| 1 | Civil works |
| 2 | Excavation of 9m, 9.14m pole pit on Rocky ground (Hard soil) (1.25m * 0.6m*1.83m) |
| 3 | Erection of 9m, 9.14m pole |
| 4 | Loading and Unloading of 9m PSC pole |
| 5 | Transporting of 9m poles from road side to pole pit upto 2 KM |
| 6 | Excavation of 8m pole pit on Rocky ground (Hard soil) (1.25m * 0.5m*1.5m) |
| 7 | Erection of 8m pole |
| 8 | Loading and Unloading of 8m PSC pole |
| 9 | Transporting of 8m poles from road side to pole pit upto 2 KM |
| 10 | Fixing of LT Pin Insulator |
| 11 | Fixing of LT Shackle Insulator |
| 12 | Fixing of Aluminium Knob |
| 13 | Fixing of LT Three phase cross arm |
| 14 | Fixing of LT Single phase cross arm |
| 15 | Fixing of V cross arm 3 1/2\" |
| 16 | Dismantling & Re- Fixing of LT Pin Insulator |
| 17 | Dismantling & Re- Fixing of LT shackle insulator |
| 18 | Dismantling & Re- Fixing of Aluminium Knob |
| 19 | Dismantling & Re- Fixing of HT Pin Insulator |
| 20 | Dismantling & Re- Fixing of 11 KV Disc |
| 21 | Dismantling & Re- Fixing of V cross arm 3 1/2\" |
| 22 | Dismantling & Re- Fixing of HT/LT TI fitting |
| 23 | Dismantling & Re- Fixing of LT Single phase cross arm |
| 24 | Dismantling & Re- Fixing of LT Three phase cross arm |
| 25 | Excavation of Stay pit on Rocky ground (Hard soil) (1.00m * 0.5m*1.5m) |
| 26 | Erection of Stay set |
| 27 | Dismantling & Re-Erection of Stay Set |
| 28 | Dismantling & Re-Erection of Single Phase Service Connection |
| 29 | Erection of LT Lines Stringing, Sagging, Binding for 7/3.35 ACSR & 7/3.15 AAAC Pin point |
| 30 | Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Pin point |
| 31 | Dismantling & Re-Erection of LT Lines Stringing, Sagging, Binding for 7/3.35 ACSR & 7/3.15 AAAC Pin point |
| 32 | Dismantling & Re-Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Cut point |
| 33 | Annexure – II (Erection of Double pole Transformer structure) |
| 34 | Dismantling of Double pole Transformer structure |
| 35 | Loading & Unloading of line materials |
| 36 | Transporting of line materials from section office to work Spot up to 20 KM |
| 37 | Drilling / Less than 23mm holes per hole / slotted holes |
| 38 | For Ordinary. Tree clearance in HT or LT and Throne bushes & trees Please Enable Macros to View BoQ information |