| 1 | 1) Providing Cement Concrete road at Chinna Idayapatty Main Road to Vellai House H/O Kuttathupatty ESTIMATE COST : 10.53 Lakhs |
| 2 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 4 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 5 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 6 | Provision for Bittumennpad |
| 7 | Provision for Name board charges |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package} |
| 9 | 2) Providing Cement Concrete Drainage From Drama Stage to New OHT at Puliyarajakkapatty H/ O Kuttathupatty ESTIMATE COST : 16.7 Lakhs |
| 10 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 11 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 12 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 13 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including all cost,conveyence os all materials to site and all labour charges etc.,complete |
| 14 | Supplying fabricating and placing in position Mild Steel/Ribbed Tor Steel grills for all RCC works as per dwsign given including Cost of Steel and G.I. binding wire in all floors etc., complete complaying with standard specification. (contractor has to make his own arrangements for the supply of steel and binding wire). |
| 15 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 16 | Plastering with cement 1:5 (one cement and five M.Sand), 12mm thick in all floors including curing etc. complete complaying with standard specification and as directed by the departmental officers. |
| 17 | Provision for Name board charges |
| 18 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package} |
| 19 | 03) Construction of 3.0m Span RCC Slab Culvert at Aasari Street Senkurichiyar House Avarampatty H/O Kuttathupatty ESTIMATE COST : 10.00 Lakhs |
| 20 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 21 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 22 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 23 | Above Sill Level |
| 24 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 25 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherev |
| 26 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. |
| 27 | Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm fo |
| 28 | (i) Beloe sill level |
| 29 | (ii)Above sill level |
| 30 | Gravel Filling in Between the Body walls including all cost and conveyance of Gravel, labour for Filling watering and Compacting etc Complete |
| 31 | Providing and fixing 20mm compressible fiber board in expation joint complete as per drawing and MORD technical specification |
| 32 | Providing and fixing TAR paper for bearing between bed block and deck slab |
| 33 | Providing and fixing seepage pipes of 100mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900 mm dia. semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill. |
| 34 | Name board charges |
| 35 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package} |
| 36 | 4)Providing Paver Block Pavement from Drama Stage to Anganwadi Nachakonampatty H/ kuttathupatty ESTIMATE COST : 12.76 Lakhs |
| 37 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 38 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 39 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 40 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 41 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) |
| 42 | Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete |
| 43 | Provision for Name board charges |
| 44 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |