| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-03-2026 | Corrigendum3 | Date | 23-03-2026 |
| 2 | 10-02-2026 | Corrigendum2 | Date | 09-03-2026 |
| 3 | 19-01-2026 | Corrigendum1 | Date | 17-02-2026 |
| Sl. No. | Item Description |
| 1 | SEWAGE TREATMENT PLANT(100 KLD CAPACITY) :- Supplying, Fabrication, Installing, Testing & Commissioning of Pre Fabricated Package Type Sewage Treatment Plantof capacity 100 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line,by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 100KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 38 to 42 of CA. |
| 2 | Supply, Installation, Testing & Commissioning of “SCADA SYSTEM” for 100 KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per the details given in Schedule \"A\" Part-I page No 43 of CA. The STP SCADA system shall comprise of following :-(a) Central Monitoring Station (CMS) with personal computer with latest processor and monitor of suitable size.(b) UPS with two hours backup(c) Colour Laser Printer(e) Data Gateway(f) SCADA software |
| 3 | SEWAGE TREATMENT PLANT(75 KLD CAPACITY) :- Supplying, Fabrication, Installing, Testing & Commissioning of Pre Fabricated Package Type Sewage Treatment Plantof capacity 75 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line,by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 75 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 44 to 48 of CA. |
| 4 | Supply, Installation, Testing & Commissioning of “SCADA SYSTEM” for 75 KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per the details given in Schedule \"A\" Part-I page No 49 of CA. The STP SCADA system shall comprise of following :-(a) Central Monitoring Station (CMS) with personal computer with latest processor and monitor of suitable size.(b) UPS with two hours backup(c) Colour Laser Printer(e) Data Gateway(f) SCADA software |
| 5 | Supplying, Installation, Testing and commissioning of extendable, compartmentalised, front operated , back openable, LT cubicle STP panel having ingress protection of IP 54, suitable for operation on 415 Volt 3 phase 50 c/s power supply fabricated out of 2mm thick CRCA sheet steel and base channel of MS section not less than 100mm X 50mm X 5mm, gland plate of 3 mm thick cleanedand treated in 7 tank process and powder coated with approved shade with TPN Electrolytic Aluminiumbusbar of 100A duly insulated in colour coding & suitable to withstand 25 MVA fault lavel complete with supplying & installationof following equipment including interconnection, control wiringetc as required. All MCCBs shall have microprocessor based release & shall have manually operated handle.It includes all wiring , cabling of required sizes from STP panel board to each electrical parts with on site control panel for individual motors . The panel will consists ofItems as per drawings attached.(Panel shall be of outdoor type installation with suitable IP Protection)Complete LT cubicle STP panel having ingress protection of IP 54 to be provided as per the details given in Schedule \"A\" Part-I from page No 50& 51 of CA. |
| 6 | Construction of Pump House with Toilet building as per permanent specification all as shown on drawings and as specified. |
| 7 | Lumpsum price worked out by the contractor for EARTH WORK , SITE CLEARANCE AND DEVELOPMENT as listed in Schedule \"A\" Part-III. |
| 8 | Lumpsum price worked out by the contractor forINTERNAL WATER SUPPLY as listed in Schedule \"A\" Part-IV. |
| 9 | Lumpsum price worked out by the contractor forINTERNAL ELECTRIC SUPPLYas listed in Schedule \"A\" Part-V. |
| 10 | Lumpsum price worked out by the contractor for PLUMBING WORKSas listed in Schedule \"A\" Part-VI. |
| 11 | Lumpsum price worked out by the contractor for ROAD AND HARDSTANDINGas listed in Schedule \"A\" Part-VII. |
| 12 | Lumpsum price worked out by the contractor forSEWAGE DISPOSAL as listed in Schedule \"A\" Part-VIII. |
| 13 | Lumpsum price worked out by the contractor forSECURITY AND FENCING GATE Works as listed in Schedule \"A\" Part-IX. |
| 14 | Lumpsum price worked out by the contractor for EXTERNAL WATER SUPPLYas listed in Schedule \"A\" Part-X. |
| 15 | Lumpsum price worked out by the contractor forEXTERNAL ELECTRIC SUPPLY Works as listed in Schedule \"A\" Part-XI. |
| 16 | Precastfactory made Man hole Covers slab M-45 concrete set in Cement Mortar 1:6 of dia 560 mm all as specified and as directed. |
| 17 | Precast RCCfactory made Man hole Covers slab M-45 concrete set in Cement Mortar 1:6 of dia 900 mm all as specified and as directed. |
| 18 | Supply,layingand testing of150 mm nominal diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions completeallas specified and as directed.Note:- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHODS shall be strictly compiledas per clause no A-4 of ANNEX \"A\" of IS 16098 (Part-2) : 2013. |
| 19 | Supply,layingand testing of200 mm nominal diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions completeallas specified and as directed.Note:- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHODS shall be strictly compiledas per clause no A-4 of ANNEX \"A\" of IS 16098 (Part-2) : 2013. |
| 20 | Supply,layingand testing of100 mm nominal diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions completeallas specified and as directed.Note:- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHODS shall be strictly compiledas per clause no A-4 of ANNEX \"A\" of IS 16098 (Part-2) : 2013. |
| 21 | Cutting of Road/footpath surface exc 15cm and n exc 30cm in depth and removal of thereof outside defence area. |
| 22 | Construction masonary valve chambersize 60 X 60 X 75 cm (Internal dimension) in repair with 100 mm thick PCC 1:4:8 type D-2 (using 40mm graded stone aggregate) sub base of floor, 50mm thick PCC 1:2:4 type B-1 (using 20mm graded stone aggregate) in floor finished even and smooth without using extra cement, one brick thick wall in cm 1:4 using old size sub class \"B\" bricks and plastering internally and externally upto 150mm below GL 15 mm thick withcementmortar(1:4) and MS sheet cover not less than 6 mm thick withangle iron frame size 40x40x6mm, locking arrengement and painting with two coats synthewtic enamel painting over a coat of the red oxide primer including excavation and earth work in any type of soil complete all as specified and directed. |
| 23 | Monoblock pump set suitable for 415 V ,3 phase system having capacity 5 HP. Complete with electric connection all as specified. |
| 24 | Panel cubical type of suitable size, 415 volt, factory made CPRI approved dust proof vermin proof (Kiosik type) for outdoor use made out of CRCA sheet 3.15 mm thick exept inner sheath OG 2 mm powder coated, machine pressed, both side opening in two halves with provision of rubber beading and locking system, inciuding aluminium bus bar of 200 Amp capacity, 4 strip mounted on porcelain insulator, bus bar chamber shall be provided with inspection covers each MCCB/ cubical switch shall have be independent opening, panel should be monthed on angle iron frame and legs (vertcal height of legs not less than 30 cm exept in PCC) made from angle of size 50x50x5 mm, frame and legs duly spray painted internally and externally with two coats of synthetic enamel paint over a coat of red oxide primer legs grouted in PCC(1:3:6) type B-2(using 40 mm graded stone aggregate) complete including all connection/ control wiring with suitable size of copper conductor cable, including danger notice sticker, comprising the following accessory including testing complete all as specified.(a) MCCB 100 Amp 16 kA, 4 pole,415V,50HZ - 01 No. (Incomer)(b) MCCB 63Amp 16kA, TP,415V,50HZ-02 Nos. (Outgoing blower & Pump)(c) MCB 6 Amp 10 kA, SP, Icu=100% Ics - 2 Nos. (Outgoing light)(d) Change over switch 63 amp-01 No.(e)Star Delta Starter for 5 hp Motor - 02 Nos(f)R,Y,B Indicators -01 Set(g) Digital Multifunction meter incl necessary CTs(set of three) - 1 set |
| 25 | Motor control panel cubical type of suitable size, 415 volt, factory made CPRI approved dust proof vermin proof (Kiosik type) for outdoor use made out of CRCA sheet 3.15 mm thick exept inner sheath OG 2 mm powder coated, machine pressed, both side opening in two halves with provision of rubber beading and locking system, inciuding aluminium bus bar of 250 Amp capacity, 4 strip mounted on porcelain insulator, bus bar chamber shall be provided with inspection covers each MCCB/ cubical switch shall have be independent opening, panel should be monthed on angle iron frame and legs (vertcal height of legs not less than 30 cm exept in PCC) made from angle of size 50x50x5 mm, frame and legs duly spray painted internally and externally with two coats of synthetic enamel paint over a coat of red oxide primer legs grouted in PCC(1:3:6) type B-2(using 40 mm graded stone aggregate) complete including all connection/ control wiring with suitable size of copper conductor cable, including danger notice sticker, comprising the following accessory including testing complete all as specified.(a) MCCB 160 Amp 16 kA, 4 pole,415V,50HZ - 01 No. (Incomer)(b) MCCB 100Amp 16kA, TP,415V,50HZ-02 Nos. (Outgoing blower & Pump one working+one spare)(c) MCB 6 Amp 10 kA, SP, Icu=100% Ics - 2 Nos. (Outgoing light)(d) Change over switch 100 amp-01 No.(e)Star Delta Starter for 5 hp Motor - 02 Nos(f)R,Y,B Indicators -01 Set(g) Digital Multifunction meter incl necessary CTs(set of three) - 1 set |
| 26 | Supply, installation, testing and commissioning Silent Diesel engine driven trailer mounted generating set complete with accoustic enclosure CPCB 4+ approved and control system for 30.0 KVA outputat site ie at MSL after de rating Ac 415 Vollts, 50 C/S, 3 phase 4 wire directly coupled complete with self starting system with and including accessories, equipment control panel etc as detailed below:-(a) Diesel Engine :-Diesel engine water/coolent cooled and electric start suitable to drive mentioned alternator independently, coupled directly through coupling , two cylinder 4 stroke, at 1500 RPM industrial type as per BS:5514 or IS-10001/10002 suitable to requlate speed of DG set from no load to full load complete with fuel tank of capacity as per manufacture\"s recommendations, fuel line exhaust pipe duly insulated with asbestos rope and with support and silencermufflers etc for contuious operation and standard accessories, sump pre heaters etc all as specified and directed.Air Intake System(i) Air intake mainfold, (ii) Dry type air cleaner, (iii) Vaccum indicatorExhaust System(i) Turbo charger, (ii) Flexible connection, (iii) Exhaust mainfold, (iv) Residential silencerCoolent System(i) Engine water pump, (ii) Radiator, (iii) Coolant additive concentrateLubrication System(i) Oil pan, (ii) Engine mounted lube oil pump, (iii) Full flow spin-on lube oil filterFuel System(i) Electronic Governor, (ii) 12 V DCSolenoid coil, (iii) Dual fuel filter systemStarting System(i) 12 Volt DC electric starter(ii) 12 Volt DC battery charging alternator |
| 27 | Item No.26(Contd...)(b) Alternator :- Synchronous alternator of 30 KVA output at 0.80 PF AC 3 phase 4 wire 415 volts 50 Hz self exicted & self regulated through AVR, alternator will be suitable for tropical climate and screen protected drip proof type with two ends shield ball/ roller bearing with damper winding in each pole faces as per IS:13364 OR BS -2613-1970 complete all as specified and directed.(c) Control Panel:-The standard control panel from consisting of control cubical fabricated 14/16 SWG sheet steel construction indoor type suitable for mounting accssories, static energy meter with LED display, digitalpower factor meter, digital frequency meter and digital RPM Meter,digital volt meter (0-500V) with inbuiltselector switch, digital ammeter, CT\"s operatedof suitable rating with inbuilt selector switch , indicator lamp LED type, hours meter , low oil pressure indicaton, over speed indication and high water temperature indicator.\"(d) Electric starter equipment:- The equipment will conprise the following.:-(i) Maintenance free battery duly intial charged & battery lead of adequate capacity, make of battery- Exide/luminious/sukam.(ii) Starter motor(iii) Starter gearing(iv) start/stop push button(v) Invertor cum battery charger 500 VA capacity suitable to work on 230 volts 50 Hz AC supply system for charging of DG set batteriesexternally when DG set is in off position. Make -Sukam/microtec.(vi) Alternator/Dynamo of suitable capacity to charge the batterieswhile DG set is running complete with auto cut all as per manufacture\"s recommendations.(vii) PCC foundation for DG set all as per manufacturer recommendation or asrequired at site deemed to be included in quoted rates or directedd by Engr-in-charge. |
| 28 | Item No.26(Contd...)(e) AMF Panel:- Auto mains failure panel 415 volts 50 Hz suitable for 30 KVA Gen set detailed above, made out of 16 guage MS sheet cubical type floor mounted front and rear door openablewith locking arrangement duly powder coated suitable for and including the following:- (i) Auto transfer switch 4 pole 200 Amps 415 volts with 2 No pole 25 KA rupturing capacity MCCBs , ATS electronic control box for automatic switching ON and OFF of DG set and transfer of load, pre assembled and ready to use complete in all respected equipped with microprocessor based controller 100% auto 50% auto by pass arrangement adjustable time delay to engine start , standard setting 3 seconds adjustable0-10 seconds, adjustable time delay on transfer to nominal 0-30 minute time delay(adjustable) to engine cool down 0-5 minutes, adjustable time delay on transfer to emergency 0-15 seconds.(ii) Volt meter 30-600 volts, flush mfd 96 Sqmm, digital type with selector switch suitable to connect volt meter to stand by main supply.(iii) Ammeter 0-300 amps CT\"s operated flush mfd 96 Sqmm digital typewith selector switchand CT\"s of appropriate ratio. (iv) Digital frequency meter 04 digit flush mfd 96 Sqmm size for frequency range 30 to 19.99 Hz with buikt in transducer. (v) Digital power factor meter 440 volts 5 amps with built in traducer flush mfd 96 Sqmm size. |
| 29 | Supply, installation, testing and commissioning Silent Diesel engine driven trailer mounted generating set complete with accoustic enclosure CPCB IV+ approved and control system for 60 KVA outputat site ie at MSL after de rating Ac 415 Vollts, 50 C/S, 3 phase 4 wire directly coupled complete with self starting system with and including accessories, equipment control panel etc as detailed below:-(a) Diesel Engine :-Diesel engine water/coolent cooled and electric start suitable to drive mentioned alternator independently, coupled directly through coupling , two cylinder 4 stroke, at 1500 RPM industrial type as per BS:5514 or IS-10001/10002 suitable to requlate speed of DG set from no load to full load complete with fuel tank of capacity as per manufacture\"s recommendations, fuel line exhaust pipe duly insulated with asbestos rope and with support and silencermufflers etc for contuious operation and standard accessories, sump pre heaters etc all as specified and directed.Air Intake System(i) Air intake mainfold, (ii) Dry type air cleaner, (iii) Vaccum indicatorExhaust System(i) Turbo charger, (ii) Flexible connection, (iii) Exhaust mainfold, (iv) Residential silencerCoolent System(i) Engine water pump, (ii) Radiator, (iii) Coolant additive concentrateLubrication System(i) Oil pan, (ii) Engine mounted lube oil pump, (iii) Full flow spin-on lube oil filterFuel System(i) Electronic Governor, (ii) 12 V DCSolenoid coil, (iii) Dual fuel filter systemStarting System(i) 12 Volt DC electric starter(ii) 12 Volt DC battery charging alternator |
| 30 | Item No.27(Contd...)(b) Alternator :- Synchronous alternator of 60 KVA output at 0.80 PF AC 3 phase 4 wire 415 volts 50 Hz self exicted & self regulated through AVR, alternator will be suitable for tropical climate and screen protected drip proof type with two ends shield ball/ roller bearing with damper winding in each pole faces as per IS:13364 OR BS -2613-1970 complete all as specified and directed.(c) Control Panel:-The standard control panel from consisting of control cubical fabricated 14/16 SWG sheet steel construction indoor type suitable for mounting accssories, static energy meter with LED display, digitalpower factor meter, digital frequency meter and digital RPM Meter,digital volt meter (0-500V) with inbuiltselector switch, digital ammeter, CT\"s operatedof suitable rating with inbuilt selector switch , indicator lamp LED type, hours meter , low oil pressure indicaton, over speed indication and high water temperature indicator.\"(d) Electric starter equipment:- The equipment will conprise the following.:-(i) Maintenance free battery duly intial charged & battery lead of adequate capacity, make of battery- Exide/luminious/sukam.(ii) Starter motor(iii) Starter gearing(iv) start/stop push button(v) Invertor cum battery charger 500 VA capacity suitable to work on 230 volts 50 Hz AC supply system for charging of DG set batteriesexternally when DG set is in off position. Make -Sukam/microtec.(vi) Alternator/Dynamo of suitable capacity to charge the batterieswhile DG set is running complete with auto cut all as per manufacture\"s recommendations.(vii) PCC foundation for DG set all as per manufacturer recommendation or asrequired at site deemed to be included in quoted rates or directedd by Engr-in-charge. |
| 31 | Item No.27(Contd...)(e) AMF Panel:- Auto mains failure panel 415 volts 50 Hz suitable for 60 KVA Gen set detailed above, made out of 16 guage MS sheet cubical type floor mounted front and rear door openablewith locking arrangement duly powder coated suitable for and including the following:- (i) Auto transfer switch 4 pole 200 Amps 415 volts with 2 No pole 25 KA rupturing capacity MCCBs , ATS electronic control box for automatic switching ON and OFF of DG set and transfer of load, pre assembled and ready to use complete in all respected equipped with microprocessor based controller 100% auto 50% auto by pass arrangement adjustable time delay to engine start , standard setting 3 seconds adjustable0-10 seconds, adjustable time delay on transfer to nominal 0-30 minute time delay(adjustable) to engine cool down 0-5 minutes, adjustable time delay on transfer to emergency 0-15 seconds.(ii) Volt meter 30-600 volts, flush mfd 96 Sqmm, digital type with selector switch suitable to connect volt meter to stand by main supply.(iii) Ammeter 0-300 amps CT\"s operated flush mfd 96 Sqmm digital typewith selector switchand CT\"s of appropriate ratio. (iv) Digital frequency meter 04 digit flush mfd 96 Sqmm size for frequency range 30 to 19.99 Hz with buikt in transducer. (v) Digital power factor meter 440 volts 5 amps with built in traducer flush mfd 96 Sqmm size. |
| 32 | Construction of platform of size 3000mm x 2500mm x 1200 mm for installation of transformer with brick steps on one side, chain link fencing around transformer,fencing should have hinged door and locking arrangements complete all as shown on drawing No CEPZ/C-TD/002/13 sht 2/5 complete all as specified. |
| 33 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ)for 11 months { PHASE - IIrefer Sch \"A\" note no.2.1(b) } ,after completion of STP & SCADA. Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 34 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ)for 11 months after completion of Phase-II { Phase-III refer Sch \"A\" note no.2.1(c) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 35 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ) for 11 months after completion of Phase-IV { Phase- V refer Sch \"A\" note no.2.1(e) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 36 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ)for 11 months after completion of Phase-VI { Phase-VII refer Sch \"A\" note no.2.1(g) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 37 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ) for 11 months after completion of Phase-VIII { Phase-IX refer Sch \"A\" note no.2.1(j) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 38 | Manning & Operation of theSTP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ) for 05 months after completion of Phase-IX { Phase- X refer Sch \"A\" note no.2.1(k) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 39 | Notes for Serial Item No. 29 to 34 above :- (i)The FGMs employed by the contractor shall be ITI qualified from recognised institute having sufficient knowledge and experience i.e. minimum 02 years in maintenance / operation of similar work. The operators must be competent to carry out the repairs / maintenance of plant as required. (ii) The operators shall maintain the desired quality treated water including tracing out and rectification of minor leakages in pipe line / valves during the period. (iii)The operators shall operate elctrical equipements, pumps and maintain the STP in workable condition by checking daily leakages noise, cleaning the plant and its surrounding areas of plant as directed. (iv) The Contractor shall maintain all registers, log books,under various rules, and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department. (v) The unit rate quoted shall be deemed to be included for cost of labour for daily for daily routine maintenance for trouble free functioning of installation. (vi) The quoted rate shall be deemed to be inclusive all consumables required for operation of STP.(vii) The payment to the staff employed shall be made within first week of every month through online mode in employees respective Bank Account. No payment to contractors / firms will be made unless proof of payment of wages / EPF / ESI etc through bank account is submitted by the contractor to all employees. Contractor shall produce details of payment made to the employees along with supporting documents for the verification of Engineer-in-Charge for processing the monthly / finall bills. In case of revision in pay slab by Government during the currency of contract, same shall be paid to the employee by the contractor and accordingly rates shall be quoted.(viii) The contracor should follow the terms & conditions of E-in-C\"s br policy no 10/2023 issued vide letter No A/95533/SCADA Sewage/Pol/E2W (PPC) dt 21 Jul 2023 .(ix) Necessary spare & manpower will be provides by Contractor. (x) Desired water quality as per standard norms comply with E-in-C\"s branch direction to be achieved. |
| 40 | Comprehensive maintenance of the above STP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ) { Phase - IV refer Sch \"A\" note no.2.1(d) } ,for the period of 1styears after expiry of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 5.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Monthsafter completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engineer-in-Charge. |
| 41 | Comprehensive maintenance of the above STP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ) { Phase - VI refer Sch \"A\" note no.2.1(f) } ,for the period of 2nd years after expiry of first year of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 5.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Months after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engr-in-Charge. |
| 42 | Comprehensive maintenance of the above STP & SCADA (of capacity 2 x 100 KLD & 1 x 75 KLDas per srl item No 1 to 5 of this BOQ){ Phase - VIII refer Sch \"A\" note no.2.1(h) } ,for the period of 3rdyears after expiry of second year of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 5.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Months after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engr-in-Charge. |
| 43 | Notes for Serial Item No. 35 to 37above :- (a) Comprehensive maintenance includes replacement of all defective/ worn out / damaged parts including MBR membrane with new parts and nothing extra shall be paid on this account except the payment specified in this item. (b) The contractor shall be responsible for periodic maintenance as per maintenance schedule and specified including renewal/ replacement of parts, lubricants, fittings / fixtures filling of bacteria etc required for smooth functioning of the plant as per manufacturers instructions. (c) The rate quoted shall be deemed to be inclusive of safety gear & required tools for maintenance. (d) The quoted rate is deemed to be inclusive of tool & testing instruments required for operation & maintenance of STP plant.(e) The sludge cakes procured after treatment shall become contractors property and shall be removed from premises of STP as early as possible. The rate shall be quoted accordingly. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail