Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Periodical maintenance of DG set as per manufacturer recommendation of the following DG sets installed at various location and various capacity complete all as specified and directed.Note:- (a)Checking the fanbelt , Fuel , Oil filter, Air Filter, FIP Performance,FIP Oillevel, Tappet Clearance, adjustment of fuel pump timing, tighting of base bolt nuts, battery distilled water level, vibration damper mounting, radiator, radiator hose, panel board cable connection tighting etc.,(b)Service engineer report from authorised dealer shall be submitted for every check about the performance and maintenance of DG Sets(c)Highly skilled labours and tools for maintenance/checks repairs/replacement is deemed to be included in the rate quoated by the contractor(d)Replacement of spares , Coolant,Distilled water , Engine Oil, Fuel/Oil/Air filtershallbe measured under relevant items & Minor spares parts include in this item of nature(e) Mechanic , Supervisor and Maintenance Engineer must be skilled and must have knowledge of maintenance of DG Sets and attending minor and Major fault when it arise. |
| 2 | DG set400 KVA Capacity |
| 3 | DG set250/200 KVA Capacity |
| 4 | DG set125/160 KVA Capacity |
| 5 | DG set 90/63/62.5/60/40 KVA Capacity |
| 6 | DG set30/2012.5/7.5 KVA Capacity |
| 7 | Disconnecting, removing and dismantling radiator assembly from the following capacity DG sets and descaling the radiator throughly with CTC solution/any other chemical solvent agent as approved by the Engineer-in-Charge, stopping of leakeage at place to copper cores and tubes by brazing scapping the existing Oil paint, dusting and painting the radiator with enamelled paint etc re-installing and commissioning complete all as specified and directed. |
| 8 | 7.5/12.5/20/30 KVA Capacity Genset |
| 9 | 40 /60/62.5/90 KVA Capacity Genset |
| 10 | Disconecting the existing battery of capacity12V 92/100AH from the DG Set, taking it to battery workshop, draining out the complete unserviceable sulphuric acid from the battery, filling up with new sulphuric acid to the required level, charging the battery, testing the battery for correct specific gravity, bringing back to the location, connecting to DG Set, start the engine for satisfactory function complete all as specified and directed. |
| 11 | All as per item No.3 above but 12V,180AH |
| 12 | M&L for replacing the worn out carbon brushes slipring type in alternator of 7.5/20/30 KVA capacityDG set including all necessary connected works complete all as specified and directed. |
| 13 | All as per item No. 5 above but 60 to 90 KVA Capacity Genset complete all as specified and directed. |
| 14 | Draining out the existing diesel from the tank from thefollowing capacity DG Set , kept as side for repouring, taking down the complete fuel tank of any capacityfrom its position after disconnecting all the fuel lines, carryout cleaning work with solutions, removing the dust and foreign materials from the tank, drying the tank, blow with air painting and carry out recaliberation of diesel tank to the specified levelincludingreplacement of PVC level pipe, refix the tank in its original position, connecting all the removed fuel connections, refilling the kept diesel back to the tank carefully, remove air from the fuel connections, start the engine and test for satisfactory function complete all as specified and directed. |
| 15 | 7.5/12.5/20/30 KVA Capacity Genset |
| 16 | 40/60/63/90 KVA Capacity Genset |
| 17 | 125 KVA Capacity Genset |
| 18 | M&L for removing and replacingof defective AVR from Alternator upto 90 KVA DG setscomplete all as specified and directed. |
| 19 | All as per itemNo. 8 above but Alternator capacity 125/160 KVA Capacity complete all as specified and directed. |
| 20 | All as per itemNo. 8 above but Alternator capacity 200 to 400 KVA Capacity complete all as specified and directed. |
| 21 | Servicing to DG Set ControlPanelsCleaning with blower, Cleaning with CTC ,Replacement of damaged lugs , Replacement of deteriorated copper wiring ,check the power contactors , Rectifying of loose connections , removing contactors and cleaning the points, refixing it in its original position complete complete all as specified and directed.Note:spares shall be measured and paid under respective item of BOQ as supply only. |
| 22 | Supply only selecter switch as per sample |
| 23 | Supply only ON/Off Push button |
| 24 | Supply only oil temperature gauge alongwith all connected items as per existing sample/ specification. |
| 25 | Supply only water temperature gauge alongwith connected items as per existing sample/ specification. |
| 26 | Supply only volt Meter as per existing size with connected items as per existing sample/ specification. |
| 27 | Supply only ammeter as per existing size with connected items as per existing sample/ specification. |
| 28 | Supply only DC Volt meter as per existing size with connected items as per existing sample/ specification. |
| 29 | Supply only DC Ammeter as per existing size with connected itemsas per existing sample/ specification. |
| 30 | Supply only frequency meter as per existing size with connected items as per existing sample/ specification. |
| 31 | Supply only digital type Hours meter with accessories as per existing sample/ specification. |
| 32 | Supply only LED indicator lamps as per existing sample/ specification. |
| 33 | Supply only fuse along with back light fuse carries as per existing sample/ specification. |
| 34 | Supply only oil Flexible Hose as per existing sample/ specification. |
| 35 | Supply only Diesel Flexible hose as per existing sample/ specification. |
| 36 | Supply only Ignition key alongwithbush button starter as per existing sample/ specification. |
| 37 | M&L for replacing the old unserviceable battery lead with copper terminals approximately 2.5 mtr length including applying jelly over the battery pole and terminals complete all as specified and directed. |
| 38 | M&L for replacing the old unserviceable battery Terminals ( Positive & Negative ) including brazing work andapplying jelly over the battery pole and terminals complete all as specified and directed. |
| 39 | Supply and fix in replacement ofthe following spares during repairs complete all as specified and directed :- |
| 40 | Oil filter capacity 1/2 litre with \"O\" ring |
| 41 | Oil filter capacity 1 litre with \"O\" ring |
| 42 | Diesel filter capacity 1/2 litre with\"O\" ring ( Pre & Micro) |
| 43 | Diesel filter capacity 1 litre with \"O\" ring ( Pre & Micro) |
| 44 | Sump/Crank case packing suitable for7.5/20/30 KVA Capacity Genset |
| 45 | Sump/Crank case packing suitable for40/62.5 KVA Capacity Genset |
| 46 | Sump/Crank case packing suitable for125 KVA Capacity Genset |
| 47 | Air filter suitable for 7.5/12.5/20/30 KVA Capacity Genset |
| 48 | Air filter suitable for 40/93/62.5/60 KVA Capacity Genset |
| 49 | Air filter suitable for125 KVA Capacity Genset |
| 50 | Rocker arm packing kit suitable for 7.5/20/30 KVA Capacity Genset |
| 51 | Rocker arm packing kitfor 40/60/62.5 KVA Capacity Genset |
| 52 | Rocker arm packing kit 125 KVA Capacity Genset |
| 53 | Engine Oill 15W-40 Make : Castrol/BP |
| 54 | Distilled water |
| 55 | Broom made by Cocount trees branches along with bamboo stick as per sample |
| 56 | Battery 12 V 180 Ah suitable for Diesel Generating set as per existing specification. |
| 57 | Battery 12 V 100 Ah suitable for Diesel Generating set as per existing specification. |
| 58 | M&Lfor replacing the existing damaged/bulged radiator flexible rubber hose for the following capacity DG sets installed at various installation and replaced with new radiator flexible hose with circular hose clips complete all as specified and directed. |
| 59 | 7.5/12.5/20/30 KVA Capacity Genset |
| 60 | 40/60/63/62.5 KVA Capacity Genset |
| 61 | 90/125 KVA Capacity Genset |
| 62 | 160/250/400 KVA Capacity Genset |
| 63 | Taking down theexisting worn out Fanbelt (V Belt) for the following capacity installed at various installation and replaced with new fan belt complete all as specified and directed. |
| 64 | 7.5/12.5/20/30 KVA Capacity Genset |
| 65 | 40/60/62.5/63 KVA Capacity Genset |
| 66 | 90/125KVA Capacity Genset |
| 67 | 160/250/400 KVA Capacity Genset |
| 68 | Taking down the existing defective radiator cap from the Radiator and replaced new radiator cap complete all as specified and directed. |
| 69 | Replacement of flame proof asbestos rope of specified dia wrapped around the exhaust pipe complete all as specified and directed. |
| 70 | Attending of urgent complaints in any breakdown of standby DG sets upto 400 KVA and EOT Cranes at any locationunder GE Saugor, whenever required round the clock, rectify the fault and restore the standby supply within one hour after receipt of the complaint, complete all as specified and directed.Note :- (i) The cost of all kind of replaced defective parts / spares / control cards / oil / lubricants etc, as and when required to making the DG Set and EOT Cranes fully functional, will be measured and paid seperately under respective items only. (ii) The cost of all kind of minor parts / spares, other than mentioned in BOQ, as and when required to making the DG Set/EOT Cranes fully functional, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. (iii) If complaint is not attended by the contractor within two hour the penality as applicable shall be impossed on him. (iv) Contractor shall intimate the name of qualified machanic/ electrician and helpers those will attend the urgent breakdown. (v) All kind of transportation (to and fro) for all kind of necessary equipment/T&P shall be arranged/brought by contractor to complete the job at site or at workshop and no extra cost shall be paid to the contractor in this effect. (vi) Complaints shall be lodged telephonically, so contractor has to give the telephone number of person who will receive the complaint round the clock.Normal defect rectification such as relay settings , loose wirings , oiling / greasing , sensor based settings included in this work . No separate cost will be paid against minor defect rectification. |
| 71 | Repair, maint and making the fully functioning ofelectric operated crane of cap 2 Ton to 4 tonafter checking long travell motion , cross travel motion , hoisting motion (electrically and mechanically)in presence of user rep and MES rep & rectify any type of defects immediately when found including servicing, greasing, top up gear box oil & carrying out routine maintenance complete all as specified and directed.Note :- (i) any accessories found unserviceable that shall be replaced under respective items of this Sch. (ii) : Labor for lowering, mounting arrangement such as ladder , pulley block, rope system, T&P , any type nut, bolt, washers and other connected mechanism shall be contractor arrangement and rates are deemed to be included in this Job. No extra payment will be made to the contractor against lowering/lifting the spare etc at a height of 20\" to 30\" (iii) Repair/maint of each flame proof EOT crane of capacity 2 to 4 Ton for one times or as per complaint of EOT cranes in a month. |
| 72 | Dismantling the main driving shaft of forward/reverse drive ofEOT crane after unscrewing nuts, bolts, washers including other connected accessories with shaft such as breaking assembly, coupling, bearings rings, gear box lowering down the smaller portion of shaft from up to 30\" approximate height for removing and threading, repairing manufacturing cutting teeth keys one Nos bearing housing cabinet and replacement of one Nos tapper bearing welding of foundation rest pad making drills holes in rest pads matching with main foundation of trolly, cleaning, greasing and oiling of all the bearing, bearing housing, gear box etc complete for smooth functioning including providing nut, bolts with locking arrangement & washers of any type/size as site requirement complete including re-assembly with connected accessories after repair including carrying out necessary alignment of all the parts connected with shaft complete all as specified and directed. (Capacity of crane - 2to 4 Ton ) |
| 73 | Dismantlingof micro -up and down drive arrangement ofEOT crane after un-screwingL- key bolts/screwsnuts, washers etc which includes gear box of micro drive main box of up -down drive, braking arrangements including dismantling of 3 set (3 pair) of micro coupling, micro-drive arrangement for under taking repair including getting down all as dismantled parts from existing platform at a minimum height about 20\" to 30\" approximately reassembling and re alignment all the parts complete including testing on load on both micro and main drive complete all as specified and directed. (capacity of Crane 2 to 4 Ton ) |
| 74 | Dismantling/strip opening gear of micro main shaft drive for replacement of 2 Nos gun metal bushes having internal lining for oiling arrangement, replacement of all the nuts/bolts of bush side plate with L-key, bolts of size as per sample oiling/greasing of gear box including necessary cast iron repair to broken foundation which includes welding lathing and grinding complete all as specified and directed by Engineer -in-charge. (Crane capacity2 to 4Ton ) |
| 75 | Dismantling and refixing after repair brake shoe leather suitable any motion ofEOT crane 2 to 4 ton cap complete all as specified and directed. |
| 76 | Dismantling/strip openingmicro drive box complete with rectifier transformer arrangement, magnetic disc both side coupling for remotting both the side ends of driving shaft (Gear box coupling side and braking arrangement coupling side) making multi key arrangementon both the shaft and couplings (teeth system ) to avoid any kind of play in coupling and shaft including replacement of 4 Nos carbon bushes, replacement of 02 Nos gun metal bushes including making oiling arrangement in bushes and side covers of bushes/housing of micro drive re-assembling/testing complete (crane capacity up to 4 Ton) complete all as specified and directed. |
| 77 | Dismantling/strip opening of up/down micro electric braking arrangement after un-screwing nuts, bolts washers, re-adjustment of braking springs, replacement of brake leathers, replacement of two Nos 440 volts any make brake coils, replacement of both gun metal bushes of shaft housing in brake box making oiling/greasing arrangement complete re-assembling and testing complete all as specified and directed. (Crane capacity 2 to 4 Ton ) |
| 78 | M&L for replacement of coupling as per sample or approved by GE suitable for perfect alignment betweenmotor and driven machine complete all as specified and directed. |
| 79 | M&L for replacement of L Key bolts 1\" x 10mm as per sample or approved by GE including applying moose threads found worn out and taking out broken bolts from body/housing of machine for 2 to 4 ton capacityEOT Crane complete all as specified and directed. |
| 80 | M & L for of Over load relay 1.7 to 2.4 Amp as per sample or approved by GE complete all as specified and directed. |
| 81 | M & L for of main bearing as per site requirment suitable for 2 to 4 Ton cap crane complete all as specified and directed. |
| 82 | Supply and fix in replacement of left hand/ right hand hinge suitable for acoustic enclosure doors for DG set of capacity up to 125 KVA including removing of existing broken hinge complete all as specified and directed. |
| 83 | Supply and fix in replacement of left hand/ right hand lock with catcher suitable for locking doors of acoustic enclosure for DG set of capacity up to 125 KVAincluding removing of existing unserviceable lock complete all as specified and directed. |
| 84 | Taking down theexistingdefective injector and fuel injection pump (FIP)for the following capacity DG Setinstalled at various installation and replacement of work out spares like delivery valves, Nozzles, bearings, fly weight, packing kit,and copper washer kit and recalibration of FIP and refixing in same position and testing of full load checking of pressurecomplete all as specified and directed. |
| 85 | 7.5/20/30 KVA Capacity Genset |
| 86 | 40/62.5/90 KVA Capacity Genset |
| 87 | 125/160/200KVA Capacity Genset |
| 88 | Taking down theexistingdefective self starter from Genset12 V Capacityinstalled at various installation and replacement of work out spares like Bendex drive, carbon brush , solinoid coil, Armature including rewinding stator, refixing in same position and testing complete all as specified and directed. |
| 89 | All as per item No. 49 above but 24V capacity |
| 90 | Taking down theexistingdefective Alternator/Dynamo from Genset12 V Capacityinstalled at various installation and replacement of work out spares like armature, carbon brush,diode, wiring thealternator anddynamo refixing in same position and testingcomplete all as specified and directed. |
| 91 | All as per item No. 51 above but 24V capacity |
| 92 | M&L for execavat soil up to 5cm root of the vegetation cutting removing completelyby spade and surface dressing all around theallDG Setinstallationarea to keep the installation area(external only) clean and tidy complete all as specified and directed.NOTE:- All the installation shall be kept clean through out the contract period by repeatedly removing the grasses/trees/weads as many times as required depending on the growth of the grass.This item shall be measured and paid only separately |
| 93 | S&F in repair fabricated and polishing stainless stell board stand of frame of size SS heavy pipe 50 mm dia pipe work for fixing \"ACP\" Sign board (Aluminium compost panel) of size 1.6mx1.3, m mm thick with inthe SS frame of sizeSS heavy pipe 20 mm dia pipe work andSS bsll of dia not less than 50 mm on SS stand including writing details of installations/Machinery details etc with both sive vinylpasting on radium stricker letters including taking out old rusted sign board from existing locations complete all as specified and directed.Note:Letters and size of letters as approved by GE. |
| 94 | S&F in repair acrylic LED glow sign board for E/M installations with computerised words printed in PVC board including fabrication work, angle iron, electrical connection with suitable copper wires and LED fittings complete all as specified and directed.Note:Matter and size of letters as approved by GE. |
| 95 | Taking down the existing UNSV Radiator and supply & Fix new radiator as per existing size, model and specification for the following capacity genset. |
| 96 | 90/63/62.5 KVA Capacity Genset |
| 97 | 40/30 KVA Capacity Genset |
| 98 | 20/12.5/7.5 KVA Capacity Genset |
| 99 | Comprehensive maint with material and servicing ofthe Vehicle BA .No. 19B-132102 E (Maruti Dzire) (Staff Car) ,Checking the serviceabilityof thevehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping of coolant,brake oil, steering oil, engine oil,gear box and differential oil, cleaning and maint of radiators including leakeage arresting and AirFilter/Air Cleaner, maint of battery with electrolyte solution, distilled water, wheel alingnement, Change of Wheel Greasing, Greasing ofall mechanical moving parts,Checking of the Battery Charging system, replacement/providing of theCotton waste, Micro fiber cloth, Cleaning brush, Vehicle body polishing as required, Engine oil and requirement of the vehicle complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 100 | Comprehensive maint with material and servicing ofthe TATA Xenon pick up van vehicles,Transporting to Authorized TATA Service centre/Delar Checking the serviceabilityof thevehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping of coolant, brake oil,, engine oil, cleaning and maint of radiators and AirFilter/Air Cleaner, maint of battery with electrolyte solution, distilled water, wheel alingnment, Change of Wheel Greasing, Greasing ofall mechanical moving parts,Checking of the Battery Charging system, replacement/providing of the Cotton waste, Micro fiber cloth, Cleaning brush entire contract period andas per manufacturer recommendation and requirementof the followingTATA Mobiles/Zenon pick up van vehicles complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 101 | Vehicel BA.No. 19C-108107E |
| 102 | Vehicel BA.No. 21C-109052 N |
| 103 | Comprehensive maint with material and servicing ofthe Vehicle BA.No. 11A-62541W (Make:- Hero Honda Spl +)Checking the serviceabilityof thevehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping ofEngine oil and AirFilter/Air Cleaner, maint of battery with electrolyte solution, distilled water, Checking of the Battery Charging system, , Cotton waste,as required andrequirementof the vehicleonce in contract period complete all as specified and directed. Note:- Replacement of spares if requiredother than mentioned in above will be measurd and paid separately under revelant item below. |
| 104 | Comprehensive maint with material and servicing ofthe Vehicle BA.No. 20A-074347Y (Make:- Hero Delux)Checking the serviceabilityof thevehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping ofEngine oil and AirFilter/Air Cleaner, maint of battery with electrolyte solution, distilled water, Checking of the Battery Charging system, , Cotton waste,as required andrequirementof the vehicleonce in contract period complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 105 | Supply only following items required for repair of Vehicle BA.No. 11A-62541W (Make:- Hero Honda Spl +) and Vehicel BA.No. 20A-074347Y (Make:- Hero Delux)as per original manufacture complete all as specified and directed. Note:- Make of materials shall be provided of same make as per manufacturer. |
| 106 | Engine oil 4T 10W50 |
| 107 | Oil Filter/Fuel Filter |
| 108 | Air Filter |
| 109 | Indicator (Front & Rear) |
| 110 | Headlight LED Bulb |
| 111 | Front Headlight Dome |
| 112 | Clutch Plate |
| 113 | Accelerator cable |
| 114 | Spark plug |
| 115 | Break Shoe Front |
| 116 | Break Shoe Back |
| 117 | Comprehensive maint with material and servicing ofthe following motor cycle (Make:- Bajaj Platina) Checking the serviceabilityof thevehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping ofEngine oil and AirFilter/Air Cleaner, maint of battery with electrolyte solution, distilled water, Checking of the Battery Charging system, , Cotton waste, as required andrequirementof the vehicle once in contract period complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 118 | BA.NO. 22A-076493A |
| 119 | BA.NO. 22A-076494 X |
| 120 | BA.NO. 22A-076495 P |
| 121 | BA NO.23A-077093A |
| 122 | BA NO.23A-077092H |
| 123 | Supply only following items required for repair of Vehicle BA.NO. 22A-076493A, BA.NO. 22A-076494 X, BA.NO. 22A-076495 P, BA NO.23A-077093A & BA NO.23A-077092H (Make:- Bajaj Platina) as per original manufacture complete all as specified and directed. Note:- Make of materials shall be provided of same make as per manufacturer. |
| 124 | Engine oil 4T 10W50 |
| 125 | Oil Filter/Fuel Filter |
| 126 | Air Filter |
| 127 | Indicator (Front & Rear) |
| 128 | Headlight LED Bulb |
| 129 | Battery12v 5Ah |
| 130 | Front Headlight Dome |
| 131 | Clutch Plate |
| 132 | Accelerator cable |
| 133 | Spark plug |
| 134 | Break Shoe Front |
| 135 | Break Shoe Back |
| 136 | Comprehensive maint with material and servicing ofthe Car Washing plant installed at GE Saugor MTyard, Checking the serviceabilityof theplant oiling, testing of motor and belt, connecting wires and control starterreplacement of belts, connecting wires as per manufacturer recommendation parts changing of car washing plant gun metal bushes, pressure gauge, connecting hose clips, gunmetal nozzles entire contract period andas per manufacturer recommendation and requirement of the car washing plant complete all as specified and directed. |
| 137 | Taking out front and back side seat cover of vehicle (Tata Xenon) and replace with new seat cover stitching the worn out seat by filling seat materials of good quality and refixing the new one to their proper place neatly complete all as specified and directed. Note:- materials required for fixing shall be deemed to be inlcuded in quoted unit rate. |
| 138 | All as per item No. 65 above but seat cover of vehicle (Maruti Dzire Staff car) |
| 139 | Removing wheel complete with tyre and tube, taking out tube repair, puncher of tube of vehicles Tata Xenon/staff car and refixing properly complete all as specified and directed. |
| 140 | Removing of fronth seat complete, taking out seat locking mechanism and S&F new seat locking mechanism of vehicles (Tata Xenon) properly complete all as specified and directed. |
| 141 | S&F in repair Tata Xenon windshild washer reservoir parts complete all as specified and directed. |
| 142 | M&L for dentingdamage portion of vehicle including touching, welding, matching with existingpainting with the same color of any type vehicle complete all as specified and directed. |
| 143 | Taking out seat cover of two wheeler and replace the new seat coverandworn out foam by filling seat materials of good quality and refixing the new one to their proper place neatly as directed including all material use for fixing complete all as specified and directed. |
| 144 | Disconecting the existing battery of capacity12V 70AH from the Vehicle, taking it to battery workshop, draining out the complete unserviceable sulphuric acid from the battery, filling up with new sulphuric acid to the required level, charging the battery, testing the battery for correct specific gravity, bringing back to the location, connecting to Vehicle for satisfactory function complete all as specified and directed. |
| 145 | Supply only following items required for repair of Vehicle as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 146 | Battery Terminals(Positive & Negative) |
| 147 | Battery Cables as per existing size and aspersample |
| 148 | Car perfume as per requirement of flavour |
| 149 | Vehicle cleaning liquid |
| 150 | Wiper blade suitble for TATA Xenon/Maruti Dzire Vehicle |
| 151 | Engine oil 20w 40 / 10w 30 |
| 152 | DEF for Diesel Engine |
| 153 | Brake fluid |
| 154 | steering oil |
| 155 | Cleaning liquid for glass |
| 156 | Side Mirror suitable for Tata Xenon vehicle (Left and Right Side) |
| 157 | Vehicle cleaning cloth (Microfibre type) |
| 158 | Ignition Key set alongwith electrical control devices suitable for TATA Xenon vehicle any model |
| 159 | Battery 12v 80 AH, Make : Exidexpress/Amoran/Kirlosakar |
| 160 | Side mirror (Left & Right) suitable existing two wheeler as per existing model and size |
| 161 | SS Letter box suitable for existing two wheeler as per per existing model and size complete |
| 162 | Ignition key alongwith fork lock as per sample and existing model |
| 163 | Taking down theexistingdefective Self starter from Staff Car Maruti Dzire and replacement of work out spares like Bendex drive, carbon brush , solinoid coil,Armature including rewinding stator, refixing in same position and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 164 | Supply only following items required for repair of defective Self starter from Staff Car Maruti Dzire as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 165 | Bendex drive assy |
| 166 | Armature Coil |
| 167 | Field Coil |
| 168 | Carbon brush with holder |
| 169 | Connector with cable |
| 170 | Bush Bearing |
| 171 | Taking down theexistingdefective Self starter from TATA Xenon pick up Vehicle and replacement of work out spares like Bendex drive, carbon brush , solinoid coil,Armature including rewinding stator, refixing in same position and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 172 | Supply only following items required for repair of defective Self starter from TATA Xenon pick up Vehicle as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 173 | Bendex drive assy |
| 174 | Armature Coil |
| 175 | Field Coil |
| 176 | Carbon brush with holder |
| 177 | Connector with cable |
| 178 | Bush Bearing |
| 179 | Taking down theexistingdefective Alternatorfrom TATA Xenon pick up Vehicle and replacement of work out spares like Rotor Coil, Field coil, Rectifier,Electronic regulator with Carbon brush with Holder, refixing in same position and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 180 | Supply only following items required for repair of defective Alternatorfrom TATA Xenon pick up as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 181 | Armature Coil |
| 182 | Commutator |
| 183 | Carbon brush with holder |
| 184 | Cutout regulator |
| 185 | Connector with cable |
| 186 | Dismantling and taking down TATA Xenon pick upvehicle defective clutch system and repair/replacement of worn-out spare and refixing, testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 187 | Supply only following items required for repair of defective clutch system of TATA Xenon pick up as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 188 | Clutch plate |
| 189 | Pressure plate with springs |
| 190 | Clutch cylinder |
| 191 | Sleeve cylinder |
| 192 | Release Bearing |
| 193 | Bush Bearing |
| 194 | Release Bearing lever along with spring |
| 195 | Repair and overhauling ofTATA Xenon pick up Vehicledefective brake system and checking of parts such as wheel cylinder, master cylinder, wheel brake shoe, wheel brake spring system and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 196 | Supply only following items required for repair of defective brake system of TATA Xenon pick up as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 197 | Wheel cylinder front right |
| 198 | Wheel cylinder front left |
| 199 | Wheel cylinder rear right |
| 200 | Wheel cylinder rear left |
| 201 | Master cylinder |
| 202 | Brake shoe |
| 203 | Brake shoe spring & locking assembly |
| 204 | Repair and overhauling of TATA Xenon pick up Vehicle defective suspension system and checking of parts such as shock absorber, front spring leaf, centre bolt, front spring leaf hanger, front spring leaf, shackle pin, rear spring leaf, rear spring leaf hanger, rear shackle pin complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 205 | Supply only following items required for repair of defective suspension system of TATA Xenon pick up as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 206 | Shock absorber bush |
| 207 | Shock absorber Front & Rear |
| 208 | Upper link |
| 209 | Lower link |
| 210 | Ball joint |
| 211 | Hanger |
| 212 | Jula |
| 213 | Shackle pin |
| 214 | Centre bolt |
| 215 | UJ Cross |
| 216 | Tie rod end |
| 217 | Spring Leaf |
| 218 | Shackle plate with pin |
| 219 | Centre bearing |
| 220 | Centre bearing rubber |
| 221 | Centre bearing clamp |
| 222 | Yeok & teeth |
| 223 | Taking down theexistingdefective fuel injection pump (FIP) alongwith injector for the TATA Xenon pick up vehicle engine and replacement of work out spares like delivery valves, Nozzles, bearings, fly weight, packing kit,and copper washer kit and recalibration of FIP alongwith governer and refixing in same position and testing of full load checking of pressure and checking the solinoid coilcomplete all as specified and directed. |
| 224 | Dismantling and taking down the gear box of TATA Xenon pick up vehicle repair and overhauling including replacement of worn spare parts and refixing the same in original position and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 225 | Supply only following items required for repair of defective gear box of TATA Xenon pick up as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 226 | Gear liver kit |
| 227 | Synchronizer(1th to 4th gear) |
| 228 | Gear reverse pinion |
| 229 | Gear pinion Ist, 2nd, 3rd & 4th and 5 |
| 230 | Counter |
| 231 | Repair and overhauling ofMaruti Dzire staff car Vehicledefective brake system and checking of parts such as wheel cylinder, master cylinder, wheel brake shoe, wheel brake spring system and testing complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 232 | Supply only following items required for repair of Maruti Dzire staff car Vehicle as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 233 | Wheel cylinder front right |
| 234 | Wheel cylinder front left |
| 235 | Wheel cylinder rear right |
| 236 | Wheel cylinder rear left |
| 237 | Master cylinder |
| 238 | Brake shoe |
| 239 | Brake shoe spring & locking assembly |
| 240 | Repair and overhauling of StaffCar Maruti Dzire Vehicle defective suspension system and checking of partsof all Suspension system complete all as specified and directed. Note:- Spare Parts & Materials required for smooth functioning of vehicle other than mentioned here-in-after shall deemed to be included in quote rate. |
| 241 | Supply only following items required for repair of defective suspension system of Maruti Dzire Vehicle as per original manufacture complete all as specified and directed. Note: Make of materials shall be provided of same make as per manufacturer. |
| 242 | Shock absorber bush |
| 243 | Shock absorber Front & Rear |
| 244 | Upper link |
| 245 | Lower link |
| 246 | Ball joint |
| 247 | Hanger |
| 248 | Jula |
| 249 | Shackle pin |
| 250 | Centre bolt |
| 251 | UJ Cross |
| 252 | Tie rod end |
| 253 | Spring Leaf |
| 254 | Shackle plate with pin |
| 255 | Centre bearing |
| 256 | Centre bearing rubber |
| 257 | Centre bearing clamp |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail