| 1 | Note: The bidder shall note that he may be asked to execute the works detailed below anywhere within the refinery premises wherever requirement arises, irrespective of his Group/Zone of work for which no additional/extra payment may be entertained. Bidder shall make note of this and shall quote accordingly. |
| 2 | Clearing the area of grass, rank vegetation, wild growth, bushes, treesand plants upto 30 cm girth measured at a height of 1.0M above groundlevel, road side berms, under pipelines and structures, tank farms, drains, yards etc. by removal of grass, plants etc. by scraping completely from ground and making good the area disturbed, collecting all removed vegetation etc. bundling into heaps and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge- For Unpaved/Earth areas |
| 3 | Clearing the area of grass, rank vegetation, wild growth, bushes, treesand plants upto 30 cm girth measured at a height of 1.0M above groundlevel, road side berms, under pipelines and structures, tank farms, drains, yards etc. by removal of grass, plants etc. by scraping completely from ground and making good the area disturbed, collecting all removed vegetation etc. bundling into heaps and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge- For Paved/Developed areas |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level in undeveloped areas, collecting all removed vegetation etc. bundling into heaps and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge. |
| 5 | Trimming and prunning of trees by cutting off dry / live branches of developed trees by using ladder etc. including loading, unloading and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge. Item includes all required labour, tools and tackles, supervision, safety permits,safety precaution etc. complete-For trees of height 5 to 8 metres |
| 6 | Trimming and prunning of trees by cutting off dry / live branches of developed trees by using ladder etc. including loading unloading and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge. Item includes all required labour, tools and tackles, supervision, safety permits,safety precaution etc. complete-For trees of height above 8 metres |
| 7 | Providing services for cutting/chopping down of weak/fallen trees trees including removal of the branches and roots to a lead of 100 metres andstacking them by deploying 1 chain saw cutting machine-petrolrun engine of Hitachi /Honda /Maax /Mitsubishi /Kawasaki/ Ouligen /Bosch make of minimum 50 cccapacity/3HP Power and minimum 20\" bar length with chain pitch of 0.325inches (Oregon or equivalent make) 1 skilled operator for running thepower/petrol driven wood cutting saw machine and 3 semi-skilled workmenfor assistance with necessary tools and tackles such as manual saw, crowbar, cutting knife,ropes, other tools required to carryout the job etc.inside refinery premises including MTF and TTP area as directed byEngineer-in-charge during general shift hours (0730 - 1600 hours) on CPCL working days (Unit ofmeasurement shall be lumpsum per day).Cost includes charges ofpetrol/oil and other consumables for running the machine and all labour,tools,supervision, ESI, EPF and contractor overheads. |
| 8 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots,stacking of serviceable material at designated locations inside the refinery premises and disposal of unserviceable material outside the Refinery premises at designated places in CPCL Ammullaivoyal land up to a distance of 7km as directed by EIC with contractor\"s own transport, all tools, tackles, labour etc. all complete as directed by the Engineer-in-Charge. |
| 9 | Same as #80 for Beyond 30 cm girth upto and including 60 cm girth |
| 10 | Same as #80 for Beyond 60 cm girth upto and including 120 cm girth |
| 11 | Same as #80 for Beyond 120 cm girth upto and including 240 cm girth |
| 12 | Same as #80 for Above 240 cm girth |