| 1 | Excavation for Structures: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 2 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC M-15) |
| 3 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification As per MORT&H Specification no. 12.03. |
| 4 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC M-30) |
| 5 | Reinforced Cement Concrete in Super Structure complete as per Drawing and Technical Specifications. (RCC M-30) |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specification clauses 1000 and 1202. |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawings and technical specification clauses 1002,1010 & 1202. |
| 8 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 9 | Brick masonry work in cement mortar (1:3) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 |
| 10 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 11 | Drainage Spouts complete as per drawing and Technical specification. As per MORT&H SPecification No. 14.9 |
| 12 | Dewaterng of water trenches during excavation, concreting, masonary works upto sub soil/ water level including hire charges of 5 H.P. |
| 13 | Pointing with cement mortar (1:3) on brick work as per drawing and technical specification clauses 613.3 and 1204 |
| 14 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. |
| 15 | Supply and Laying 1000 mm Dai NP-3 Hume Pipe Please Enable Macros to View BoQ information |