| 1 | Synthetic net |
| 2 | Surface dressing of the ground including removing vegetation and ineqalities not exceeding 15 cm deep and disposal of rubbish lead up to 50 Mtr. And lift up to 1.5 Mtr. All kinds of soil. |
| 3 | Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil |
| 4 | Supply and fixing Jodhpur sand stone Machine cut Kerb stone (10cm wide 40 cm. height) fixed in white cement sand mortar 1:4 with pigment including EarthWork. |
| 5 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] includiong 20 Km lead . |
| 6 | a) For Grading I Material |
| 7 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 8 | Extra if square,rectangular hollow tubelar sections are used or grill made by flats only |
| 9 | Providing and applying superior quality emulsion for wall painting with Velvet touch/Royal paint etc of approved brand and manufacture to give an even shade with putty and preparation of surface applying with the help of paint roller the work complete in all respect as per direction of Engineer-in-charge. |
| 10 | New Work Three or More coat |
| 11 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. |
| 12 | Good soil of earth |
| 13 | Supply of dry manure including loading unloading,transportation & stacking at site. |
| 14 | Farm yard manure(organic) |
| 15 | Compost |
| 16 | Goat dungmanure. |
| 17 | Laying of lawns including ploughing leveling breaking of clods manuring and removal of stones etc. (cost of manure or extra good earth to be paid separately )maintenance of lawn foe 30 days or more till the grass forms a thick lawns free from weeds and fit for moving in the duration of planting if lawn die some where the contractor will replant it at his own cost |
| 18 | in rows 5 cm apart in either direction |
| 19 | Maintenance of lawn (FOR 3 YEARS) |
| 20 | Irrigation of lawn |
| 21 | Uprooting weeds from the lawn plots and trenched area after 10 to 15 days of its flooding with including disposal of uprooted vegetation |
| 22 | Moving manually / with power machines |
| 23 | with power machine |
| 24 | Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) Please Enable Macros to View BoQ information |