 nos per sqm), wherever required, bonding slurry, etccomplete all as specified and as directed by Engineer-in-Charge.Make- Dr FIXIT/ FOSROC/ Krishna Conchem/BASF/Sika as approved by GE.Note- 1. Work is required to be carrried out to a height upto 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge.Note for Item No.1 to 12:-(i) The work under Item No. 1 to 8 shall be carried out by authorised applicator only.(i) The work under Item shall be carried out by authorised applicator only.(ii) Defect liability for these items shall be 5 years from certified date of completion.(iii) Amount of 5% of these items shall be retained during RAR and FB. This amount shall be released after successful completion of Defects liability period as mentioned above.(iv)Non destructive testing shall be got carried out through IIT / NIT / College of Engineering Pune to decide fulfillment of fitness criteria of structure. (v) The test shall be carried out at each discrete location or locations decided by GE or testing authority. (vi)The cost of testing shall be deemed to be included in the rate quoted by the contractor. Completion shall be issued by GE after only getting structural stability certificate of each respective building from testing authority |
| 14 | Taking down cement plaster of any description on brick or stone walls etc including raking out joints, hacking for key, scrubbing down with water etc and removing debris outside MD land complete all as specified and as directed by Engineer-in-ChargeNote- 1. Work is required to be carrried out to a height upto 15mt above GL for water tank with cylindrical side and Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 15 | Material and labourfor rendering 10mm thick on internal wall surfaces using factory manufactured pre mix/ready mixplaster of \"Roofit Mix\" of M/s Premier Floor to Roof Materials Pvt Ltd/\"Easy plast\" of M/s Walplast Products Pvt Ltd/\"Readiplast\" of M/s Ultratech Cement Ltd\" / Sound last PMC-1 of M/s Sound buildcare Pvt Ltd/or other approved equivalent make, having minimum composition of C:S : 1:3 using fully treated dry, well graded natural sand conforming to IS 383 suitable for plastering, having low rebound properties, low water demand for curing properties, mechanical mixing with water in a metallic tray only to make good consistency as per the specification of the Manufacturer and applied over masonry and concrete surfaces including dubbing of plasterof 10 to 15 mm thickfor levelling purpose with same ready mix plasterand finishing with sagol finish not less than 1mm thick, including cleaning the surfaces, curing and dubbing of plaster etc complete all as specified & directed by Engineer-in-Charge.Note- 1. Work is required to be carrried out for RCC dome to a height upto 15mt above GL for water tank with cylindrical side and Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 16 | Material and labourfor rendering 15mm thickusing factory manufactured pre mix/ready mixplaster of \"Roofit Mix\" of M/s Premier Floor to Roof Materials Pvt Ltd/\"Easy plast\" of M/s Walplast Products Pvt Ltd/\"Readiplast\" of M/s Ultratech Cement Ltd\" / Sound last PMC-1 of M/s Sound buildcare Pvt Ltd/or other approved equivalent make, having minimum composition of C:S : 1:4 using fully treated dry, well graded natural sand conforming to IS 383 suitable for plastering, having low rebound properties, low water demand for curing properties, mechanical mixing with water in a metallic tray only to make good consistency as per the specification of the Manufacturer and applied over exterior masonry and concrete surfaces with base coat of 10 mm thick and finishing coat of 5 mm thick final rendering with water proofing compound @3% as per manufacturer\"s instructions, including using richer mix for making corners if necessary, at all floors and level, including making grooves of existing size wherever required,inclding sagol finish including cleaning the surfaces, curing including provide of 150mm chicken wire mesh fixed with nails at the junction of RCC columns/walls/ beams/ lintels and brick masonry at external faces before plastering including scaffolding at any height and all safety materials required for execute worketc. complete all as per specifications & as directed by the Engineer-in-Charge.Note- 1. Work is required to be carrried out for RCC dome to a height upto 15mt above GL for water tank with cylindrical side and Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 17 | Supply only integral water proofing compound ISI marked complete all as specified and as directed by Engineer-in-Charge.Make : Pidilite Industries Ltd, Taloja /Super Aquacem (India) Ltd /FOSROC/Siko/Dr Fixit |
| 18 | Material and labour for opening out cracksaveraging 15mm wide and averaging 15mm deep ) in wall surfaces in \"V\" shape by mechanicalgrinder and removing the loose materialand filling the grooves with crack fillerof Dr. Fixit crack-X, shrink-free or equivalent all as per manufacturer\"s instructions and finishing the surfaces to match with existing finish complete all as specified and as directed by Engineer-in-Charge. Make: Dr Fixit/Fosroc/Krishna Conchem/BASF/Sikaas approved by GE. |
| 19 | Material and labour for complete removal of existing treatment of plastered wall surface and applying two coats of Acrylic weather proof coat 100% exterior grade paint over one coat ofacrylic primer over thick layer of external grade puttycomplete all as specified and as directed by Engineer-in-Charge.Make : APEX ULTIMA” of Asian Paints/ “WEATHER COAT ALL GUARD” of Berger Paints/\"EXCEL TOP GUARD” of Nerolac/ “DULUX WEATHERSHIELD MAX” of ICI IndiaNote- 1. Work is required to be carrried out to a height upto 15mt above GL for water tank with cylindrical side and Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 20 | Demolition of cement concrete (unreinforced) of any description and in any position, not otherwise specifically provided for and removal of rubbish outside MD land etc complete all as specified and as per directed all as specified and as directed by Engineer-in-Charge. |
| 21 | Excavation over areas n. exc 1.5 m in deep and getting out in soft/loose soil and removal outside MD land complete all as specified and as directed by Engr-in-Charge |
| 22 | All as per item No . 21 here in above but depth beyond 1.5metre or part thereof |
| 23 | Removing excavated material to a distance exceeding 250 m but not exceeding 500 m and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and as directed by Engineer-in-Charge |
| 24 | Site clerance and surface dressing the area/site in soft/loose soilincluding removing bushes/shrubs/ small saplings, tree roots etc and levelling the surface evenly and making good the site complete all as specified amd as directed by Engineer-in-charge. |
| 25 | Material and labour for hardcore of broken stone or boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface, rolling and consolidating formation surfaces in cutting with power roller of 8 to 12 Tonnes complete all as specified and as directed by Engineer-in-Charge. |
| 26 | Material and labour for 100 mm thick cement concrete (1:3:6) type C-2, using 40 mm graded stone aggregate as in sub base of flooring/ hard standing, path and finishing the surface even and fair without using extra cement complete all as specified and as directed by Engineer-in-Charge. |
| 27 | Material and labour for preparing new steel surfaces of any description, over 10cm width or girth, not otherwise described and applying two coats of synthetic enamel paint over a coat of red oxide primerLcomplete all as specified and as directed by Engineer-in-Charge.Make: Make: Asian Paints/ Nerolac Paints/ Dulux ( Akzonobel)/ Nippon Paint India Pvt Ltd |
| 28 | Supply, fix and jointing steel water tubing of 25mm bore medium grade, galvanised iron with all fittings such as Tees, elbows, sockets, bends, unions, short pieces, nipples, brass nuts and diminishing pieces complete all as per IS 1239 including fixed to wall / ceiling or laid in floor with suitable size GI clamps including taking down existing GI pipe and making good disturbed surfaces as per existing surfaces complete all as specified and as directed by Engineer-in-Charge.Make: Tata / Jindal / Surya Prakash / Zenith |
| 29 | ditto as per item no 28 above but for 50 mm GI bore pipe. |
| 30 | Material & labour for Cleaning of RCC Over head water tanks in different stages in modern methods by using sophisticated equipment\"s i.e. dewatering, removing of sludge and other impurities. High pressure water jet cleaning, scrubbing hard strains if required and cleaning by using Modern vacuum cleaner, spraying Safe Anti-Bacteria solution, Applying Ultra Violet Radiation/Ozone for removing Bacteria (if any) including all necessary arrangements like scaffolding, machine, motor pumps, pipes, sludge disposal etc complete all as specified and as directed by Engineer in charge.Note- RCC Dome of water tank is at height above 15 meter, necessary arrangement upto that height shall be arranged by contractor including scaffolding or stairs, platform for keeping machinery req. for task etc and Contractor shall take into account the said criteria while quoting the rate. |
| 31 | Material and labour for Strengthening structural elements with non metallic composite fiber wrapping system comprise of uni-directional carbon fiber sheet (430 GSM) and compatible saturate Profiling, applying compatible primer on prepared substrate, Filling the holes and uneven surface with thixotropic epoxy putty etc. , complete mechanized wetting of fiber sheet, cutting the fabric to required size, mixing of saturant and filling in tub area of the saturation machine, placing the fiber on metallic rods and pass through the rollers of machine and saturate tub ensuring complete wetting (65% fiber volume fraction) of fibers, removing the fiber on rod and placing the new fiber sheet, wrapping the fiber sheet to structural element at desired orientation using tamping roller to avoid any air voids etc., repeating the same procedure for multiple layer with the interval of 8 hrs ,applying second coat of saturate after minimum 12 hrs after first coat, rectify air voids if any and finally rendering with10mm thickin CM 1:6 including finishing even & smooth without using extra cement complete all as specified and as directed by Engineer-in-Charge.Mode of measurement- Per sq.mt of surface area of carbon fiber sheet without lapping.Make- FOSROC/FIXIT/Krishna Conchem/ SikaNote- 1. Work is required to be carrried out to a height upto of 15mt above GL. Contractor shall take into account the said criteria while quoting the rate.2. The contractor shall make provision of steel scaffolding with all safety materials required toexecute worketc as directed by the Engineer-in-Charge. |
| 32 | Supply, fix and jointing steel water tubing of 80mm bore medium grade, galvanised iron with all fittings such as Tees, elbows, sockets, bends, unions, short pieces, nipples, brass nuts and diminishing pieces complete all as per IS 1239 including fixed to wall / ceiling or laid in floor or in trenches, with suitable size GI clamps including taking down existing GI pipe and making good disturbed surfaces as per existing surfaces complete all as specified and as directed by Engineer-in-Charge.Make: Tata / Jindal / Surya Prakash / Zenith |
| 33 | Material and labour for earthing complete with Galvanised steel earth plate electrode 60 cm x 60 cm x 6 mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below normal ground level) with top edge of earth the plate not less than 1.5 metres below normal ground level, connected to plate with GI earth strip 32 x6mm, 7.5 m long from earth point to test point and other end connected to control board / panel / equipment, laid under floors/plinths or fixed on walls or concealed in wall etc by means of bolts, nuts, check nuts and washers made out of galvanised iron or steel with provision of charcoal & common salt packed upto minimum 150 mm all around the earth plate and protected by 40 mm bore light grade galvanised iron pipe complete allas shown in electrical plate No.3 of MES schedule Part I, 2009 withPCC pit in PCC 1:2:4 type B1 using 20 mm graded stone aggregate,MS angle iron frame of size 50mm x 50mm x 5mm, cast iron cover with locking arrangements, GI 15 mm bore medium grade pipe and CI funnel with wire mesh for watering arrangement including necessary excavation and earth work in any type of soil/strata & testing complete all as specified and as directed by Engineer-in-Charge. |
| 34 | Supply, fix, joint and testing Cast Iron /Ductile iron Sluice Valve heavy duty of 80mm dia, with stainless steel spindle,PN 1.6 (Flanged) with iron wheel head, hand operated, bronze body seat ring, jointing, coupling both ends for cast iron pipes including nuts, bolts, rubber gaskets etc including takingdown old unserviceable Sluice valvecomplete all as specified and as directed by Engineer-in-charge.Make: Kirloskar / Upadhaya / Leader / Venus / L & T (audco)/ BIR |
| 35 | Material and labour for construction of new valve chamber of size 900mm x 900mm x 600mm ( Internal size)including necessary excavation and earth work in any type of soil, PCC foundation (1:3:6) type C-2, using 40mm graded stone aggregate as in base concrete 100mm thick, 15cm offset, 230mm thick brick work in CM 1:6 with 10 mm thick rendering internally and 15 mm thick externally in CM 1:4, 50mm thick PCC 1:2:4 type B1 as in coping, 6 mm thick MS cover with hinges and locking arrangement, fixed to angle iron frame made out of 40 x 40 x 6 mm MS angles complete with two coats of synthetic enamel paint over one coat of red zinc chrome primer on all metal surfaces & three coats of white wash on all plastered surfaces of valve chambers including dismantling of unserviceable valve chamber with rusted MS cover without disturbing the existing pipeline etc complete all as specified & directed by Engineer -in-Charge. |
| 36 | Material and labour for test point terminal block made of gun metal or phosphorus bronze size 75x75x25mm, drilled and screwed including 3 nos 8mm dia 25mm long hexagonal screws, including taking down old unserviceablecomplete all as specified and as directed by Engineer-in-Charge. |
| 37 | Supply and fix aluminium strip of 25 x 3.15mm , including taking down of old unsercivable aluminium strip, complete all as specified and directed by Engr-in-Charge.Note : Rate for Necessary insulator for fixing of strip is deemed to be included in the quoted rate. |
| 38 | Supply and fix single pointed air termination aluminium rod, 12mm dia, 300mm long including taking down old unserviceable aluminium rod, all as specified and directed by Engr-in-Charge. |
| 39 | Material and labour for repair to taking down the existing Aviation obstruction light and replacing with new LED obstruction lightfixed on top of OHT with necessary fixing arrangement and providing PVC insulated three core flexible wire through conduitpipe on surface of water tank upto control MCB enclosure with MCB SPN 6Amps all as specified and directed by Engineer-in-Charge as per Make : Cat No SZPALMX-2 of Shakthi, or equivalent to CG, Bajaj |
| 40 | Supplying, laying,connecting, testing & commissioning LT UG XLPE insulated, heavy duty, 1100 V grade (earthed )electric cable with aluminium conductor, served with an inner sheathing of PVC tape, armoured with galvanised steel wire or tape and overall PVC sheathed of size 6 Sqmm x 4 core, laid in trenches or passing through pipe or fixed to wall, making all connections with and including provision of necessary glands, lugs, bushing etc as requiredincluding taking down old unserviceable cable complete all as specified and as directed by Engineer-in-Charge Note :Earthwork excavation, DWC/GI pipe for cable protection shall be measured and paid separately in their respective itemsMake: Cable Corporation of India (CCI)/ Asian Cable Co, Chattisgarh/ Finolex/ Polycab/ Gloster/Universal/ RPG Cables Ltd , Thane/ Havells India Ltd/ RR Kabel/ KEI Industries Ltd(KEI) |
| 41 | Material and labour for taking down unserviceable items of water level indicator of over head service tank of capacity upto 10000 gallons and carrying out repair / maintenance work including supplying and fixing following items all as specified and as directed by Engineer-in-Charge.(a) Copper ball (As per sample )- 1 No(b) Nylon coated steel rope dia not less than 8mm - Approx 18RM(c) MS pulley with support (As per sample) approx - 10Nos(d) GI pipe for protection of nylon rope 20mm dia - 10RM(e) MS sheet & angles, frame channel with moving indicator arrangement including scale marked and with two coats of synthetic enamel paint over a coat of red zinc chrome primer etc. |
| 42 | Supply and fix gun metal gate valve of 50mm borewith iron wheel head, screwed both ends for iron pipes & fixed including taking down existing etc complete all as specified and as directed by Engineer-in-Charge for following sizes:Make: Kirloskar / Zoloto / Kartar / Upadhaya / Leader / BIR |
| 43 | Supply, fix and jointing steel water tubing of 50mm bore medium grade, galvanised iron with all fittings such as Tees, elbows, sockets, bends, unions, short pieces, nipples, brass nuts and diminishing pieces complete all as per IS 1239 including fixed to wall / ceiling or laid in floor or in trenches, with suitable size GI clamps and making good disturbed surfaces as per existing surfaces complete all as specified and as directed by Engineer-in-Charge.Make: Tata / Jindal / Surya Prakash / Zenith |
| 44 | Excavation in trenches, not exceeding 1.50 m wide and not exceeding 1.5 m in depth, for foundation, laying of cables/pipes etc andgetting out in soft/loose soilcomplete all as specified and as directed by Engineer-in-Charge. |
| 45 | Returning, filling in including spreading, levelling, watering and well ramming in layers, not exceeding 25cm in soil complete all as specified and as directed by Engineer-in-Charge. |
| 46 | Removing excavated material to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and as directed by Engineer-in-Charge |
| 47 | Material and labour forPlain Cement Concrete 1:3:6 type C2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified and as directed by the Engineer-in-charge |
| 48 | Material and labour for brick work with sub class \"B\" bricks, straight or curved on plan, exceeding 6 m mean radius, built in cement mortar 1:6 complete all as specified and as directed by Engineer-in-Charge. |
| 49 | Material and labour for rendering 15mm thick plaster in cement mortar (1:4) on external surfaces of the brick, PCC blockor concrete surfacesmixed with water proofing compoundand finishing the surfaces even and smooth without using extra cement , upto the height of bldg roof including necessaryformwork/ scaffolding /laddersand safety beltetc complete all as specified and as directed by Engineer-in-Charge.Note: waterproofing compound shall be measured and paid separately |
| 50 | Supply only liquid water proofing compound ISI marked complete all as specified and as directed by Engineer-in-Charge.Make : Pidilite Industries Ltd, Taloja /Super Aquacem (India) Ltd /FOSROC/Siko/Dr Fixit |
| 51 | Material and labour for PCC (1:2:4) type B1 using 20 mm graded stone aggregate as in flooring, path/hardstanding and finishing the surface even and fair without using extra cement complete all as specified and as directed by Engineer-in-Charge. |
| 52 | Material and labour for 100mm thick Plain Cement Concrete 1:4:8 type D2,using 40mm graded stone aggregate as in sub base of flooring/ hard standing/path and finished even and fair without using extra cement etc complete all as specified and as directed by Engineer-in-Charge |
| 53 | M&for providing and laying 60mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour, design & pattern as in footpath, parks, lawns, drive ways or light traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of fine sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sandcomplete all as specified and as directed by Engineer-in-ChargeMake: Mehtab Tiles/Indore/M/S Ultra Tiles/NITCO/Topaz Tiles/Navya Tiles Jodhpur |
| 54 | M&L for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed by Engineer-in-Charge.. |
| 55 | M&L for Bands, straps, supports or stays for rainwater, ventilating pipes, including bolts, if required: hooks (stay), heavy, for large gates; hook and pintle hinges; large hasps and staples; chains; hand made sliding bolts; clamps; hold fasts; wall ties; hooks for hanging fans; plain angle cleats for securing purlins to wood trusses or rafters; knee piece inserts; two way and three way straps, plate washers and similar small articles conforming to Fe-290 Gde-E-165complete all as specified and as directed by Engineer-in-Charge.. |
| 56 | M&L for Mild steel sheet eaves gutters of dia 150mm, thickness of sheet 1.25mm galvanised class 3, half round with rounded edges complete all as specified and as directed by Engineer-in-Charge.. |
| 57 | Supply and fixPVC (SWR), type B,single socketed in any length with rubber ring joints, 110mm dia, fixed to wallscomplete all as specified and as directed by Engineer-in-Charge..Make: Supreme/ PRINCE (Ultrafit)/ Kisan/ Finolex/ Astral |
| 58 | Material and labour for Plain Cement Concrete (1:2:4) type B-1, using 20 mm graded stone aggregate as in surface channels and benching of drain and finishing the surface even and fair without using extra cement all as specified and as per directed all as specified and as directed by Engineer-in-Charge. |
| 59 | M & L for extra for forming fair finished drain or channel 30cm inner girth in cement concrete with using extra cement, including forms, moulds, mitred/stopped ends etc complete all as specified and as directed. |
| 60 | Material and labour forPlain Cement Concrete 1:3:6 type C1 using 20mm graded stone aggregate as in coping of poleand the like including necessary form work for fair finished surfaces including weathering, slightly rounded or chamfered angles and throating, as directed etc complete all as specified and as directed by Engineer-in-Charge. |
| 61 | Material and labour for rolled mild steel sectionsas in joist, channel, angle, or tee sections, fixed independently, without connecting plates etc conforming toFe 410 W Gde E- 250, Quality B complete all as specified and as directed by Engineer-in-Charge. |
| 62 | Material and labour for Welded steel wire fabric n exc 4 kg/Sqm supplied and fixed complete to wood or steel members |
| 63 | Supply and fix screen filter for drip irrigation filtration of debris & impurities above 120 MICRON complete set including all connected fittings and accessories complete all as specified and directed by Engr-in-Chage |
| 64 | S&F in repair pressure gauge dial type 2 inch, for measurement of the water pressure up to 14 Kgs rating or as per existing size complete all as specified and directed. |
| 65 | Supply and laying water tubing, 50mm bore HDPE laid in trenches/surface/wall, with all fittings such as by pass valve, QRC pump connector, QRC Tee, QRC bend, QRC service saddle, QRC end cap, sprinkler nozzles and all connected accessories, complete all as specified by engr-in-charge. |
| 66 | Supply and fix control valve of size 2 inch with mxium pressure 10 bar manual type complete all as specified and directed by Engr-in-Charge. |
| 67 | Supply and fix riser pipe of size 1 inch with mxium length of riser pipe not less then 17 inch complete all as specified and directed by Engr-in-Charge. |
| 68 | Supply and fix 5HP Three Phase, 415 volts, Centrifugal Monoblock Pump, power rating 3.7 KW with nominal head upto 38 m at 348 LPM with inlet and outlet pipe size 50 mm including necessary foundation as per manufacturer specifications complete all as specified and directed by engr-in-charge.Make: Kirloskar / Beacon/ Crompton Greaves/KSB/Mather & Platt /Jyoti |
| 69 | Supply, laying, connecting and commissioning LT under ground XLPE cable 25 sq.mm 4 core 1100 volts grade (earthed) PVC insulated and sheathed, armour with aluminium conductor including connecting with suitable size of cable glands lugs etc laid in trenches or fixed on wall complete all as specified and directed.Make: Cable Corporation of India (CCI)/ Asian Cable Co, Chattisgarh/ Finolex/ Polycab/ Gloster/Universal/ RPG Cables Ltd , Thane/ Havells India Ltd/ RR Kabel/ KEI Industries Ltd(KEI) |
| 70 | Supply, install, testing & commissioning pedestal cubical type double door LT Feeder piller box factory made modular construction fabricated out of 3 mm thick CRCA sheet, angle iron channels, epoxy powder coated to give a superior finish, outdoor type, totally enclosed dust & vermin proof with locking arrangements (compartment wise) front & back side opening system including rain shed. Overall size of each incoming & outgoing modules should not less than (350mmX350mmX550mm), and busbar chamber should be suitable for accommodating all Aluminium bus bar strips (50mm X 10mm x 04 Nos) fixed on porcelain insulators, and one independent metering module suitable for accomodating three phase volt meter & ammeter digital type, indicator lamps, cable entry/exits cut out at bottom or upper part as mentioned below, complete electrically inter connected with Aluminium strips of suitable size for all incoming and outgoing MCCBs and accessories with fixing arrangement on PCC (1:3:6) type C-2 bed block with studs, bolts, nuts & washers, Danger notice board with scull suitable for 415 volts or required size to be fixed on Panel and consisting of the following accessories:-Note:- (a) Panel shall be Manufactured from CPRI approved manufacturer and Drawing for Feeder piller box shall be first approval by Engr-in-Charge(b) Aluminium bus bar duty covered with colour coded shrinkable sleeves of required size for Phases and neutral - 01 set |
| 71 | (c) Digital multifunction meter of size 96x96 mm to measure current, voltage, frequency and power factor with built in selector switch and programmable CT of appropriate ratio.- 01 No(d) Panel indicating lamp neon/LED type (Red, Yellow & Blue) with lamp holders - 03 Nos(e) Panel instrumental wiring with FRLS suitable size but not less than 2.5 sq.mm copper wire single core-01 Job(f) All incoming/ outgoing feeders to be marked with suitable size of stencils as directed.Incoming :-(a) MCCB 4 pole, Ics=100%, Ics- 35/36 KA, 415 Volts, 100 Amps, with thermal adjustable and fixed magnetic setting with extended terminals -01 Nos.Outgoing :-(b) MCCB 4 pole, Ics=100%, Icu- 35/36KA, 415 Volts, 63 Amps, with thermal adjustable and fixed magnetic setting with extended terminals -02 Nos.(c) Automatic Astro time switch panel mounted flush to panel door, 230V AC with one selector switch for auto/manual selection -01 No.(d) Power contactor 3pole AC, with TPN 230V coil, 70 Amps rating. -01 No(e) DOL starter 5 HP 3 Phase for open excuision in panel with push button switch ON/OFF indicator on door of each module with single phase protection relay and TPN of suitable size- 1 Nos. |
| 72 | Material and labour for submain wiring completewith and including2 runs of 16.0sqmm,single core FRLS, PVC insulated and unsheathed, multistranded, copper conductor cable, single core, 1100 Volts grade, ( Phase- R Neutral- Black) drawn through and including non metallic PVC flexible pipe, heavy grade including accessories etc as required from starter panel to motor terminal and fixed on walls and 6.0sqmm PVC multistranded copper conductor cable (Green)for earthing and connected to common earth dolly omplete all as specified and as directed by Engineer-in-Charge.Note :One run of 16.0sqmm PVC insulated cable and one runof flexible pipe shall be measured as one unit length.Make of Cable-Plaza, Finolex, Havells, Polycab |
| 73 | Supply and fix Pre- painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50mm thick as per approved profile of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws or L type or J type or cranked hook bolts or as per manufacture instruction complete all as specified and as directed by Engineer-in-Charge.Make: JINDAL / INDALCO / HINDALCO / ASSOCIATED Profiles and Aluminium Ltd / ESSAR colour coated sheets |
| 74 | Material and labour for rolled mild steel equal angle (30x30x5mm) sections as in main pole & beam rolled sections as in cross beam with connecting plate cut to ordinary length duly welded for making shed etcconforming toFe 410 W Gde E- 250, Quality B complete all as specified and as directed by Engineer-in-Charge. |
| 75 | Supply and lay double wall corrugated (DWC) HDPE pipe 40mm outer dia , as per IS-16205 including couplers and bend for cable protection laid in trenches etc complete all as specified and as directed by Engineer-in-ChargeMake : TELEREX 450N/ Rex Polyextrusion Ltd/ Finolex/ Prince Pipes and fittings ltd/Kisan/Supreme/JAIN IRRIGATION SYS/ Astral |
| 76 | Note:Deduct Credit for demolished / dismantled material of Rs. (-) 14,081.00 (Minus) as listed in Schedule of Credit.Tenderers will not quote against this item being a tentative amount to be considered to arrive at the \"Contract Sum\" |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail