|
| 1 | 1.Renovation of the LPG Crematon at Kattupakkam Burial ground in Kattupakkam Panchayat. |
| 2 | Design, Supply A Construction of Cremacion Chamber having the innrr dimensions of 940mm x I I50mm x 2350mm and Outer Dimention will be I900mm X 3000mm X 2100mm fabricated out oFheavy duty material & proc idcd with necessary openings for gasous Fual firing through burners and feeding body. The Prime Chamber shall b¢ constructed with 3 Layers inner most will br 1 I5mm 15-8 quality fire bricks tDalmia Stake only ) 2nd layer will be I I Smm Hot fécc Insulation Bricks Rajestan Make Ord layer will bc75mm Cold fsce Insulation brick and Outer will be mild Sccel sh¢cts provission to with stand temperature and insulation bricks to ensure minimum heat loss. The furnace shall have Ash collection chamber with door size of 400rnm X 3S0mm & provision for periodic ash removal. The fñmaee shall have ceramic tiles finishing on che outer side. The front side of furnace will be covered by moving MS fabricated door lined with Insulation Bricks. Door operation will be the Mororised /manual. The Furnace will have the 7 Nos of Body Resisting Cast Iron solid ShappedBricks. |
| 3 | Design Supply end Construmion of Seconcdary Chamber for the Re-Incineration Flue Gas haviny the innor Sixe of 400mmX I 800mmX400mm. The Secondary Chamber shall be constructed with .R Lgyers inner most will be I I Smm 15-8 quality fire bricks (Dalmia Make only ) 2nd layer will be I hmm Hot face Insulation Bricks Rajostan Make .3rd layer will bc75mm Cold face Insulation briCk and Outw will b¢ mild Stc•l sheets provission tn wi‹h stand iemperacurc and insulation bricks to cnsurr minimum heat loss. High Alumina Firt Briclcs backked with insulation bricks and the ouner sixc of I 400mmX2 I00mmX700mm and the Providing of Flue Gas Entry and Outlet |
| 4 | Design. Supply, deliver and Erection of Chimney shall bo fabricated out of MS material ol° thick 10\"8 mm v ing loom bonom to top with bonom diarn<\er shall noi be less than I000mm and top diameter 324 mm to a height of .30 m (min). Deisgn shall conform to IS 6533 norm and chimney shall br provided rich accessories such as Ladder / Platform, Sampling \"Nozzle, Lightning Arrestor, Drain Plug, Bottom Door ecc.. and not restricted to only these complete systcm compIving to Std norms. 6himn jointing flanee gasket shall be provided b§ asbestos gasket instead of rubber flange gasket including testing and commissioning etc.. complete.The Base Segment *iI I the I 000mm to 8O0mm cone, second Segment will the 800mm to 600mm cone. Third Scgment »‘iIl be 600mm to 400mm done. Forth segment will be the 400mm to l25mm Cone. The Final Segment will be the 32Smm straight Pipe. All the Segments length will be the 6000mm. .All the Chimney\" Flanges Shall be I *mm thick. The Base Plate of the Chimne;’ shall b< 25mm thick plate. |
| 5 | Duct Line From Cremation Chamber to Scrubbing Unit with Insulating c Refractory cement T\"he Outer Duot will be Made out of Mind Steel end the Inner will be Lined with Refractory Cement wich the thickness of fi0mm.the Outer Dia will be 400mm |
| 6 | Supply Deli veg and fising of Centrifugal Fan should be the 5 HP Plot or of suitable raiing for Sucking of Fumes from the Fumcc and letout to chc Chimney in cerms of \”oIumetric Flow kate & Pressure Hmd de ’elopment. The Impeller Should be the Stainless Steel 55-304 Grade and the 6asiny should be the stainless Steel 2 mm thickness.The Mob shall be 1S/SS Bs dictated by the Incinerator System operation. |
| 7 | Duct Line From Scrubber to ID Fan Blower and ID Fan Blower and to the Chimney. The Duct will be fVladc out of Mild Steel conscruction with Flanges of 280rnm to S2Smm Dia. |
| 8 | Electrical Panel Board. Back, Electrical cables. \\’iring etc.. as directed by the departmenUl officers.The Panel Board will be capable for the Door Operation, Blower and Pump ON/OFF controls, and Burner Control Operations. The Total no. of 4 Burners will have individual Control Switch for Ignition and the Common Switch for the Blower Controls.The Control panel will be death wired with Idieny‘ marked umbers and the cables for the Door will be the I .5 Sq mm 1 core wire for ihe Suitable length from the Control panel o motor. The 4 Nos Burner Table will the I .5 Sq.mm 3 core suitable length ftom the control panel co Burners and the Motor will control the Limit with limit switches. The Fume Duct ID Blower cable u‘iII be the 4Sq.mm 3 Core cable from Controlpanel to fv1otor. The C”ontrol Panel Should have the MSB. Indicating Lamps. Push Buttons. OF OFF Switches, Contactors. Temperature Control ter. Over load Relays and Thermocouple etc.. |
| 9 | LPG burner seis UfilTECH/Reputed make with LPG bank and control panel supply’ of 4hos of burners with blower and fully auto control system. LPG fired ignition. flame sensor and auto cut ofT imcorgorated in a separace controller equivalent to imported control system For air and LPG ilh auto ignition system and supply of 10 cy linder bank wi‹h pipeline frt›m KPG cylinder bacL upto each burner end b\\" using TATA: C class grade material |
| 10 | Supply and Fixing of” 2HP Hiyh Presume Pump fcr the ficruhbiny S›stem u\"ith \\’ater Line Connections \u the Scrubbing unit and Drain connections to the Tank |
| 11 | Hi*h Pressure \ enturi 6 ct Scrubber for entrainment of particulate markers. remoal al ul soluble emissions and sudden quench the emissions. fabricated out of mild steel. The emissions enier in to the scrubber hair ing high- pressure »ater spray, there h*’ en\rained particulate matier is vashed don\"n ith ^ attr ith the removal of soluble emissions and also helping in the reduction of ihe Emiss ion temperature. This sj stem is proc ided u\"irhin built RFP masons \*ater storage cum circulaticin Tank. fiecessan po erful central Pump tor 0irculatic\"n of water a ill be proided H\"ith Pipe! ine |
| 12 | Demol ishiny nt” Uamayed Chim ne› . Gasi fier Limit. Secrubber Limit. \"’Line and C remation hambcr etc… |
| 13 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |