| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge, within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) |
| 4 | Centering and shuttering including strutting , propping etc and removal of form for - Walls (any thickness ) including attached pilasters , butteresses , plinth and string courses etc. |
| 5 | Extra for making chequers of approved pattern on cement concrete floors , steps, landing , pavements etc., |
| 6 | Finishing walls with textured exterior paint of required shade - New work (Two or more coats applied @ 3.28 ltr / 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg / 10 sqm |
| 7 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc.complete |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade- One or more coats on old work |
| 9 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq.metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground as per direction of Engineer-in-charge - with cement mortar 1:4 (1 cement : 4fine aggregate) |
| 10 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40 mm dia .M.S.tube 1.5m centre to centre , horizontal & vertical tubes joining with cup & lock system with M.S.tubes, M.S.tube challies, M.S.clamps and M.S.staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the buildingetc wherever required for inspection of work at required locations with essential safety features for the workmen etc.complete as approved. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. (Note: This item to be used for maintenance work judicically, necessary deduction for scaffolding in the existing item to be done.) |
| 11 | Providing and laying of Non shrink free flow micro concrete Renderoc RG or equivalent in the proportion 1:1 (One Renderco RG: One graded stone aggregate of 12.5mm and below through the drilled holes till the voids and damaged area are completely filled and set to an average thickness of 50mm as directed by the Engineer-in-charge. |
| 12 | Providing leak proof centering and shuttering using 25mm thick plywood for damaged slab/beam to carrying out micro concreting work including sealing the gaps if any with Renderoc plugging compound and removal of form work. |