| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. |
| 2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 4 | Brick work with 1st class bricks in cement mortar (1:4) in ground floor. (consider 3rd corrigenda & Addenda page -1, SL-3) |
| 5 | Labour for hoisting and placing in proper position (up to 1st floor level) departmental R.S. joists, channels, angles. Tees, plates etc. including fitting and fixing same with bolts and nuts, if necessary (but excluding cost of such bolts and nuts) (a) Add extra for each additional floor over 1st floor. |
| 6 | Hire and labour charges for shuttering with centering and necessary staging… (a) 25 mm to 30 mm thick wooden shuttering |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures..(a) For works in foundation and upto roof of ground floor, (i) Tor steel/Mild Steel, (II). Other than SAIL/ TATA/RINL.(2nd Corrigenda & Addenda Page-02, SL-1) |
| 8 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering... (As per Rate Analysis) |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar.. (ii) With 1:4 cement mortar, (a) 20 mm thick plaster. (3rd Corrigenda & Addenda Page-50, SL-1) |
| 10 | Neat cement punning 1.5mm thick |
| 11 | Making one set of scaffolding.(a) up to hight 3.9m |
| 12 | Making one set of scaffolding b) Extra for additional 3.6 height or part thereof |
| 13 | MS structural work in columns beams etc with simple rolled structure members…i) for structural member of specified section weight less than 22.5kg/m (Consider 3rd Corrigenda & Addenda, P-84, SL-01) |
| 14 | Welding in M.S. structural work with gas or electric: (a) Tack weld |
| 15 | Welding in M.S. structural work with gas or electric: (b) Continuous weld. |
| 16 | Priming one coat On steel or other metal surface: |
| 17 | Painting one coat (b) On steel or other metal surface, other than hi-gloss, (iv) Two coats (with any shade except white) |
| 18 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. In Ground Floor: (a) One Coat |
| 19 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat) (a) Normal Acrylic Emulsion |
| 20 | Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (h) 5000 litre capacity |