|
| 1 | Supply of 90mm dia PVC Pipe 6kg/cm2 including cartage, loading, unloading. (I.S.I/I.S.O) mark (Tirupati, Kisan, Prince) |
| 2 | Supply of 140mm dia PVC Pipe 6kg/cm2 including cartage, loading, unloading. (I.S.I/I.S.O) mark(Tirupati, Kisan, Prince) |
| 3 | S/F of specials fitting as socket, elbo, Reducer, Tee solvent, etc. for laying, Jointing of PVC Pipe line. |
| 4 | Dismantling of road surface & Stacking at site (labour charges only)BOE/Interlocking Road surface |
| 5 | Dismantling of road surface & Stacking at site (labour charges only)Damar Road suface |
| 6 | Dismantling of road surface & Stacking at site (labour charges only)C.C Road suface |
| 7 | Excavation for Pipe line in ordinary soil (Loam, clay, sand) with lift up 1.5mtr. And lead up to 50mtr. Including refilling and ramming of excavated earth. |
| 8 | Carting laying, jointing, fitting & testing PVC pipe & specials including all etc 90mm 6kg/cm2 PVC pipe. |
| 9 | Carting laying, jointing, fitting & testing PVC pipe & specials including all etc 140mm 6kg/cm2 PVC pipe. |
| 10 | For making inter connection of new laid pipe line with existing main line, complete with supply of required matarial and arrangement such as tee, D Joints, Clamp, solvent, ball, flag notice board etc. completion of work 200mmx110mm . |
| 11 | For making inter connection of new laid pipe line with existing main line, complete with supply of required matarial and arrangement such as tee, D Joints, Clamp, solvent, ball, flag notice board etc. completion of work 110mmx90mm . |
| 12 | For making inter connection of new laid pipe line with existing main line, complete with supply of required matarial and arrangement such as tee, D Joints, Clamp, solvent, ball, flag notice board etc. completion of work110mmx110mm . |
| 13 | Supply of Interlocking Brik Work due to Damaged during Dismentling 10% of 39.00 Sqm 3.90 Sqm, 35 No. brick/Sqm. |
| 14 | G.S.B |
| 15 | Supply of Sand |
| 16 | Relaying of interlocking work |
| 17 | Re- estetment of C.C Road P.C.C (1: 2:4) |
| 18 | 15 mm Shifting Connection with all material Labour T&P Complete work. |
| 19 | Under Crossing the Nala. |
| 20 | Dewatering including All. |
| 21 | Making Baricating of Site by bans including All. |
| 22 | GST @18% Please Enable Macros to View BoQ information |