|
| 1 | Dismantling and removing AC sheet/ Aluminum sheet side cladding at all heights using proper tools and plants without damaging the adjacent structures, lowering carefully and stacking materials useful for reuse at convenient place as directed by the company authorities and depositing the waste materials in the scrap yard including all labour charges, hire charges for tools and plants, loading unloading charges, providing necessary scaffolding etc. complete as per standard specification. |
| 2 | Dismantling and removing steel structures such as MS angles, channels, plates, Beam etc. of columnstrusses, purlin, side cladding, etc. at all heights using proper tools and plants without damaging the adjacent structures Including providing temporary supports for the structure at dismantled portion and nearby structureslowering the dismantled items carefully and staking materialsuseful for reuse at convenient place as directed by the company authorities and depositing the waste materials in the scrap yard including all labour charges, hire charges for tools and plants, loading unloading charges, providing necessary scaffolding etc. complete as per standard specification. |
| 3 | Demolishing concrete in cement mortar and clearing away the debris with in a distance of 150 m etc complete standard specifications and as directed by the Engineer-in-Charge |
| 4 | Brick work in cm 1:6 using first class wire cut bricks of nominal size for super structure up to 5.00 M including all cost and conveyance of materials, socking of brick, curing, necessary scaffolding, all labour charges etc. but excluding cost of cement etc. complete as per standard specification but excluding cost of cement. |
| 5 | ReinforcedCement concrete1:2:4 using20mmhardbrokenstonefor Belt, lintel & beametc. includingcost& conveyanceof all materials hirechargesfor shuttering, labour chargesfor boxing,mixing, placing, ramming, watering, curingetc. complete as perstandard specificationbutexcludingcost of cement & MS reinforcement. |
| 6 | MS reinforcement bent , tied andplacedinpositionfor all RCC worksincludingallcostandconveyanceofMS bars, bindingwires, all labour charges, loading/ unloading charges etc. completeas per standard specification. |
| 7 | Cleaning removal of old plastering walls including raking out joints and clearing the surface and after Plastering with cm 1:4, 15mm thick one coat at all heights and levels floated hard and trowelled smooth with neat cement flushing coat including all cost and conveyance of materials and labour charges, providing necessary scaffolding, watering and curing etc complete as per standard specification but excluding cost of cement. |
| 8 | Supplying and stacking ISI mark best quality portland cement (OPC/PPC) approved make including all cost and conveyance of materials, loading and unloading charges etc. complete (Payment will be made only for actual quantity ofcement consumed). |
| 9 | Painting the Inside/outside walls of replastering compound wall with Acrylic exterior paint of approved quality and colour (Asian/Berger/ICI make) two coats over the one coat of white cement coating & one coat water based approved quality exterior wall putty after cleaning the surface at all heights and levels including all cost and conveyance of materials, all labour charges, hire charges for tools and plants, scaffolding charges, etc. complete as per standard specification. |
| 10 | Glass coping with glass chips in in cm 1:4,at all heights and levelsincluding all cost and conveyance of materials and labour charges, providing necessary scaffolding, watering and curing etc complete as per standard specification but excluding cost of cement. |
| 11 | Supplying & fixing Anjili wood planed and framed work for frames size of 12x6cm and Full covering with2 mm thick aluminium plain sheetof Gate shutter etc. at all heights using well-seasonedanjili wood ,Nuts and bolts, gate clamp and locking system etc including all cost and conveyance of all materials, hold fast, screws etc. loading and unloading charges, all labour charges for fixing in position etc. complete as per standard specification |
| 12 | Sundry & Petty works such brick workssuch as dismantling of existing fencing Mason |
| 13 | Sundry & Petty works such brick works such as dismantling of existing fencing Man mazdoor |