| 1 | Earth work in cutting or in embankement in ordinary soil+loading ,unloading cartage upto 3.00 km [As per S.i. No-253,231(a)235(a)] |
| 2 | Earth work in filling by cartage earth including loading & unloading cartage from 4.00 km. distance from out of city. |
| 3 | Boaring of 20cm dia piles of single under reamed of 50 cm dia of bulb and 3.00 meter depth in black cottan soil with hand operated augur machine including all labour T& P etc.(new item 1 chapter -4) |
| 4 | Sand filling in plinth including supply of necessary quality of sand from a distance not exceeding 8km(5miles) from the side of work & including watering dressing etc. Rate to include cost of all materials labour and tools & plants etc. required for proper completion of the work.(As per S.I. No-255) |
| 5 | P/L of C.C in 1:4:8 (1 cement :4 f.sand:8 stone ballast) including supply of all materials T&P etc labour required for the proper completion of the work. (As per S.i. No-281) |
| 6 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As per S.i. No-273) |
| 7 | Providing and Laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 8 | P/L of C.C in 1:1½:3 (1 cement : 1½f.sand:3 stone ballast) including supply of all materials T&P etc labour required for the proper completion of the work. (As per S.i. No-273) |
| 9 | Class -150 brick work in 1:4 cement and coares sand mortar.(As per S.I. No-305) |
| 10 | 12mm thick plaster on brick work in 1:4 cement and coare sand mortar.(As per S.i. No-584) |
| 11 | RCC work width 1:2:4 cement, coares sand and 20mm guage stone grit.(As per S.I. No-283) |
| 12 | Mild steel In R.C.C. work.(S.I. 504) |
| 13 | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 14 | Raised pointing in 1:4 cement mortar including supply of all material T&P etc required for the proper completion of the work |
| 15 | S/F of ms angle, iron door, windows, vantilation frame etc. (As per S.I.new item No-2) |
| 16 | Providing and applying white cement based putty.(As per S.I. No-662-13.8) |
| 17 | Finishing walls with premium Acrylic smooth exterior paint with silicone additives of required shade. New work two or more coat applied.( As per S.I. No-1.47.1) |
| 18 | Painting & varnishing new iron work.( As per S.I. N0-641) |
| 19 | Supply & fixing of LED Tube Light with batten suitable for up to 1 x 22 watt LED tube light complete including tube etc on surface complete in all respects.(CAT: AA) |
| 20 | Supply & fixing of industrial bulk head fitting with polycarbonate base guard, prismatic reflector silicon gasket suitable for and with 1 x 18 Watt CFL complete in all respect |
| 21 | S/F of Ms tubular Street light pole 7.00 meter long as per direction Engineer in charge in market rate. |
| 22 | Supply and erection of AC 1200mm Sweep, 220/240 Volts, 50 Hz ceilling fan with regulater standar down rod, blades including connection etc. complete as required |
| 23 | Wiring for light point/fanpoint/ exhaust point/ call bell point with 1.5 sqm PVC insulated copper cable(Electrical DSR No-1.1.1) |
| 24 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes |
| 25 | Supply & fixing ridges valleys & gutter for iron roofing all etc tools S.I. No-537 |
| 26 | Supply & fixing Galvanized corrugated iron foofing 24 B.W.C. in position including supply of materials labour and tools and plants etc. (As per S.i. No-536) |
| 27 | S/L of 100 mm dia PVC pipe S.I. No-36 extra item |
| 28 | S/F of bib cock all complete. |
| 29 | S/F of brass stop bib cock all complete. |
| 30 | S/F of PVC Water tank all complete. |
| 31 | PVC Pipe 25 mm dia ISI mark. |
| 32 | S/F Ceiling Fan all complete. |
| 33 | supply of fixing of high marshal light including all material and labour T&p etc requred for proper completion the work |
| 34 | Providing and applying of 8 to 10 mm thick ivory or light shade vertified tiles of 600x600 mm size in flooring laid with 1:3 xement sand morter finising with cement slurry & with pigment grouting and polishing complete I/C S/O all material labour T&P ETC required for proper cpmplete of work. |
| 35 | Cross Drainage work of 1.00 Mtr. Span Please Enable Macros to View BoQ information |