|
| 1 | Dimmetling of brick works |
| 2 | deduction of Old old bricks |
| 3 | Deduction of brick bats |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 5 | p/andlaying intergral cement bassed |
| 6 | providing and laying flowering tiles |
| 7 | groting and jointts of flowring |
| 8 | m150 Brixck work 1:4 at site |
| 9 | 12 MM plaster |
| 10 | Providing of appling white cement based putty average |
| 11 | finising wall with premiun Acrylice smooth exterrirr paint with Silicone additiuves |
| 12 | P/fixing position phnel bonded bammbood wall cladding at all heightwith plankof size |
| 13 | provding and fixing quality cermic glazed wall tiles e confmring |
| 14 | p/fxing PVC pannel |
| 15 | painting on new window/Iron |
| 16 | P/fixing ISI Marked flush door Shullter conforiming to IS 2202.00 |
| 17 | rcc 1:1.5:3 |
| 18 | MS iron In Rcc work |
| 19 | Supply and Sinage board at site all complete work at site |
| 20 | CMA 5400 confrence Systm With 50 Watts |
| 21 | CMC-5100 chairman unit chairman unit Each |
| 22 | CMD 5200 del unit each unit the chairman Has a talk |
| 23 | Ahuja wall speaker ASX-312BT 30Watts 3-Way |
| 24 | Ahuja 20M profection Speaker on connector |
| 25 | Aahuja Implifiter SSA 106DP |
| 26 | video Confrence Report |
| 27 | Dell insprison Windodw 11 Pro destop Intel 13Th Gen core 17-13700 16 GB 512 GB Wired |
| 28 | 4 K PTZ camera 12x optical Zoom 1080P |
| 29 | Speaker with wireless microhone multi connectivity |
| 30 | sofware of VC system Life time lience |
| 31 | Samsung vision AI 4K ultra HD smart QLEd TV |
| 32 | Job And insttalation charge |
| 33 | Supply of laying of Boss chair |
| 34 | Supply of laying of chair |
| 35 | Electriffication 3 persent |
| 36 | Sainatary fitting 3 persent |
| 37 | Contigenccy fitting 3 persent |
| 38 | Supply and Sinage board at site all complete work at site |
| 39 | Add GST 18 % Please Enable Macros to View BoQ information |