| 1 | Dismatalling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). (PWD SOR 2022-23, chapter-17, Item No.4 Sec. No. 692). |
| 2 | Cartage of malva from site up to 8km distance including loading & uploading, T&P etc. requried for proper of work as direction by Engineer-In-Charge. (PWD SOR 2022-23, Chepter-3, Item no. 213a) |
| 3 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or into plinth and removal and disposal of surplus earth as directed by thr Engineer in charge up to a distance of 30m from the foundation trenches.(PWD SOR 2025-26, chepter-4, Item No.01 Spec-251) |
| 4 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required for completion of work and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2022-23 Chapter No-05 Item No. 273 spec. No. 5.4.1. |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No. 8 spec. No. 5.1) |
| 6 | Reinforced cement concrete work in beams, lintels suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level upto floor five level, including the cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chapter-5, Item No. 5.3) |
| 7 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1) |
| 8 | 12mm Cement plaster with cement mortar inproportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth (PWD SOR 2022-23 Chapter No-13 Item No. 13.4) |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23 chapter-5, Item No. 5.3) |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 11 | Mild steel and Iron work of small size and section such as holding down woods, hold fast tierods, gratng, etc. (when not included in and over all rates) brought to required from including cost of bolts, nuts if required for proper completion of work including fabrication of holes in door chaukhats and nosing (PWD SOR 2022-23, Chapter-10, SI No. 502) |
| 12 | Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymee coated J or L hooks, bolts and buts 8 mm diameter with bitumen and G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paints on overlapping of sheets complete (Up to any pitch in horizontal/vertical or curved surface), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 1.00 mm thick with zinc coating not less than 275 gm/m2. (PWD SOR 2022-23, Chepter-11, Item No. 12.1.1) |
| 13 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) |
| 14 | Supply & Laying of I-Shaped & zig-zag precast interlocking tiles of thickness 80 mm ordinary Grey (compressive strength not be less than 30 Mpa and weight 4.50 kg) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. (PWD SOR 2022-23 Chapter No-20 New Item) |
| 15 | Supply & Laying of I-Shaped & zig-zag precast interlocking tiles of thickness 80 mm ordinary Grey (compressive strength not be less than 30 Mpa and weight 4.50 kg) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. (PWD SOR 2022-23 Chapter No-20 New Item) |
| 16 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1.3) |
| 17 | Finishing walls with putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all materials, labour, T&P etc. required for proper completion of work. (PWD SOR 2022-23, Chepter-15, SI No. 31 Item No. New) |
| 18 | Distempering (first coat) with oil bound distemper of approved brand and manufacture and required shade on undercoated wall surface to give an even shade over & including a priming caot with cement primer of approved brand and manufacure such as Berger, J&N, shalimar, Asian Paints after throughly brushing the surface free from mortar droppings and other froeign matter and also including preparing the surface even with plaster of approved synthetic material and sand papered smooth including cost of all materials. (PWD SOR 2022-23, Chepter -15, SI NO. 649) |
| 19 | Painting two coat over priming coat (but excluding caot of priming caot) on streel and other metal surface upto 10cm width of girth or small articles not exceeding 0.10 SqM. In area with superior synthetic enamel such as Luxol 3, Hi golss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foregin matter sand papering and scrapping including cost of all materials, labours, tools and paints etc. required for proper completion of work,. (PWD SOR 2022-23 Chepter-15, Item No. 2(19.29)+642 |
| 20 | M.S Speciefication Board including painting & writing |
| 21 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |