Supply of the following items as per the specification under Scope of Supply 1) Drawing & Dimension Details should be providing with quotation. 2) Pressure test & Manufacturing certificate to be submitted along with material. 3) Delivery within 7 Weeks 4) Items should be Conforming to the MODU 1989 5) Valve Manufacturer must be audited and approved by the American Petroleum Institute (API) Certifying Agency. TPIA will inspect the documents/certificates at TQ stage and shall do the factory/manufacturing inspection during manufacturing and after manufacturing (FAT). 6) Vendor should update the status of material on every 4 weeks after placement of order 7) Vendor shall have supplied ASTM standards Gate Valve to offshore structures or platform or RIG in the past 7 years. Vendor to furnish documents (Past Purchase order copy) supporting the same along with offer
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.