| 1 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) |
| 2 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1) |
| 3 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) |
| 4 | Proving and laying cement concrete in 1:4:8 Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 3 spec. No. 4.1) |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) . (PWD SOR 2025-26, Chepter-5, Item No.9 Spec no. 5.2) |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWDSOR 2022-23 Chapter No-05 Item No. 5.2spec. No. 5.2.2) |
| 7 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side fromwork ........... 1501 (approved Quarri grit) (PWD SOR 2025-26, Chepter-12, SI N0 11) |
| 8 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) . (PWD SOR 2025-26, Chepter-5, Item No.9 Spec no. 5.1) |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 10 | M.S Speciefication Board including painting & writing |
| 11 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |