| 1 | M/L for Maintenance and servicing of standby DG Set complete including draining out of diesel from tank , cleaningthe tank thoroughly and refilling the drained out diesel, draining out engine oil from the sump, cleaningthe sump thoroughly and refilling the sump with new engine oil to it’s required level, replacing the fuel filter, lubricating oil filter, check & clean air cleaner , change air cleaner elements, check coolant level & make up the same, drain the fuel filter & water separator, filling the starting batteries with electrolyte/ distilled water to maintain the required specific gravity, replace the u/s brass connectors for batteries, cleaning of battery terminals & applying petroleum jelly to battery terminal posts & brass connectors, including M & L for V Belts, checking of exhaust leakage, governor, breathers etc, adjust/set the same for proper functioning of DG Set, checking of fuel, oil and water/ coolant level etc, adjusting and keeping the fan belts to the desired tension, tightening all the bolts and nuts to the required torque etc, cleaning the DG Set with accessories asprescribed by the manufacturer and test for satisfactory running of DG set for two hour at connected load and record shall be made in respect of RPM , oil pressure , oil temperature , coolant temperature, voltage , frequency , load current , battery charging , fuel consumption etc complete all as specified and directed by Engineer in Charge for 20 to 82.5 KVA DG setMake Kirloskar.Details of DG sets:Note :-Including(a).Engine oil., (b).Coolant(c).Testing will be carried out in presence of Engineer - in - charge and DHPP consumption will be entered in PRRB.(d).The Make of Fuel filter , Oil Filter , V belt & component will be as per manufactures recommendations.(e)Dismantling the diesel sump cover cleaning complete, removing sludge, dust etc and re-fixing including replacement of sump gasket etcfollowing capacities of DG Set |
| 2 | All as per item No.1 above but for 100 to 200 KVA DG Set Make as per site. |
| 3 | All as per item No.1 above but for250 to 400 KVA DG Set Make as per site. |
| 4 | All as per item No.1 above but for 500 to 750 KVA DG Set Make as per site. |
| 5 | Supply only multi-grade 15W40 lubricating oil for DG Sets as per manufacturer’s recommendations, complete all as specified and directed. Make- IOC, Castrol, Hindustan Petroleum |
| 6 | Supply only coolant for radiator as per manufacturer’s recommendations, complete all as specified and directed. Make- Castrol, Servo, Cummins |
| 7 | Supply & fixing in repair /replacementWater body,radiator system, with connecting accessories Hose pipe set ,Clips of water / coolant cooled radiator systemfor following DG set:-(a)20 to 82.5KVA DG set |
| 8 | All as per item No.7 above but for 100 to 200 KVA DG Set |
| 9 | All as per item No.7 above but for 250 to 400 KVA DG set |
| 10 | All as per item No.7 above but for 500 to 750DG set |
| 11 | M&L for top overhauling of DG set 20 to 82.5 KVA of anyMake as per site and including of taking down of the old unsv parts such as inlet and exhaust valve mechanism, valve guide sheet, tappets, cylinder liners, pressure ring, oil rings, pistonconnecting rod and gagen pin and lathe workas required for top overhauling, including fixing all the necessary parts in postion, complete all as specified and directed.Note :- Items used in overhaulling measured and paid Separately. |
| 12 | Supply and fixing Sleeves liner, piston, Piston oil ring, Piston pressure ring including accessories used in fixing. |
| 13 | Supply and fixing Connecting rod ,Connecting bearing,Connecting rod bush. |
| 14 | Supply anf fixing Connecting valve guide,Valve sheet,Inlet and exhaust Valve spring. |
| 15 | Supply and fixing oil cooler,feed pump,compresor ring . |
| 16 | Supply and fixing Turbo charger, Turbo Jain with Accessories used in fixing. |
| 17 | Supply and fixing ECU, MPU,IPS Sensor , Stop solonide. |
| 18 | Supply & Fixing of FIPafter callibration with complete reqd accessories |
| 19 | Repairing of Head included Leathe work and Head gas Kit. |
| 20 | Supply and fixing of Crank Shaft. |
| 21 | M&L for top overhauling of DG set 100 to 200 KVA of anyMake as per site and including of taking down of the old unsv parts such as inlet and exhaust valve mechanism, valve guide sheet, tappets, cylinder liners, pressure ring, oil rings, pistonconnecting rod and gagen pin and lathe workas required for top overhauling, including fixing all the necessary parts in postion, complete all as specified and directed.-Note :- Items used in overhaulling measured and paidSeparately. |
| 22 | Supply and fixing Sleeves liner, piston, Piston oil ring, Piston pressure ring including accessories used in fixing. |
| 23 | Supply and fixing Connecting rod ,Connecting bearing,Connecting rod bush. |
| 24 | Supply anf fixing Connecting valve guide,Valve sheet,Inlet and exhaust Valve spring. |
| 25 | Supply and fixing oil cooler,feed pump,compresor ring . |
| 26 | Supply and fixing Turbo charger, Turbo Jain with Accessories used in fixing. |
| 27 | Supply and fixing ECU, MPU,IPS Sensor , Stop solonide. |
| 28 | Supply and Fixing of FIPafter callibration with complete reqd accessories |
| 29 | Repairing of Head included Leathe work and Head gas Kit. |
| 30 | Supply and fixing of Crank Shaft. |
| 31 | M&L for top overhauling of DG set 250 to 400 KVA of anyMake as per site and including of taking down of the old unsv parts such as inlet and exhaust valve mechanism, valve guide sheet, tappets, cylinder liners, pressure ring, oil rings, pistonconnecting rod and gagen pin and lathe workas required for top overhauling, including fixing all the necessary parts in postion, complete all as specified and directed.Note :- Items used in overhaulling measured and paid Separately. |
| 32 | Supply and fixing Sleeves liner, piston, Piston oil ring, Piston pressure ring including accessories used in fixing. |
| 33 | Supply and fixing Connecting rod ,Connecting bearing,Connecting rod bush. |
| 34 | Supply anf fixing Connecting valve guide,Valve sheet,Inlet and exhaust Valve spring. |
| 35 | Supply and fixing oil cooler,feed pump,compresor ring . |
| 36 | Supply and fixing Turbo charger, Turbo Jain with Accessories used in fixing. |
| 37 | Supply and fixing ECU, MPU,IPS Sensor , Stop solonide. |
| 38 | Supply and Fixing of FIPafter callibration with complete reqd accessories |
| 39 | Repairing of Head included Leathe work and Head gas Kit. |
| 40 | Supply and fixing of Crank Shaft. |
| 41 | M&L for top overhauling of DG set 500 to 750 KVA of anyMake as per site and including of taking down of the old unsv parts such as inlet and exhaust valve mechanism, valve guide sheet, tappets, cylinder liners, pressure ring, oil rings, pistonconnecting rod and gagen pin and lathe workas required for top overhauling, including fixing all the necessary parts in postion, complete all as specified and directed. Note :- Items used in overhaulling measured and paid separately.- |
| 42 | Supply and fixing Sleeves liner, piston, Piston oil ring, Piston pressure ring including accessories used in fixing. |
| 43 | Supply and fixing Connecting rod ,Connecting bearing,Connecting rod bush. |
| 44 | Supply anf fixing Connecting valve guide,Valve sheet,Inlet and exhaust Valve spring. |
| 45 | Supply and fixing oil cooler,feed pump,compresor ring . |
| 46 | Supply and fixing Turbo charger, Turbo Jain with Accessories used in fixing. |
| 47 | Supply and fixing ECU, MPU,IPS Sensor , Stop solonide. |
| 48 | Supply and Fixing of FIPafter callibration with complete reqd accessories |
| 49 | Repairing of Head included Leathe work and Head gas Kit. |
| 50 | Supply and fixing of Crank Shaft. |
| 51 | S&F in repair and replacementself starterfor 20 to 82.5 KVA suitable make ofDG set as per sitecomplete all as specified and directed. |
| 52 | S&F in repair and replacement self starterfor 100 to 200 KVA suitable make ofDG set as per sitecomplete all as specified and directed. |
| 53 | S&F in repair and replcement self starterfor 250 to 400 KVA suitable make ofDG set as per sitecomplete all as specified and directed. |
| 54 | S&F in repair and replacementself starterfor 500 to 750 KVA suitable make ofDG set as per sitecomplete all as specified and directed. |
| 55 | S & F in repair flexible fuel pipe of 5 Mtr length including end hexa nut bolts etc, complete all as specified and directed. |
| 56 | M & L for replacement of battery lead terminals made of brass and suitable for battery and terminal complete all as specified and directed by the Engr -in-Charge. |
| 57 | M & L for replacement of battery lead set of two suitable for up to 180 AH capacity, 1.5 Mtr long including GM terminal one end ,copper lug other end as directed by Engr-in-Charge. |
| 58 | M&Lin repair and replacementlead acid battery maintenance free 12 Volt 150Ah, complete all aspecified and directed Make: Exide/Amaron |
| 59 | M&Lin repair and replacementlead acid battery maintenance free 12 Volt 180Ah, complete all aspecified and directed Make: Exide/Amaron |
| 60 | Supply and replacementof battery charger of 12 V with boost charging and trickle facility and amp and volt meter complete. |
| 61 | Supply and fixingin repair of Governer Card of following DG set as following:- |
| 62 | (a) 30 KVA to 82.5 KVA |
| 63 | (b) 100 KVA to 200 KVA |
| 64 | (c) 250 KVA to 400 KVA |
| 65 | (d) 500 KVA to 750 KVA |
| 66 | Dismantling of radiator complete from D G Sets cleaning/ scraping of depositing manually from outside of the radiator, cleaning of all copper tubes of radiator with descalling solution from inside & outside with forced feed method&with water and aircompressor (by using separate chemical pump, water pump & compressor ) including plugging of all leakage in welding, brazing of copper tubes, claining of fins and replacement of gaskets etc for the following capcities of DG sets :- |
| 67 | (a) 30 KVA to 82.5KVA |
| 68 | (b) 100 KVA to 200 KVA |
| 69 | (c) 250 KVA to 400 KVA |
| 70 | (d) 500 KVA to 750 KVA |
| 71 | Material and labour for servicing battery charging alternators assembly of DG Set , by disconnecting from engine and dismantling the battery charging alternator assembly for following DG set cleaning all accessories and replacing with worn out parts like carbon brush, bush/bearing , jumping leads etc, and varnishing all as directed. |
| 72 | (a) 30 KVA to 82.5 KVA |
| 73 | (b) 100 KVA to 200 KVA |
| 74 | (c) 250 KVA to 400 KVA |
| 75 | (d) 500 KVA to 750 KVA |
| 76 | Disconnecting, and taking out carefully unserviceable alternator,and old pattern AVR ofany make and any capacityof DG Sets, dismantling and strip opening of alternator for servicing, taking outand removing old burnt out winding and rewinding of alternator with existing gauge super enameled copper wireas approved by the Engineer-in-Charge with insulating material such as luminous paper, latherized paper, cotton tape, glass sleeves, insulating varnish & alternators making new to shunt field coil,main poles, yoke, armature slot, armature, commutator, bushes, bearing, shaft magnatic, pole shoe, boring, making new to cleaning slots / Decalying of slots if it get damagedetc, including reassembling and fixing the same in position and testing alternator assembly, complete all as specified and directed by the Engineer-in-Charge. |
| 77 | Taking out following defective parts from Alternator ofDG sets and supply and fixing new parts in same position including testing, complete all as specified and directed by Engineer-in-Charge :- |
| 78 | (a)AVR unit complete for 30 to 82.5 KVA DG Set |
| 79 | (b)AVR unit complete for 100 KVA to 200 KVA DG Set |
| 80 | (c)AVR unit complete for 250KVA to 400 KVA DG Set |
| 81 | (d)AVR unit complete for 500 KVA to 750 KVA DG Set |
| 82 | (e)Terminal plate |
| 83 | Silicon Rectifier assemblywith metallic plate as existing covered with thin layer of selenium and inverted nut bolt , control wiring soldering complete |
| 84 | Flexible rubber coupling star typecapacity alternator coupled for 30 to 200KVA , complete all as specified and directed |
| 85 | Flexible rubber coupling star type capacity alternator coupled with Kirloskar or any other approved make of DG set for 200 to 750KVA, complete all as specified and directed |
| 86 | S&F in repair RPM meter of DG set complete all as specified and directed. |
| 87 | S&F in repair oil pressure Gauge on DG set complete all as specified and directed. |
| 88 | S&F in repair oil temperature Gauge on DG set complete all as specified and directed. |
| 89 | S&F in repair water temperature Gauge on DG set complete all as specified and directed. |
| 90 | Dismantling asbestos rope from silencer of DG set and supply & fixing asbestos rope (8/10mm thick) around silencers complete all as specified and directed. |
| 91 | Periodical maintenance for the following capacities lifts at various bldgs:- Note : (a) Cost of the comprehensive maintenance incudes all minor consumable repairs/replacement of spares/parts like grease, lubricant oil, cotton waste thimbles, small pieces of cables, cable lugs, bolts, nuts, washers, emery papers and like sundry items and supply and fix all types of minor spare parts shall be deemed ot be included in the quoted in unit rate. (b) The comprehensive maintenance to be carried out by Original Equipment manufacturer (OEM) or any authorised service partner only. (c) All break down and repair shall be attended by OEM as and when fault / trouble accurs in the lift and the complaints should be addressed within 04 hours and minimum 01 inspection shall be carried out by the OEM monthly. All safety tests should be carried out by OEM and report to be submitted to the Engr-in-Charge. (d) The replacement of spares/parts measured and paid separately. |
| 92 | All as per item No. 74 here-in-before Astra Bldg lift of capacity 1.0 Ton. Make : Omega Elevators. |
| 93 | All as per item No. 74 here-in-before but of capacity 0.5 Ton at Knowledge Centre lift. Make : Supriya Elevators. |
| 94 | All as per item No. 74 here-in-beforeQuality centrelift of capacity 1.0 Ton. Make : Kone |
| 95 | All as per item No. 74 here-in-before1 Ton at IWS building lift. Make : Schinder |
| 96 | All as per item No. 74 here-in-before PCDA building lift capacity 1 ton. Make :- Johnson. |
| 97 | All as per item No. 74 here-in-before TPMC building lift capacity 1Ton. Make:- Kone |
| 98 | All as per item No. 74 here-in-before RCMA Building lift capacity 1 Ton .Make:- Kone |
| 99 | Supply & Fix door closer of landing doors of make as per OEM complete all as specified and directed. |
| 100 | Replacement of matting in car cabin of1 to 2 ton capacity Lifts complete all as directed. |
| 101 | Supply, fixing, testing and commissioning of Microprocessor progammed Elevator/ LiftControl Mother board suitbale for full collective lift serving upto G+4 floors, with and including software, taking out old u/s one, complete all as directed. Make: Kone/Jhonson/Schindler |
| 102 | Supply, install, testing and commissioning to automatic rescue device (ARD) includes Mirco processor programmed ARD Mother board,connected sensors complete comprising with the following accessories including taking out carefully old ARD from the machine room complete all as directed:- (a)UPS suitable for Lift Motor of goods/passenger lift - 01No.(b)Maintenance free dry battery suitable for UPS(12 V 17AH) of lift - 08 Nos.(c)SMPS - 01 No.(d)Transformer suitable to Lift motor - 01 No.Make : Kone, Schinder, Jhonson. |
| 103 | Supply, fixing, testing and commissioning of Door Drive 2 HP, suitbale for existing lift of any make, with and including takingout old unserviceable door drive, complete all as directed. Make: Fuji/Yasakawa |
| 104 | Supply, fixing, testing and commissioning of Variable Voltage Variable Frequency drive 10/12.5/15HP suitable for lift of any type with and including feeding necessary parameters and taking down old unserviceable drive, complete all as directed.Make: Fuji/Yasakawa |
| 105 | S & F in repairs Car ceiling along with lights and fan suitable for existing lifts of 1 to 2 ton capacity of any make complete all as directed. |
| 106 | Supply fixing and testing of Emergency interlinked telephone connection withall accessories and fitting one in the lift, 3 out side lift and one in building main office with all accessories as directed by Engr-in Charge. |
| 107 | Supply and fixing repair / replacement of12.5 to 15 HP3 phaseInduction motorliftin machine room with all fitting accessories required at site as directed by engr in charge. |
| 108 | Supply and fixing of 12V 17AH maintenance free drybattery.Make exide,Amron |
| 109 | Supply only Power Contactor 32 to 40 Amps ACI type with 110 Volt coil voltage, three phase. |
| 110 | Supply only Power Contactor 40 to 70 Amps ACI type with 110 Volt coil voltage, three phase. |
| 111 | Supply only spare kit for 32 to 40 Amps ACI contactor of any type |
| 112 | Supply only spare kit for 40 to 70 Amps ACI contactor of any typeMake for srl item 85 to 88 : L&T/BCH/C&S/Telemech |
| 113 | Supply only push button of any type, Make : L&T/GE. |
| 114 | Supply onlyBimetal over load relays for contactors Make for srl item No. 89 & 90 : BCH/L&T/C&S/Telemech. |