| 1 | Dismantalling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet) |
| 2 | Making Bandha with Sand Bags, soil and other ways…… etc….. Including all complete. |
| 3 | Dewatering naala by using 20 HP Pump ………………. Including all item. |
| 4 | Dismantalling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet) |
| 5 | Earth work in cutting ………………….. Including all complete. |
| 6 | Cartage of malva from site up to 8km distance including loading & uploading, T&P etc. requried for proper of work as direction by Engineer-In-Charge. (PWD SOR 2022-23, Chepter-3, Item no. 213a) |
| 7 | Class-150 Brick work in 1:4 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) |
| 8 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.(PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1) |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 10 | Proving and laying cement concrete in 1:4:8 Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 3 spec. No. 4.1) |
| 11 | Providing and laying in position specified grade of Reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) DSR- 5.1.2 |
| 12 | Reinforced cement concrete work in beams, lintels suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level upto floor five level, including the cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chapter-5, Item No. 5.3) |
| 13 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) |
| 14 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 15 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1.3) |
| 16 | Supply and fixing manak board……….. All complete |
| 17 | Construction of silla patt board using brick work and granite stone complete………. All complete. Please Enable Macros to View BoQ information |