Name of Work:- Construction Of Cement Concrete Road In Mete Wasti At-Ujani (Te) Tal-Madha Dist- Solapur
Sl. No.
Item Description
1
Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.
2
Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete.
3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading I (Using Screening Typ B (11.2 mm) Aggregate)
4
Providing and laying Cast in situ / Ready Mix cement concrete in M15 of trap/ granite/ quartzite/ gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
5
Providingf and fixing information sign board os size 1.20 x 0.90 M. prepared on 16 guage M.S. sheet with horizontal bracting of M.S. Angle Of size 35 x 35 x 6 mm including painting with one coat of zinc cromzte primer and two coats oil painting, including two number of M.S. angle iron post of size 50x50 x 6 mm of 2.70 m Long, including conveying, all taxes fixing in ground with cement concrete 1:4:8 block of 45 x45x 45 cm. size as directed by Engineer in charges eetc. complete.
6
Royalty Charges - (Sand)
7
Royalty Charges - (Others Material)
8
Test - C.C Cube ,Compressive Strenth Of C C Cube M-15
9
Add GST Charges 18 % Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.