|
| 1 | Servicing of Fan Coil Units (1 to 2 tons) after dismantling from the room and dismantling of entire FCU (Filter section, blower section and coil section). The coil shall be cleaned/ serviced with water jet pressure including cleaning of fins, cooling coils, replacing damaged mounting bush, nuts, and bolts of motor, electric connection of thermostat and re-fixing of fan coil unit at its original place with testing and commissioning at site. |
| 2 | Replacing burnt/defective/noisy 1/10 or 1/12 HP motor of FCU after removing from installed FCU in the guest room with new rewinding motor i/c connection providing bush, nuts, bolts for motor etc. as required and commissioning of FCU at site. (New/rewind motor shall be supplied by the deptt.) |
| 3 | P/F of insulated double sand witched type tray made out of 22 SWG G.I. Sheets with 12 mm thick thermocole insulation in between double tray and one layer of hot bitumen inside and painted with synthetic enamel paint from outside the tray i/c providing suitable drain connection as required of following sizes including dismantling, removal & stacking of existing old damaged tray as reqd.51” x 24”x2” (approx) or45” x24” x 3” (approx) |
| 4 | P/F of water proof canvass connection of FCU made out fromdouble water proof canvass cloths complete stitching, G. I. frames on both side with necessary holes, nuts, bolts, washers etc. as required at site includingremoval of old damaged canvass connection. |
| 5 | Servicing/overhauling/cleaning of Air-handling units complete with dismantling of filter section, coil section, and cleaning externally the cooling coil 6 RAW deep with Jet water pressure including cleaning of blower housing, blowers, filters etc. and fixing ofnew nuts, bolts, washers, greasing of bearing, motor pullet etc. as reqd. at site.CAPACITY OF AHU/TFA UNIT:- |
| 6 | Model AH-6 to AH-96000 to 12000 Cfm |
| 7 | Model AH-11to AH-12 16000 to 20000 Cfm |
| 8 | Servicing/overhauling/cleaning of LLD-9 type AHU for Conventional hall divided in to four section i.e. eliminators, Single coil section – 7 Nos, 6raw deep coil section – 7Nos., Filter section with 48 Nos. filters and damper section etc. The cooling coil shall be cleaned with jet water pressure Including checking of motor, pulley, greasing of bearings etc. as required at site. |
| 9 | Providing and fixing of pillow block NTN bearings of AHU/ TFA Units after removing the damaged bearings with using Puller etc. as required at site. |
| 10 | Bearings UCP NTN 206/207. |
| 11 | Bearings UCP NTN 210 to 214. |