|
| 1 | Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore |
| 2 | Development of tube well as per IS specification using suitable compressor to give sand free water for required yield of the gravel packed tube well. |
| 3 | Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/1992) of grade Fe410 of following nominal bore sizes at site of work. 200 mm dia |
| 4 | Supply of strainer pipes made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985 of following nominal bore sizes at site of work. 200 mm dia |
| 5 | Testing verticality of tube-well by plumbing system and yield test and draw down test by pumping system as per IS: 2800 (Part II) 1979. |
| 6 | Supply and fixing of tube well cover of M.S. sheet (6mm thick) with nuts and bolts complete for casing size: 200 mm dia |
| 7 | Supply and fixing of M.S. clamp set of 50 ×6mm flat iron with nuts and bolts etc. for holding the riser pipe assembly of submersible pump set. |
| 8 | Providing & lowering of G.I. flange pipe B Class including rubber washer and nuts of 8 mm dia complete in all respect. |
| 9 | 50 mm dia |
| 10 | 75 mm dia |
| 11 | P/Laying ISI marked P.V.C. insulated submersible cable confirming to(IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, existing pipe / open trench / Cable tray / on surface including making connection etc. as required. For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR 10.0 Sq.mm 3 core flat / Round |
| 12 | Co-ordination chart of OEM in Existing Panel with circuit breaker having inbuilt overload protection or separate thermal Overload relay , Short circuit, phase loss protection, suitable Contactors, including wiring between switchgears, Indicating lamps for R,Y,B,ON,OFF, Push button for ON, OFF, Volt meter, Ammeter, selector switch for local/remote, auto/manual/OFF operation. Cast resin CT\"s, provision for potential free contacts making connection, testing etc. as required. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \"A\" attached with this BSR . Star - Delta Starter with following Motor rating Motor rating 9.0 KW |
| 13 | Providing & Laying of Polypropylene rope Confirming to IS:5175 for submersible pump of following sizes. complete in all respect. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \"A\" attached with this BSR . 16mm (suitable above 50mm & up to 75mm OD pipe) |
| 14 | SITC of Radial / mixed flow ISI marked water and anti-corrosive liquid filled submersible motor pump sets suitable for 100/150mm dia borewell. The size of adopter fixed on top of the motor should exceed the top of coupler , for safegaurd the coupler. The construction material of motor and pump should match IS: 8034 : 2018 and IS: 9283 guideline. The radial flow pumpset should operate at 5 star energy efficiency level of BEE and mixed flow pump set should operate at 3 star energy level of BEE, accompained by valid BEE certificate. Motor should be IE2 class as per IEC 60034-2-1: 2007, IEC 60034-30: 2008, & IS12615:2011 with required accessories including making connection suitable for Bore well. The job includes labour part of lowering of riser pipe G.I./ H.D.P.E. with rope, cables & pump, installation of complete fitting and accessories, jointing of electrical cables up to Starter. All labour for testing of submersible pumps set and supply of water to water mains, complete in all respect. OEM shall have submit NABL / CPRI / ERDA accrediated lab type test certificate before execution. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \"A\" attached with this BSR . 5.0 HP, 1-Ø, (56 - 236)Mtr, (90 - 25) LPM Copper wound |
| 15 | Providing, lowering, laying, aligning, fixing in position in pipe line, manually operated CI D/F Sluice valves of approved make (IS: 14846 amended upto date) PN 1.0 class of following dia complete (including jointing and jointing material) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 80 mm dia |
| 16 | Providing, installation, testing and commissioning of Bulk Flow Meter with removable mechanism class \"B\" confirming to ISO: 4064/1 including all materials (excluding CI/DI fittings) and making connection with existing pipeline required for Bulk Flow Meter including cutting the existing pipe line etc complete in all respect as per technical specification and as per direction of Engineer. BFM80 for DN 80 mm Please Enable Macros to View BoQ information |