| 1 | Site clearence |
| 2 | Earth Work, excavation in trenches forfoundation in ordinary soil including lift upto 1.5m and lead upto 50m and disposal of surplusearth (As per PWD SOR Basti item No-251) |
| 3 | Concrete with 2.0 cm.gaugr stone ballast,linesand of fineness modulus and cement in theproportion 8:4:1 in foundations and under floorsincluding supply of all materials labiur and toolsand plants etc. required for the proper Complationof work. SI NO 275 |
| 4 | Class 150 brick work in foundatin upto plinth incement mortar 1.3 including supply of allmaterials labours ,tools and plants require forproper completion of the work .As per PWDSOR item no.307 DED FOR DOOR AND WINDOWS |
| 5 | Providing and laying 25mm thick damp proofcourse with cement concrete 1: 2:4 includingsupply of all material labour, T&P etc.requiredfor proper completion of work (As Per PWD SORBasti item No.361) |
| 6 | Laying R.C.C work with 1:1.5:3 with core sand &20mm stone gritt & all etc. SI NO 284A BOTTOMPlinth,Lintel Beam CCCPB |
| 7 | Mild steel or Iron work in R.C.C includingcutting at 1.25% of R.C.C QTY SI NO 504 |
| 8 | 12 mm thick plaster 1:3 cement mortar & all etc.complete in walls SI NO 582 Ded. Doors & Windows, Ventilator |
| 9 | Earth work filling for plinth area cartage earthwith 5 km. SI NO 253 |
| 10 | Supply & fixing of w.c 450x600 mm toilet seat asper market rates |
| 11 | Supply & fixing of boring and handpump as permarket rates |
| 12 | S/F of Aluminium/Fibre Doors & Windows withall necessary item.Door |
| 13 | Ventilator |
| 14 | Windows |
| 15 | S/F of 1000 ltr. Over head watertank. |
| 16 | S/F 1 HP water pump |
| 17 | S/F of Urinal set |
| 18 | S/F of Wash Basin |
| 19 | Flooring cement concrete flooring in 1:2:4 laid inone layer finished with a floating cout neatcement over .80 mmthickness base concrete SINO 601a |
| 20 | providing laying cermica tiles in flooring laid onabed of 20 mm cement mortar 1:4 for finishedwith flush pointing with white cement slurry sor(D.S.R 8.2.2) |
| 21 | Providing & applying white cement and two coatoil paint of average thickness 1mm & all complteetc.SI NO 23 NBO 18:57 |
| 22 | Providing & applying two coat oil paint ofaverage thickness 1mm & all complte etc.SI NO23 NBO 18:58 |
| 23 | S/F of iron gate |
| 24 | Add watersupply,sanitary,contingency,misgexpressinstalation including cost of construction of septictank etc.for proper disposal of sewage ofestimated cost. |
| 25 | S/F of sing board |
| 26 | Add for Electrification including fans & all etc.complete 4% at estimated cost. |
| 27 | Add for G.S.T. @ 18% Please Enable Macros to View BoQ information |