| 1 | PART -A (Design and Detailed Consultancy Services) |
| 2 | Design and detailed consultancy for the following items: |
| 3 | (a) Consultancy services forthe proposed buildings & Miscellaneous Items of work complete as per scope of workof Appx \"D\" and \"Scope & Period of Completion\", excluding Soil investigation / Geo Technical Investigation.(b) Consultancy services forthe proposed buildings & Miscellaneous Items of work complete as per scope of workof Appx \"D\" if any amendment to BOQ of main Civil Composite works/NS Items if any required to site conditions/ Soil investigation report hasto be submitted after corrections excluding Soil investigation / Geo Technical Investigation.(c) Consultancy services forthe proposed Air conditioning and external services of civil & E/Mwork complete as per scope of workof Appx \"D\" of Tender Enquiry andexcluding Soil investigation / Geo Technical Investigation.(Note:The rates quoted shall be on percentage basis of the estimated cost of work). |
| 4 | PART -B (GEO TECHNICAL INVESTIGATION)(Note:The rates quoted shall be on item rates basis). |
| 5 | Mobilisation and demobilisation of equipment and personnel to the site for carrying out the following field investigations. |
| 6 | Soil investigation by carrying out bore holes of 100mm dia as per relevant / latestIS code, collecting samples of disturbed soil and conducting the following tests as per relevant and latest IS code in all types of soils and submission of detailed soil investigaton report in triplicate, recommending safe foundation level and type of foundation along with bearing capacity considering effect of water table etc and other parameters: Conducng SPTNatural moisture contentDry and wet densitySoaked unconfined compression testPercentage absorptionMechanical analysis and moisture contentLiquid and plastic limit testSample preparationSieve analysisSoil classification as per ISDirect shear testConsolidation testUnconfined compression on rock |
| 7 | Item same as Item no 2 but in all types of rocks |
| 8 | Testing charges for water samples |
| 9 | Electrical resistivity test all as per specifications |
| 10 | Professional consulting fees inclusive of preparation and submission of Technical Report in threee copies along with soft copy and recommendations. |
| 11 | Carrying out topographical survey of the area with total station, giving traverse of surveyed area, spot levels at 10m center to center interval, includings demarcating the existing major structures & buildings, alignment of existing roads, Runways, taxitracks, other structures/ details and major trees (with girth more than 30cm at 1.00M above ground level) within surveyed & 50M surroundings of surveyed area and transfer of MSL/ RL from the exixsting near by available points etc all as directed by the department. |
| 12 | (Note: If any markings is given to the existing boundary pillars, compartment pillars/ munars and tree no given by the Revenue/ Forest department, same to be reflected on topo sheet) |
| 13 | Providing and fixing 450X450X600mm PCC(1:2:4) permanent bench mark pillars with fixing of steel plate of size 200x200x8mm on top of pillars including excavation cost and conveyance of materials and painting with identification marks, numbering of levels etc, complete as directed. |
| 14 | Providing and fixing 300X300X600mm PCC(1:2:4) grid pillars at every 100m c/c including excavation, cost and conveyance of materials and painting with identification marks, numbering etc, complete as directed. |
| 15 | Submission of six sets of survey report/drawings and one set of CD with traverse and spot levels, contour maps and details of trees. |