| 1 | Making of barcating of site with Bans, Balli, Rassi all complete work . |
| 2 | Dismantling of CC road surface for two layer and Temperary Re statement. |
| 3 | Excavation for Pipe line in ordinary soil (Loam, clay, sand) with lift up 1.5mtr. And lead up to 50mtr. Including refilling and ramming of excavated earth. |
| 4 | Supply of 250mm Rcc Hume pipe NP-3 |
| 5 | Supply of 200mm Rcc Hume pipe NP-3 |
| 6 | Provide and fix open timbering (covering naccesary surface arca by plank in trenches for the following depths below G.L. consisting of 40mm thick approved country wood plank for poling board 125x75mm Indian Sal wood wallers and 100mm diameter Sal wood ballies for shuttering at 1.50m c/c including removal after laying will be taken as one side for the purpose of payment and measurement i.c. arca equals to length x depth of trenches, dismantled timbering material will be the property of the contractor. Details of cost for 30m and 3 m deep trench i.e. 90m2 areas of timbering. |
| 7 | Laying & jointing of 250mm Rcc Hume Pipe NP-3 with coller |
| 8 | Laying & jointing of 200mm Rcc Hume Pipe NP-3 with coller |
| 9 | Interconnection Sewer line from existing sewer Chamber after laying sewer pipe line Reconstruction of complete charge of fiting. |
| 10 | Providing Bandha in Sewr line Man Hole Chamber From Both Sides including sand, Gunny bag, Rassa, Labour etc. |
| 11 | Excavation in foundation in ordinary soil (loam, clay and sand ) inculuding lift upto 1.5m & lead upto 50m refilling , watering and remming of excavated earth into trenches or into the space between the disposal of surplus earth puto a distance of 50m from the center of foundation trenches. |
| 12 | Constraction of granular sub-base (GSB) etc. ………………. All complete. (as per anlysis) |
| 13 | C.C. Work with cement, coarse sand and 20 mm gauge stone ballast in proportion of 1:2:4 in foundation plinth, beam and column upto plinthn lavel excluding supply of reinforceement and its bending but including its fixing and binding the same with 0.5 mm thick binding wire (to he supplied by the cont.) centering, supply of all materials, labour T&P etc. required for proper completion of the work. column |
| 14 | Ist class brick work in 1:6 cement and local sand mortar in foundation and plinth including supply of all materials, T&P etc. required for proper completion of the work |
| 15 | 12mm thick plaster in outer & inner wall & roof in 1:4 consisting of cement and coarse sand laid in pannels, finished with 3mm floting coat of neat cement or 1:5 cement and marble dust including supply of all material, labour T&P etc, complete. |
| 16 | Supply of 24\"x24\" Rcc m/h cover with frame to site with all complete. |
| 17 | Supply of 12\"x12\" Rcc m/h cover with frame to site with all complete. |
| 18 | C.C for frame fixing in 1:2:4 cement sand mortor and 20mm thick stone ballast all labour T&P Complete. (24\"x24\") |
| 19 | Dewatering of water (8 Hrs x 6Days) |
| 20 | Removal of Bandha From both sides after Commpletion of work including labour T&P etc. |
| 21 | Provision of safety equipments like gas mask, Safety Belt, Head Protectar Etc. Due to depth of Sewer Chamber. (For 10 Days) |
| 22 | Re- estetment of C.C RoadG.S.B |
| 23 | P.C.C (1: 2:4) |
| 24 | Disposal of Malwa (Damaged Pipe old GSB ) to 10 Km Distance. |
| 25 | Unforseen Item. (Electric pole, Electric Cable, Gas Pipe line, Water Pipe and Domestic Connection ) Etc. |
| 26 | GST @18% Please Enable Macros to View BoQ information |