| 1 | AMC from OEM/ authorised service provider for routinemaintenance and check up of the PAC unit installed at NCN Data centre includinginspection of all units and carry out preventive maintenance with relevant PM checklist , complete checking ofthe refrigeration system ,fan motor, control cards, Humidity bottle, dehumidify fire, actuator valves, temperature and humidity sensor, and other respective parts to ensuring the healthy condition of the all units, Checking the functioning of all accessories, cleaning of the indoor filter’s microprocessors PCB card, checking the suction and discharge pressure of each unit, checking of all respective sensors and external cleaning with suitable solution. The tenderer shall be attend the all breakdown complaints whenever required at any timeand made serviceable with in 48hrs time for above mentionedall as specified and directed by Engineer-in-charge.Make- Blue box/ Swegon, Model: DATATEC VEDA10-1 CH-Qty-3 No\"s and total Capacity 6 X 3- 18 TR. |
| 2 | PreventiveMaintenace scope of work:-(i) To visit & check the operating parameters of the PAC every monthmonth as perschedules.(ii) To review the previous months operating log records and alarm history. (iii) To inspect the unit for any unusual vibration, noise etc.(iv) To check for a sign of refrigerant leakage and rectifying the same. (v) To check the operation of thevalves.(vi) To check the proper functioning of microprocessor and take control test.(vii) All the breakdowns including the compressor failure, if any shall be attended and rectified. (viii) Rewinding/ replacing the the compressorif required.(ix) Repairing of the leakages including charging of gas.(x) To attend to all the complaints as and when called for. (xi) To provide any spare covered under the scope ofPAC. (xii) Replacement/repair of all spares covered under the scope ofPACincluded in the rate quoted by Contractor |
| 3 | AMC from OEM/authorised service provider for maintenance and routine check up of the fire detection systeminstalled at NCN Data Centre including inspection of complete panel and carry out preventive maintenance with relevant PM checklist, checking and filling of nitrogen pressurised HFC227ea extinguishing cylinder and its pipe line, checking the all control wiring, fire panel, Smoke & heat detector, relay module, VESDA and power supply etc as per installed in data centre area. Attending to all breakdown complaints whenever required. Note(i): Replacement/repair ofall spares covered under the scope of fire detection system included in the above quoted rate by Contractor. Make- Siemens ( Desigo fire with hardware and filed devices) |
| 4 | Note (ii):-(a) For item No 1 & 3aboveMechanics have to attend complaints,faults, routine cleaning, Dry servicing of plant and filters and register shall be maintained . Any number of manpower required for carrying out the routine maintenance is deemed to be included in the quoted rates. (b) The contractor shall ensure to produce AMC documents within one week of acceptance of contract and arrange visit ofOEM/ authorised service provider\"sEngineer in every month and report/ serviceability of Out door units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs.(c) AC mechanic must be experienced in VRF/VRV Plants andcapable for carrying out any type of maintenance or attending breakdown in above mentioned plants.(d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any extra expenditure to the Govt.(e) The cost of repair/replacement of all parts covered under the scope of above equipmentsshall be deemed to be included in quoted rates. |
| 5 | Supply and fix in replacement of indoor inverter blower/ fan motor suitable for existing casette type indoor unit of 1.59 TR capacity complete all as specifieid and directedMake: Recommended by OEM Hitachi.Note :-Contractor shall be responsible for replacement of false ceiling, if damage occured while servicing of Ceiling/walls suspended units. |
| 6 | Supply and fixing in repair ofpcb card for casette type Unit of 1.59 TR capacity suitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 7 | Supply and fixing automatic condensate drain Pump suitable for existing four way casette/CSU/hiwall indoor units of capacity 1.59/3 TRincluding testing complete all as specified and directed. |
| 8 | Supply and fixing indoor condensor/cooling coil suitable forcasette type indoor unit of 1.59 TR capacity complete all as specifieid and directed |
| 9 | Supply and fixing of PVC Drain pipe outside diameter 20cm and nominal thicknesstrenched on walls, ceiling suspended, hanged with all necessary clamps, saddles & support complete all as specifieid and directed |
| 10 | Supply and fixing in repair ofindoor filter for casette type Unit of 1.59TR capacity suitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 11 | Supply and fixing Linear expansion Valve for four way casette type indoor unitsof VRV unit 1.59 TR including testing complete all as specified and directed. Make: Recommended by OEM Hitachi |
| 12 | Supply and fixing in repair ofdigital display module for casette/Hi wall type Unit suitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 13 | Supply and fixing Adressing Board for four way casettetype indoor units of VRVunit 1.59TR including testing complete all as specified and directed. Make: Recommended by OEM Hitachi |
| 14 | Supply and fix in replacement of indoor inverter air blower motor suitable for existing Hi-wall indoor unit of 3.0 TR capacity complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 15 | Supply and fixing in repair ofpcb card for Hi-wall unit of 3.0 TR capacity suitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 16 | Supply and fixing indoor condensor coil suitable forHi-wall type indoor unit of 3.0 TR capacity complete all as specifieid and directed . Make: Recommended by OEM Hitachi. |
| 17 | Supply and fixing in repair ofindoor filterfor Hi-walltype indoor unit of 3.0 TR capacity suitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 18 | Supply and fixing Linear expansion Valve for hiwalltype indoor unitsof VRV unit3 TR including testing complete all as specified and directed. Make: Recommended by OEM Hitachi |
| 19 | Supply and fixing Adressing Board for hiwalltype indoor units of VRVunit 3TR including testing complete all as specified and directed. Make: Recommended by OEM Hitachi |
| 20 | Supply and fixing in repair ofmotor for flap swingfor Hi-wall/casettetype indoor unitsuitable forexisting make indoor units complete all as specifieid and directed.Make: Recommended by OEM Hitachi |
| 21 | Material and labourfor repairing ofpipe line stand of VRF/PAC System outdoor units |
| 22 | Supply and fix in replacement of suitable inverter type fan motor of 6 HP outdoor unit.Make: Recommended by OEM Hitachi |
| 23 | Supply and fix in replacement of Fan blades suilatble for existing out door units VRF systems |
| 24 | Supply and fixing inverter main PCB For VRF outdoor capacity of 6HP suitable forexisting Hitachi make out door units complete all as specifieid and directed.Make-Hitachi Model No. RAS-6HNBRKQ |
| 25 | Supply and fixing the Sealed New Brand Compressor of 6 HP Capacity for Out door units of VRV AC Plant including testing complete all as specified and directed. Make-Hitachi Model No. RAS-6HNBRKQ |
| 26 | Material and labourfor repairing ofover voltage board of outdoor unitsof any capacity |
| 27 | Supply and fill refrigerant R-410A as per existing compressor ofHVAC VRF outdoor unitsystemcapacity of 6 HP suitable forexisting Hitachi make complete all as specified and as directed. |
| 28 | Material and labourfor repairing ofcopper pipe lineof size 15mm to 22mm and its insulation of VRF outdoor unitsof any capacity of 6 HP complete all as specified and as directed. |
| 29 | Supply & fixing MCCB FP 100 Amps,16KA,thermal magnetic,415volts complete all as specified and directed by the Engr- in- charge. |
| 30 | Supply & fixing MCCB FP 250 Amps,36KA,thermal magnetic,415volts complete all as specified and directed by the Engr- in- charge. |
| 31 | Supply & fixing MCCB FP 63 Amps,16KA,thermal magnetic,415volts complete all as specified and directed by the Engr- in- charge. |
| 32 | Supply & fixing contactor any type for LT panel complete all as specified and directed by the Engr- in- charge. |
| 33 | Supply and fixing replacement ofSelector Switch four position. |
| 34 | Supply & fixing relay Relay-24 VDC/ 12 VDC / 220 VAC / 240 VACfor HVAC plant control panel and for LT panel complete all as specified and directed by the Engr- in- charge. |
| 35 | S&F In replacement of phase indicator of LED type mounting on LT panel for three phase indication of R, Y& B colour |
| 36 | Material and labourfor structural steel work for supporting to duct of AC Plant framed work as in doors or gates of angle or other section with gusset plates, rails, bracesetc complete drilled for fixing or other covering doors etc to be prepared for hanging or sliding with and including either hooks or hinges or steel hanging fittings by using Fe-410W (gde-e-250) Quality steel and grouting the base of structure with PCC 1:3:6 type and all as specified and directed. |
| 37 | Material and labourfor painting of existingpanels by using two coat of synthetic enamel paint after removal of the rusted portions complete all as specified and as directed by Engineer-in-charge. |
| 38 | Material and labour for repair to existing LT panels front and rear doors of locking arrangements by using suitable hinges complete all as specified and as directed by Engineer-in-charge. |
| 39 | Material and labour for periodical checking of the 60 KVAUPSinstalled at NCN Data Centre along with power backup batteries and checking the function of AC/DC capacitors and UPS battery voltage,cleaning of external parts, replacing the minor parts and made functional , function of rectifier section, inverter section and other all respectively PCB card,all as specified and directedMake of 60 KVA UPS - ABB, Model- DPA U Scale, Qty-2 Nos , Note:Replacement/repair ofall spares covered under the scope of UPS included in the above quoted rate by Contractor. |
| 40 | Material and labour for periodical checking of the 5 KVAUPSinstalled at NCN Data Centre along with power backup batteries and checking the function of AC/DC capacitors and UPS battery voltage,cleaning of external parts, replacing the minor parts and made functional , function of rectifier section, inverter section and other all respectively PCB card,all as specified and directedMake of 5 KVA UPS - Delta , Model- Delta N-68, Qty-2Nos. Note:Replacement/repair ofall spares covered under the scope of UPS included in the above quoted rate by Contractor. |